background image

 

   

1   

      
   

IMCQHS   Series   of   Drink   Mixer      

   

INTERNATIONAL   MACHINE   CONCEPTS   WELCOMES   YOU   TO   YOUR   NEW   

MACHINE   

   
   

   
   

   

   
   
   
   
   
   
   
   
   
   
   
   
   

   
   
   

   

   
   

Operation   Manual:   Date   2015.   Version   1.   Serial   Number   

   

   

   

Содержание IMCQHS Series

Страница 1: ...1 IMCQHS Series of Drink Mixer INTERNATIONAL MACHINE CONCEPTS WELCOMES YOU TO YOUR NEW MACHINE Operation Manual Date 2015 Version 1 Serial Number...

Страница 2: ...tallation 1 3 Electrical and Pneumatic connections 1 4 Chapter 2 Technical Parameters and Description 2 1 Chapter 3 Operation Instruction Main Construction 3 1 Production system instruction 3 2 Mechan...

Страница 3: ...f food sanitation law 1 2 Un crating Instructions During un crating make sure that no physical damage to the outside of the crate has taken place Carefully break open the exterior panels to reveal the...

Страница 4: ...chine should be placed on level ground After installing the machine check if the machine is level by Level Instrument If not please adjust the four legs Check every part of the machine carefully for d...

Страница 5: ...chilled water 0 4C0 Inlet pressure of chilled water 0 01Mpa 0 08Mpa Inlet temperature of syrup 2 8 C0 Inlet pressure of syrup 0 01Mpa 0 08Mpa Inlet pressure of CO2 0 7Mpa 0 8Mpa Purity of carbon dioxi...

Страница 6: ...e static mixer The corrugated plate in the static mixer increases the meet area and time When the beverage after desecrated enter into the inlet of the static mixer put the CO2 gas of 0 6Mpa into stat...

Страница 7: ...the syrup and water pipe to a large position See produce operation program to sterilize the order of sterilization is as below Syrup pot open or close related valves and discharge waste water Static m...

Страница 8: ...of carbonization flow meter to 2 5 3 5m3 h c Adjust productivity namely adjust the metering valve shows on LZB 40 flow meter d Adjust the ratio between syrup and water according with different need o...

Страница 9: ...now to discharge gas Or else turn off the machine and do a examination Production finished Before finishing production turn syrup pump work button to 0 position stop feed into syrup watch window openi...

Страница 10: ...g time the steeper in all filter pot pipeline carbonization machine pump should be discharge completely Then close related valves as well as do a cleaning to the surface of the machine Water is prohib...

Отзывы: