12
C
12
1-11
1-12
1-13
C
12
C
12
1-14
C
12
5
4
3
1
2
1
2
3
4
5
6
INS
TALLER
US
ER
MAINTEN
AN
CE TECHNI
CI
AN
• Extensions for Ø 60/100 horizontal kit
(Fig. 1-12). The kit with this configuration can
be extended up to a
max. horizontal length of
3 m
including the terminal with grid and ex-
cluding the concentric bend leaving the boiler.
This configuration corresponds to a resistance
factor of 100. In this case the special extensions
must be requested.
Note:
when the boiler is installed in areas where
very cold temperatures can be reached, a special
anti-freeze kit is available that can be installed as
an alternative to the standard kit.
Horizontal intake - exhaust kits Ø 80/125.
Kit
assembly (Fig. 1-13): install the bend with flange
(2) onto the central hole of the boiler inserting
the gasket (1) and tighten using the screws inclu-
ded in the kit. Fit the male end (smooth) of the
adapter (3) up to the end stop on the female side
of the bend (2) (with lip seal). Fit the Ø 80/125
(4) concentric terminal pipe with the male end
(smooth) to the female end of the adapter (3)
(with lip gasket) up to the end stop; making
sure that the internal and external wall sealing
plates have been fitted; this will ensure sealing
and joining of the elements making up the kit.
• Extensions for Ø 80/125 horizontal kit
(Fig. 1-14). The kit with this configuration
can be extended up to a
maximum length of
7.3 m
, including the terminal with grid and
excluding the concentric bend leaving the
boiler and the adapter Ø 60/100 in Ø 80/125.
This configuration corresponds to a resistance
factor of 100. In this case the special extensions
must be requested.
1.11 CONCENTRIC HORIZONTAL KIT
INSTALLATION.
Type C configuration, sealed chamber and
fan assisted.
The position of the terminal (in terms of distan-
ces from openings, overlooking buildings, floor,
etc.) must be in compliance with the regulations
in force.
This terminal is connected directly to the outside
of the building for air intake and flue gas exhaust.
The horizontal kit can be installed with the rear,
right side, left side or front outlet. For installation
with frontal outlet, one must use the fixing plate
and a concentric bend coupling in order to ensure
sufficient space to carry out the tests required by
law upon commissioning.
• External grid. Both the Ø 60/100 and Ø 80/125
intake/exhaust terminal, if properly installed,
is pleasant to look at on the outside of the buil-
ding. Make sure that the external silicone wall
sealing plate is properly inserted in the wall.
Horizontal intake - exhaust kit Ø 60/100.
Kit
assembly (Fig. 1-11): install the bend with flange
(2) onto the central hole of the boiler inserting
the gasket (1) and tighten using the screws in-
cluded in the kit. Couple the concentric terminal
pipe Ø 60/100 (3) with the male end (smooth)
into the female end (with lip seals) of the bend
(2) up to the stop, making sure that the internal
and external wall sealing plate have been fitted,
this will ensure sealing and joining of the kit
elements.
The kit includes:
N° 1 - Gasket (1)
N° 1 - Concentric bend Ø 60/100 (2)
N° 1 - Adapter Ø 80/125 (3)
N° 1 - Concentric intake-exhaust terminal Ø 80/125 (4)
N° 1 - Internal wall sealing plate (5)
N° 1 - External wall sealing plate (6)
The kit includes:
N° 1 - Gasket (1)
N° 1 - Concentric bend Ø 60/100 (2)
N° 1 - Int./exhaust concentric terminal Ø 60/100 (3)
N° 1 - Internal wall sealing plate (4)
N° 1 - External wall sealing plate (5)
Содержание EOLO MYTHOS DOM 10 1E
Страница 1: ...EOLO MYTHOS DOM 10 18 24 1E Instructions and warning book 1 041321ENG ...
Страница 2: ......
Страница 34: ...34 ...
Страница 35: ...35 ...