background image

 

   

10   

Chapter   4   
4.1                     Operation   steps   and   Maintenance   Instructions                  

1)

 

The   machine   should   work   according   with   operation   program   strictly.   

2)

 

Pump   work   without   water   or   syrup   is   prohibiting.   

3)

 

Outsourcing   parts   in   the   machine   should   be   examined   and   maintenance   according   with   

related   operating   instruction.   

4)

 

If    the    machine    will    be    stop    work    for    a    long    time,    the    steeper    in    all    filter,    pot,    pipeline,   

carbonization   machine,   pump   should   be   discharge   completely.   Then,   close   related   valves   

as   well   as   do   a   cleaning   to   the   surface   of   the   machine.   Water   is   prohibited   to   spatter   onto   

motor   of   pump   and   related   electrical   apparatus.   

Note:   the   machine   should   be   operated   and   maintenance   by   professional   staff   who   has   some   

professional   technique.   

The   operator   should   operate   the   machine   according   with   operating   instruction.   If   unusual   

phenomenon   happens,   turn   off   switch   and   carry   out   some   measure   to   solve   it.   

   

Содержание IMCQHS Series

Страница 1: ...1 IMCQHS Series of Drink Mixer INTERNATIONAL MACHINE CONCEPTS WELCOMES YOU TO YOUR NEW MACHINE Operation Manual Date 2015 Version 1 Serial Number...

Страница 2: ...tallation 1 3 Electrical and Pneumatic connections 1 4 Chapter 2 Technical Parameters and Description 2 1 Chapter 3 Operation Instruction Main Construction 3 1 Production system instruction 3 2 Mechan...

Страница 3: ...f food sanitation law 1 2 Un crating Instructions During un crating make sure that no physical damage to the outside of the crate has taken place Carefully break open the exterior panels to reveal the...

Страница 4: ...chine should be placed on level ground After installing the machine check if the machine is level by Level Instrument If not please adjust the four legs Check every part of the machine carefully for d...

Страница 5: ...chilled water 0 4C0 Inlet pressure of chilled water 0 01Mpa 0 08Mpa Inlet temperature of syrup 2 8 C0 Inlet pressure of syrup 0 01Mpa 0 08Mpa Inlet pressure of CO2 0 7Mpa 0 8Mpa Purity of carbon dioxi...

Страница 6: ...e static mixer The corrugated plate in the static mixer increases the meet area and time When the beverage after desecrated enter into the inlet of the static mixer put the CO2 gas of 0 6Mpa into stat...

Страница 7: ...the syrup and water pipe to a large position See produce operation program to sterilize the order of sterilization is as below Syrup pot open or close related valves and discharge waste water Static m...

Страница 8: ...of carbonization flow meter to 2 5 3 5m3 h c Adjust productivity namely adjust the metering valve shows on LZB 40 flow meter d Adjust the ratio between syrup and water according with different need o...

Страница 9: ...now to discharge gas Or else turn off the machine and do a examination Production finished Before finishing production turn syrup pump work button to 0 position stop feed into syrup watch window openi...

Страница 10: ...g time the steeper in all filter pot pipeline carbonization machine pump should be discharge completely Then close related valves as well as do a cleaning to the surface of the machine Water is prohib...

Отзывы: