15
Ц
13
5
\
\
11
4
Relief valve assembly drawing cross section
No.
Description
Q ’ty
1
Socket
1
2
Adjust pressure valve
1
3
Piston
1
4
Adjustm ent section
1
5
Main body
1
6
Adjustm ent valve
1
7
Adjustm ent spring
1
8
Nut
1
9
Adjustm ent valve spring
1
1 0
Adjust valve spring
1
1 1
O-ring
1
1 2
O-ring
1
13
O-ring
2
14
Backup ring
2
15
O-ring
1
Symbol
Overload relief valve setting pressure
MPa
OR1
Boom up
18.6+° 49 at 5 L/min
OR
2
Boom down
18.6+° 49 at 5 L/min
OR3
Arm pull-off
18.6+° 49 at 5 L/min
Pump
Main relief valve setting pressure
MPa
P1
MR1
16.2
+_°2
at 12.5 L/min
P2
MR2
1 6 . 2 9 at 12.5 L/min
p~
■
j
_
Notes on damages due to over-tightening
О
Piping adapter on P/T port marked *
Tightening torque: 69+ON • m
О
Other piping adapters
Tightening torque: 34-44N • m
Содержание 9VX3
Страница 1: ...Service Guide 9VX3 I H I SERIAL NUMBERS WB004001 up PUB No 1 1205...
Страница 21: ...Swing motor...
Страница 34: ...A 1 34 6 7 14 15 17 18 10 19 20 25 23 13 35 SECTION...
Страница 38: ...3 1 0 Disassembly drawing For part names and numbers refer to the parts catalog...
Страница 43: ...STRUCTURE AND FUNCTION 9VX3 RUBBER CRAWLER SHOE ASEMBLY Weight 31 kg Sec A A 37 Link Sec 2 1 9 1...
Страница 45: ...Boom Cylinder head details...
Страница 51: ...Boom Swing Tightening torque 176 N m M16 x 1 5 19 8 7 6 13 5 DETAIL P DETAIL H...
Страница 58: ...STRUCTURE AND FUNCTION 9VX3 BUCKET ASS Y Dimension of the ear plates Detail of ear plates 2 25 1...