24
170
420
320
280
A
B
H
Instructions for the installer
FLOOR OF THE HEATING
CONTROL UNIT
TO
CONDENSATE
DRAIN
The top generator of the
drain pipe must not be
higher than the bottom of
the pan.
A load cock must be provided on the central heating
circuit in order to fill the system, or use the optional
accessories.
The boiler is equipped with its own draining valve,
Sc
.
This valve must never be used to empty the system,
since all of the dirt contained in the system may accu-
mulate in the boiler, jeopardising smooth operation.
Therefore, before using the draining valve, make sure
that the system’s interception cock situated under the
pump has been closed.
The system must be equipped with its own emptying
valve, of a suitable size for the flow rate of the system.
Condensate drain
During the combustion process, the boiler generates condensate that
flows into the drain trap through pipe “A”.
The condensate that forms inside the boiler must flow into a suitable
drain from pipe “B”.
Danger!
Before commissioning the appliance:
- make sure the drain trap has been assembled cor-
rectly (* H = see the drawing dimensions below)
- fill the drain trap and check correct condensate
draining
If the appliance is used with an empty condensate
drain trap the danger of poisoning subsists following
a flue gas leak.
H =
Drain trap head
Flow rate conditions 0 and Fan Head Max.
ARES PRO 150 - 230
= 420 mm
ARES PRO 300
= 320 mm
ARES PRO 348 - 400 - 500 - 600
= 280 mm
Connection between the appliance and the domestic
wastewater disposal system must be carried out in
compliance with the specific regulations of reference.
If you do not want to or are able to create a platform,
it is possible to install the boiler on the floor and set
up the trap at a depth of 250 mm.
STD.005480/001
Содержание ARES PRO 150
Страница 2: ...STD 005480 001 ...