background image

MAINTENANCE

9VX3

5.  Special  attention  must  be  given  to  the  hydraulic 

oil  during  very cold  weather.

f ! l  CAUTION |

BEFORE 

atten 

warm  up  the 

“After Starting  I

npting  any  wort 

hydraulic  oil  a 

the  Engine on  S

ting  operations, 

s  described  in 

Iheet  No.2-6”.

6

.  At  the  end  of  the  work  period,  or  whenever  the 

machine  is  to  be  left  idle  for  extended  periods, 

prevent  it  from  being  frozen  to  the  ground  by 

parking  it  on  wood,  concrete,  asphalt  or  mat 

surface.

■  Extreme Heat.

Like  extreme  cold,  extreme  heat  requires  that 

precautions  be  taken  with  respect  to  the  cooling 

system,  the  battery and  lubrication.

Protect  the  machine  by  performing  the  following 

recommended  procedures.

1.  High  temperatures  necessitate  the  use  of 

lubricants  which  are  both  more  viscous  and 

which  resist  deterioration  at  higher  operating 

temperatures.  Refer  to  the  Lubrication  Section 

and  lubricate  the  machine  using  the  lubricants 

recommended  for the  expected  temperatures. 

Crankcase  oil  is  particularly  important  because  it 

helps  dissipate  heat. 

Check  the  oil  level 

frequently  and  add  oil  as  required  to  maintain 

required  level.  Too  little  oil  will  hinder  heat 

dissipation.

2.  To  ensure  proper  coolant  circulation,  drain  and 

flush  the  cooling  system,  clean  any  foreign 

matter  from  the  radiator  cooling  fins  and 

through-core  air  passages,  replace  defective 

hoses,  tighten  hose  clamps,  tension  the  water 

pump  drive  belt  properly,  eliminate  any  leaks 

detected  and  fill  the  system  with  a  50%  solution 

of ethylene glycol.

A  corrosion  inhibitor is  recommended.

Engine  overheating  due  to  loss  of  coolant  will 

most  often  be  corrected  by 

SLOWLY 

adding 

coolant  while  the  engine  is  running  at 

FAST

 

IDLE. 

Should  this  fail  to  correct  the  problem, 

drain  and  flush  the  system  and  refill  with  fresh

coolant  (50%  solution  of  ethylene  glycol)  and  a 

corrosion  inhibitor.

Allow  the  engine  to  cool  before  draining  and 

flushing  the cooling  system.

W ater 

containing 

more 

than 

small 

concentrations  of  salt  or  minerals  should  not  be 

used  in  the  cooling  system.  Salt  facilitates 

corrosion  and  minerals  deposit  on  the  coolant 

passage walls.

Both  processes  inhibit  proper cooling.

3.  Increased  evaporation  rates  will  cause  the 

battery  electrolyte  level  to  fall  more  rapidly 

during  very  hot  weather.  Check  the  level 

frequently  and  add  distilled  water  as  required  to 

maintain  the  proper level.

4.  Air  circulation  around  the  engine  and  battery 

must  not  be  restricted.  Keep  air  intake  and 

exhaust openings  clear of  leaves,  paper or other 

foreign  matter,  which  may  restrict air flow.

5.  Keep  the  engine  clean  of  dirt.  Grease  and  other 

substances,  which  inhibit heat dissipation.

6

.  Operate  engine  at  full  throttle  when  digging  or 

tracking  machine.

Run  the  engine  only  when  engaged  in  work 

operations  or when  traveling  the  machine.  Avoid 

prolonged  periods  at  idle  and  shut  the  engine 

down  if operations are  interrupted.

■  Sandy or Dusty Work Sites

The  presence  of  large  amounts  of  sand  or  dust  at 

the 

work 

site 

can 

contribute  to 

accelerated 

component weather.  Either  substance  win  act  as  an 

abrasive  when  deposited  on  moving  parts  of  the 

machine.

This  problem  can  be  alleviated  by  increasing  the 

schedule  of  lubrication  and  by  servicing  breathers 

and  fillers  at  more  frequent  intervals.  Follow  the 

recommendations  below  when  operating  in  sand  or 

dust on  a  regular bases.

4 - 1 1 - 2

Содержание 9VX3

Страница 1: ...Service Guide 9VX3 I H I SERIAL NUMBERS WB004001 up PUB No 1 1205...

Страница 2: ...9VX3 HYDRAULIC MINI EXCAVATOR TABLE OF CONTENTS SECTION 1 SPECIFICATIONS SECTION 2 STRUCTURE AND FUNCTION SECTION 3 OPERATION SECTION 4 MAINTENANCE SECTION 6 PERFORMANCE STANDARDS...

Страница 3: ...ENTS Subject page General Specifications 1 1 1 Overall Dim ensions 1 2 1 Working Ranges 1 3 1 Weight Breakdown 1 4 1 Painting Diagram 1 5 1 Engine Main Date and Specifications 1 6 1 Lifting Capacities...

Страница 4: ...gine special eddy current type No of cyl bore x stroke mm 2 70 x 74 Total piston displacement L 0 569 Rated output kW min 1 7 3 2400 DIN6271 7 2 2400 Max torque N m min 1 34 8 1800 WEIGHT Machine mass...

Страница 5: ...et capacity Side cutter width mm Number of teeth Weight kg Combinations Remarks Use ISO m3 Std arm Long arm Heaped Struck 0 0 2 2 0 013 370 4 18 3 X Standard General digging 0 017 0 0 1 1 320 3 16 8 O...

Страница 6: ...verall width of crawler 700 950 D Width 720 E Height 1405 F Rear end swing radius 485 G Rear end ground clearance 405 H Mini ground clearance 160 I Overall length of undercarriage 1500 J Blade height...

Страница 7: ...SPECIFICATIONS 9VX3 WORKING RANGES OFFSET DIGGING WORKING RANGE g R950 Front end min radius at right boom swing 1 3 1...

Страница 8: ...1770 D Radius of max digging depth 1330 1340 E Max digging height 2755 2950 F Radius of max digging height 1740 1820 G Max dumping height 1970 2150 H Radius of max digging height 1590 1700 I Min dumpi...

Страница 9: ...achment Shoe Cabin Spec Weight kg Rubber shoe 890 Shoe Cabin Spec Weight kg Rubber shoe 785 This weight is not the mass of the machine body It includes the weight of water fuel blade and others Specif...

Страница 10: ...1 Do not coat rubber sponges catch metal fixtures hydraulic hoses cylinder rods rod packing air cleaners mufflers with paint 2 Do not coat operating lever side box gauges pedal handrail seat or under...

Страница 11: ...and cross Momentary 30 degrees longitudinal and cross Engine rotating direction Counterclockwise when viewed from the flywheel side Engine weight Dry 84 5 0 kg Fuel system Applicable fuel JIS K2204 N...

Страница 12: ...lic capacity or 75 stability m 9 9 6 6 3 3 ft s 0 a u o 3 3 6 6 13 2 352 ______ _ l_ lifting 1 Maxim tieight um lifting radius T v f 374 352 374 3 I 374 374 352 352 52 i 396 Iflla f I 1 374 396 4 396...

Страница 13: ...f hydraulic capacity or 75 stability ft 9 9 6 6 3 3 ft 0 o 3 3 6 6 13 2 242 X 286 Unit lbs Position of lifting height normal lifting Maximum lifting radius 352 198 220 220 176 352 I 4 4 330 396 198 22...

Страница 14: ...LABELS There are several specific safety signs i k on your machine Make sure that you can read all safety signs Clean or replace these if you cannot read the words Q 10 9 View D 1 Put into the pocket...

Страница 15: ...t not avoidable put s u ita b le block on the crawer shoes and down the blade to penetrate ground_ 40590300 j 2 Read m anual D405 359 00 Read manual before operation maintenance disassembly assembly...

