ATTENTION!
It is forbidden to interpose elastic materials of any nature or size between the base of the machine and the floor.
ATTENTION!
Do not install the washing machine on the floors without verification by a competent technician who can assess
the impact of the dynamic load on the floor andbuilding.
In these installations the manufacturer declines all responsibility for possible damage caused by vibrations.
Rigid washer-dryers must all be fixed to the ground.
Rigid machines with capacities from 30kg and above, are supplied with a steel subframe.
-
the subframe must be drowned in a concrete basement properly anchored to the floor.
-
before anchoring the machine to the basement make sure that the concrete has taken hold and, very
importantly, that the subframe is perfectly bubbled.
-
place the machine in the appropriate anchor holes and tighten all the coupling bolts well.
From the attached technical sheet, the measures of the counterframe and the concrete base can be noted.
Land rigid machines with a capacity of up to 23kg are delivered with the equipment of anchors.
Steel anchor
The equipment necessary for installation are:
-
Percussion drill or electropneumatic dowel.
-
Martello.
-
Pomp for cleaning.
-
Pipe cleaner.
-
Key dynamometer.
Follow the steps below:
-
Pprepare a concrete base suitably anchored to the floor, according to the minimum dimensions shown in the
technical sheet.
-
To make sure that the concrete base is anchored to the floor, that it has taken hold and that the surface made
is perfectly bubbled.
-
To get the machine off the pallet and place it in its final position above the concrete base.
-
Through the open panels mark on the concrete base the points where the steel anchors must be positioned,
corresponding to the holes in the metal base of the washing machine.
-
Spot the machine to clear the drilling areas.
-
And follow the drilling (see-figure) at the points previously identified and based on the technical data