8   

pot   according   with   the   product   need.   

Note:   the   show   value   is   consulted   only.   Specific   value   is   determined   by   beverage   type,   filling   
machine   need   and   temperature   etc.   

2)

 

Connect   power   supply,   power   light   came   on.   

3)

 

Open   CO

2

   gas   bottle,   adjust   the   output   pressure   to   0.7Mpa,   and   keep   the   pressure   stable.   

Turn    prepare    pressure    switch    to    “I”    position,    open    CO

2

    inlet    gas    valve    slowly.    adjust   

prepare    pressure    to    0.4~0.5Mpa    using    filter    and    pressure    reducing    valve    to    prepare   

pressure   to   the   machine,   at   this   time,   the   surplus

   

   of   CO

2

   gas   coming   into   storage   pot.   

Carbonization   adjusted   to   0.4Mpa   and   0.6Mpa.   

4)

 

Switch   the   water   pump   on-­‐off   to   manual   position.   Water   pump   running   while   indicator   

light    of    water    pump    running    comes    on.    When    the    water    level    of    liquid    level    indicator   

shows   raise   to   set   height,   turn   switch   of   water   pump   button,   water   pump   stop   work   while   

water   pump   running   go   out.   

5)

 

Turn    syrup    pump    work    button    to    “I”    position,    syrup    pump    running    while    syrup    pump   

running   indicator   light   come   on.   when   liquid   level   in   the   syrup   pot   raise   to   set   position,   

syrup   pump   stop   work   automatically   while   syrup   pump   running   go   out.   

6)

 

When   the   pressure   gauge   on   the   storage   pot   shows   0.3Mpa,turn   carbonization   pump   to   

manual   position,   carbonization   pump   running   while   carbonization   pump   running   indicator   

light   come   on,   carbonization   pump   should   be   adjusted   in   order   when   running.   

a)

 

Check    against    the    filter    reducing    valve    used    for    carbonization    at    0.6    Mpa,    filter   

reducing   valve   used   for   prepare   pressure   at   0.4-­‐0.5Mpa.

   

b)

 

Adjust   the   show   value   of   carbonization   flow   meter   to   2.5-­‐3.5m

3

/h.

   

c)

 

Adjust   productivity,   namely,   adjust   the   metering   valve   shows   on   LZB-­‐40   flow   meter.   

d)

 

Adjust   the   ratio   between   syrup   and   water   according   with   different   need   of   product.   It   

can   be   carried   out   by   adjusting   ration   needle   valve   on   the   syrup   pipeline   and   prepare   

carbonization    pipeline.    And    sugar    degree    containing    should    be    examined    through   

sampling   valve   below   LZB-­‐40   flow   meter.

   

When   liquid   level   shows   on   storage   pot   level   indicator   raise   to   set   height,   turn   

carbonization   pump   button   to   stop   position,   carbonization   pump   stop   work   while   

carbonization   pump   running   indicator   light   goes   out.   

Note:   this   step   should   be   operated   consult   “4”’s   steps   supplying   water   into   water   

storage   pot.   Watch   gas   containing   condition   form   sampling   valve   below   storage   pot.   
Meanwhile,   electromagnetic   valve   on   syrup   storage   pot   should   disgorge   gas   timing,   

prepare   pressure   indicator   light   of   regulator   cubicle   come   on.   

Produce   starts:   if   step   above   is   correct   and   prepare   pressure   is   done,   the   machine   can   

start   running,   namely,   turn   the   button   of   water   pump   and   carbonization   pump   to   “auto”   

position,   then,   open   product   exit   ball   valve   below   the   storage   pot.   Thus,   product   can   be   

sent   into   filling   machine.   

When   filling   machine   moves   about   two   cycles,   examine   the   beverage   in   the   bottle   for   

first   time.   If   qualified,   examine   for   a   second   time   after   ten   minutes.   If   also   qualified,   the   

machine   can   be   in   auto   production   state.   

During   produce   program,   if   feeding   of   aseptic   water,   syrup,   co

2

   gas   etc   are   in   stable   

state,   examine   can   be   done   after   an   interval   of   some   time.   

If   examine   to   beverage   in   the   bottle   are   not   suitable   with   product,   do   some   related   

adjustment   according   with   detail   condition   until   product   is   qualified.   

   

   

Содержание IMCQHS Series

Страница 1: ...1 IMCQHS Series of Drink Mixer INTERNATIONAL MACHINE CONCEPTS WELCOMES YOU TO YOUR NEW MACHINE Operation Manual Date 2015 Version 1 Serial Number...

Страница 2: ...tallation 1 3 Electrical and Pneumatic connections 1 4 Chapter 2 Technical Parameters and Description 2 1 Chapter 3 Operation Instruction Main Construction 3 1 Production system instruction 3 2 Mechan...

Страница 3: ...f food sanitation law 1 2 Un crating Instructions During un crating make sure that no physical damage to the outside of the crate has taken place Carefully break open the exterior panels to reveal the...

Страница 4: ...chine should be placed on level ground After installing the machine check if the machine is level by Level Instrument If not please adjust the four legs Check every part of the machine carefully for d...

Страница 5: ...chilled water 0 4C0 Inlet pressure of chilled water 0 01Mpa 0 08Mpa Inlet temperature of syrup 2 8 C0 Inlet pressure of syrup 0 01Mpa 0 08Mpa Inlet pressure of CO2 0 7Mpa 0 8Mpa Purity of carbon dioxi...

Страница 6: ...e static mixer The corrugated plate in the static mixer increases the meet area and time When the beverage after desecrated enter into the inlet of the static mixer put the CO2 gas of 0 6Mpa into stat...

Страница 7: ...the syrup and water pipe to a large position See produce operation program to sterilize the order of sterilization is as below Syrup pot open or close related valves and discharge waste water Static m...

Страница 8: ...of carbonization flow meter to 2 5 3 5m3 h c Adjust productivity namely adjust the metering valve shows on LZB 40 flow meter d Adjust the ratio between syrup and water according with different need o...

Страница 9: ...now to discharge gas Or else turn off the machine and do a examination Production finished Before finishing production turn syrup pump work button to 0 position stop feed into syrup watch window openi...

Страница 10: ...g time the steeper in all filter pot pipeline carbonization machine pump should be discharge completely Then close related valves as well as do a cleaning to the surface of the machine Water is prohib...