Страница 16: ...or or hydraulic tank is uncapped while hot Allow radiator or hydraulic tank to cool before removing cap 11 Warming for track adjuster D405 505 00 Sign indicates an electrical hazard from handing the c...

Страница 17: ...Bearing 2 11 1 Swing Motor Ass y 2 12 1 Rotary Joint and Lower Piping Ass y 2 13 1 Travel Motor and Reduction Gear Ass y 2 14 1 Crawler Shoe Adjusting D evice 2 15 1 Front Idler Ass y 2 16 1 Lower Ro...

Страница 18: ...cylinder 27 Battery 4 Bucket Cylinder 16 Slide pad 28 Hydraulic Pump 5 Arm 17 Shoe adjusting device 29 Fuel Tank 6 Boom 18 Front Idler 30 Boom Swing Cylinder 7 Arm Cylinder 19 Blade Cylinder 31 Retur...

Страница 19: ...alve sheet 24 mm wide 9VX Engine Engine YANMAR 2TNV70 9VX Pump 2PF 4 64cc x 2 With involete spline shaft 9VX Control valve Circuit arrangement Same as 10Z2 10VZ 9VX 4 C D E Swing motor With shock lees...

Страница 20: ...y 8 2 L Total system volume 16 L Relief valve set pressure Suction strainer Main pump Code Item Pressure MPa MR1 Main relief valve P1 Pump 16 2 MR2 Main relief valve P2 Pump 16 2 OR1 Overload relief v...

Страница 21: ...Swing motor...

Страница 22: ...de a A4 yTravel R H F i 1 B3 A3 B2 A2 B1 A1 Boom swing Bucket Boom TO T aMwot Gauge port Blade lower Forward Swing left Dump Hoist P1 S u i i i i High speed travel shift i valvfi Relief valve set pres...

Страница 23: ...NTS Engine component names layout supply port Fuel return pipe Fuel suetion pipe Thermo sensor Engine stop solenoid A Fan Contro1lever level gauge pressure switch Water drain plug V Oil supply port G...

Страница 24: ...level gauge Disassembly drawing Maintenance AAIa aIo Intervals Every Hlours f Drnl A rl f Suction strainer w0 ni6 nis Cleaning Initial a Tier 1 0 0 0 DlaKS WOlKS 500 Return filter Replace 50 500 1 0...

Страница 25: ...g is empty and free from oil due to pump exchange etc be sure to supply clean hydraulic oil from the oil supply port before start up 2 Tighten hexagonal socket headed bolt 3 with the specified tighten...

Страница 26: ...ar 1 5 Side plate 4 6 Bushing 2 7 Bushing 2 2 0 Body 1 2 1 Drive Gear 1 2 2 Driven Gear 1 23 Bushing 2 24 Bushing 2 50 Gasket 4 51 Gasket 2 52 Socket head bolt 4 53 Treatment washer 4 55 Steel Ball 4...

Страница 27: ...O ring 1 1 2 O ring 1 13 O ring 2 14 Backup ring 2 15 O ring 1 Symbol Overload relief valve setting pressure MPa OR1 Boom up 18 6 49 at 5 L min OR2 Boom down 18 6 49 at 5 L min OR3 Arm pull off 18 6 4...

Страница 28: ...9VX3 CONTROL VALVE 1 Weight 10 5 kg MR2 Main relief valve OR1 Boom up Overload relief valve MR1 Main relief valve Upon assembling the valve block Observe the tightening torque 3 positions 13 7 14 7N m...

Страница 29: ...identification Pressure adjusting part assembly Attach seal tape 4 Hexagonal socket headed pipe plug 1 12 7 14 7N m 3 O ring 1 2 Plug 1 24 5 29 4N m 1 Pressure adjusting member 1 No Part name Q ty Tig...

Страница 30: ...1 24 5 29 4N m 9 O ring 1 P11 1 8 Check valve spring 1 7 Check valve 1 6 Cross socket headed small pan screw M5x10 1 96 2 94N m 5 O ring retainer 1 4 Backup ring 10A 1 3 O ring 1A P10A 1 g Valve rod...

Страница 31: ...2 d O ring retainer 1 Backup ring 1 b O ring 1A POA 1 a Valve rod bucket 1 I Valve rod assembly bucket 1 1 Switching part body ZF 1 No Part name Q ty Tightening torque 13 PF 1 4 plug 2 24 5 29 4N m 12...

Страница 32: ...ck Tite 242 14 PF 3 8 Plug 1 39 2 49 0N m 13 ring 1B P14 1 12 Hexagonal socket headed bolt M5x45 5 88 6 86N m 11 Return spring lid 1 10 Check valve support 1 24 5 29 4N m 9 O ring 1 P11 1 8 Check valv...

Страница 33: ...is designated in place Swinq frame Inner ring soft zone Creasing Port I Outer rinq soft zone Note Assemble the swing bearing soft zone and greasing port as shown above Treatment B o lt M10 x 30 Tighte...

Страница 34: ...A 1 34 6 7 14 15 17 18 10 19 20 25 23 13 35 SECTION...

Страница 35: ...ar 1 22 Plug 1 23 Bolt Socket Head 24 Key 1 25 Brake Housing 1 26 Bushing 1 27 Gear Wheel 1 28 Bearing Needle 1 29 Spring Coil 30 Plate Push 1 31 Plate Friction 1 32 Piston 1 33 Bolt Socket Head 34 Pl...

Страница 36: ...Pin ring Sipper seal Structure cross section Flange Hexagonal socket headed bolt Spring washer I Hexagonal socket Snap ring headed bolt Spring Steel ball ring Detent cover Note 1 Upon assembling the r...

Страница 37: ...STRUCTURE AND FUNCTION 9VX3 Rotary joint assembly ROTARY JOINT AND LOWER PIPING ASS Y weight 14 kg Left travel motor piping Right travel motor piping 2 1 3 1...

Страница 38: ...3 1 0 Disassembly drawing For part names and numbers refer to the parts catalog...

Страница 39: ...PI type class CD SAE30 Volume 0 33L PP Weight 17 kg External view Oil supply level Lubricant supply drain port Swing motor mounting bolt Tightening torque 55N m Coat Screw Lock 262 j Sprocket mounting...

Страница 40: ...e with install the desrice 2 Loosen the check valve one turn maximum and escap the internal grease when loosening the shoe Never loosen the grease fitting Do not watch the check valve to see if grease...

Страница 41: ...Install the plug after fill gear oil SAE 90 API GL4 20CC 2 Inspect oil leak Apply air press 98 kPa to oil gill hole after assembly Key Description Q t2y 1 Oil Seal 2 2 Snap Ring 2 3 Ball Bearing 2 4 F...

Страница 42: ...l gear oil SAE 90 API GL4 70CC 2 Inspect oil leak Apply air press 98 kPa to oil gill hole after assembly Lubricant type Q ty API GL4 SAE 90 70 cc Key Description Q ty 1 Treatment Bolt 2 2 Lock Washer...

Страница 43: ...STRUCTURE AND FUNCTION 9VX3 RUBBER CRAWLER SHOE ASEMBLY Weight 31 kg Sec A A 37 Link Sec 2 1 9 1...

Страница 44: ...FT VALVE ASS Y Key Description Q ty 1 Bolt 1 2 Spring 1 3 Spring Cover 1 4 Seal Retainer 2 5 Spring Holder 2 6 Pan Head Screw W L W 4 7 Spool 1 8 Body 1 9 0 Ring 1 1 0 Spool Head 1 11 Back up Ring 2 1...

Страница 45: ...Boom Cylinder head details...

Страница 46: ...g 1 7 Back up Ring 8 0 Ring 1 9 0 Ring 1 1 0 Back up Ring 1 11 U Ring 1 1 2 Back up Ring 13 Set Screw 1 14 Steel Ball 1 15 Cylinder Head 1 16 Bushing 1 17 Cushion Bearing 1 18 Spacer 1 19 Stopper 1 2...

Страница 47: ...Arm Tightening torque 9 8 N m M6 x 1 0 Locking 2 points with punch Tightening torque 147 N m M16 x 1 5 14 15 11 12 13 1 18 8 7 6 16 5 t DETAIL P DETAIL H...

Страница 48: ...g 1 4 Seal Kit 1 5 Wear Ring 1 6 0 Ring 1 7 Back up Ring 1 8 0 Ring 1 9 U Ring 1 1 0 Piston Ass y 1 11 Slide Ring 1 2 Seal Ring ass y 1 13 Piston 1 14 Steel Ball 1 15 Set Screw 1 16 Cylinder Head 1 17...

Страница 49: ...Bucket Tightening torque 6 8 N m Tightening torque 167 N m Calk at 2 positions M6 Tightening torque 255 N m M18 x 1 5 M55 x 2 0 13 14 10 11 10 12 17 7 6 5 15 1 Cylinder head details...

Страница 50: ...od Ass y 1 2 Bushing 1 3 seal kit 1 4 Dust Seat 1 5 0 Ring 1 6 Back up Ring 1 7 0 Ring 1 8 U Ring 1 9 Piston Ass y 1 1 0 Slide Ring 11 Seal Ring Ass y 1 1 2 Piston 1 13 Steel Ball 1 14 Set Screw 1 15...

Страница 51: ...Boom Swing Tightening torque 176 N m M16 x 1 5 19 8 7 6 13 5 DETAIL P DETAIL H...

Страница 52: ...y 1 2 Grease Nipple 1 3 Bushing 1 4 Seal Kit 1 5 Dust Seal 1 6 0 Ring 1 7 Back up Ring 1 8 0 Ring 1 9 Back up Ring 1 1 0 U Ring 1 11 U Ring 1 2 Back up Ring 13 0 Ring 1 14 Cylinder Head 1 15 Bushing 1...

Страница 53: ...Blade Tightening torque 9 8 N m M6 x 1 0 Tightening torque 397 N m Locking 2 points with punch M24 x 1 5 DETAIL P DETAIL H...

Страница 54: ...2 Grease Nipple 1 3 Bushing 1 4 Cylinder Head 1 5 Bushing 1 6 Piston Ass y 1 7 Slide Ring 8 Seal Ring Ass y 1 9 Piston 1 1 0 Set Screw 1 11 Steel Ball 1 1 2 Seal Kit 1 13 Wiper Ring 1 14 0 Ring 1 15...

Страница 55: ...Tightening torque 7 8N m Tightening torque 98 N m Tightening torque 226 N m M5 Calk at 2 positions M14 x 1 5 14 15 12 11 10 13 M45 x 2 0 18 6 5 4 16 3 1 Piston details Cylinder head details...

Страница 56: ...Kit 1 3 Dust Seal 1 4 0 Ring 1 5 Back up Ring 1 6 0 Ring 1 7 Back up Ring 1 8 U Ring 1 9 Piston Ass y 1 1 0 Wear Ring 1 11 Back up Ring 1 2 Seal 1 13 Piston 1 14 Steel Ball 1 15 Set Screw 1 16 Cylind...

Страница 57: ...2 0 Ring 0 2 19 Fitting 6 8 Bushing 2 7 Bushing 2 16 Bushing 8 15 Pin Wing 1 14 Pin Wing 1 13 Pin Wing 1 1 2 Pin Wing 1 11 Pin Wing 2 1 0 Pin Wing 2 9 Pin Wing 2 8 Cover 1 7 Link Arm L 1 6 Link Arm R...

Страница 58: ...STRUCTURE AND FUNCTION 9VX3 BUCKET ASS Y Dimension of the ear plates Detail of ear plates 2 25 1...

Страница 59: ...J C M N 0 p Q Dimensions mm 95 95 151 25 25 0 7 25 36 5 Key R S T u V W X Z Dimensions mm 157 150 700 177 5 95 2 0 95 30 HYDRAULIC SYSTEM when details are request see for SERVICE GUIDE 1 Type of pump...

Страница 60: ...CTURE AND FUNCTION 9VX3 ELECTRICAL WIRING LOCATIONS B a t t e r y T e r m i n a H a r n e s s g r o u n d B a t t e r y T e r m i n a Names and layout of electrical wiring and components are shown 2 2...

Страница 61: ...r cannot operate during engine operation under power generation D b p NC E o COM E a N O N X J O O C N A C h a r g e l a m p H o u r m e t e r r e l a y During an operation under power generation it i...

Страница 62: ...Starting the Engine 3 5 1 Break in Operation 3 5 1 Backhoe Operation 3 6 1 Operating the Special Attachments and Actuators 3 7 1 Traveling the Machine 3 8 1 Crawler extension retraction 3 9 1 Towing...

Страница 63: ...arning lamp 11 Engine throttle lever 3 Engine oil pressure warning lamp 12 Travel lever 4 Service hour meter 13 High speed select pedal 5 Light switch 14 Blade crawler operation lever 6 Engine start s...

Страница 64: ...idling state lower temperature and check a cooling system 3 Engine Oil Pressure Warning Lamp This warning lamp indicates that engine oil pressure has fallen If it lights during operation stop the engi...

Страница 65: ...rical system The key will return to the ON position when released from the START position START Turn the key to the START position to crank the engine Release the key as soon as the engine starts HEAT...

Страница 66: ...machine Set the operation lock lever to the UNLOCK position when starting work Operation lock lever LOCK UNLOCK The machine may move in an unexpected way and a serious accident may result if you touch...

Страница 67: ...ver The lever returns to the neutral position autom atically and operation stops Sim ultaneous operation Turn the lever diagonally to operate the arm and swing simultaneously WB C210110 10 Right opera...

Страница 68: ...vement with the blade in the front position If the blade is at the rear position the traveling directions are contrary to the lever operations Check if the blade is in the front or rear position befor...

Страница 69: ...e lower Crawler extend 15 Blade brawler select lever Change blade operation and crawler operation with this lever Blade operation Push down the lever Crawler operation Pull up the lever 1 0 I I Blade...

Страница 70: ...nts and the hydraulic components Inspect the operator s compartment for cleanliness Keep it clean Inspect any cracks in boom and arm pivot area and cylinder mounting brackets Repair if damaged Refer t...

Страница 71: ...set at the neutral position 4 Insert the key into the engine key switch 2 Turn it to the ON run position and make sure of the following The engine oil pressure warning lamp 3 and battery charge warni...

Страница 72: ...or for 15 seconds or more If the engine fails to start return the key to the OFF position wait for 30 seconds and try to start the engine again HEAT OFF Starting in Cold Seasons Preheat the engine wit...

Страница 73: ...nd Move all controls to HOLD Stop the engine on boost machine 4 Connect POSITIVE jumper cable red POSITIVE cable terminal of discharged battery Do not allow positive cable clamp to touch any metal oth...

Страница 74: ...position Operate the bucket control lever for 10 to 15 seconds and then return the control lever HOLD position to ten seconds 3 Move the engine throttle lever to maximum engine speed Run the engine fo...

Страница 75: ...ation direction Operation mode Pattern A Pattern Pattern F 1 Boom raise Boom raise Arm in 2 Boom lower Boom lower Arm out 3 Bucket dig Bucket dig Bucket dig 4 Bucket dump Bucket dump Bucket dump 5 Arm...

Страница 76: ...ration system of the m achine is stuck at the top of the lever stand on the operator s seat side Operation mode Operation mode plate Pattern AB AB select type f 03 _ _ D4077330 A 4 i r o f X A O A U 6...

Страница 77: ...he cover on the front of the lever stand and re assemble the reach rods 2 The operation system changing plate is stuck on the inside of the lever stand front cover 3 Lower the attachm ent onto the gro...

Страница 78: ...lever forward BOOM SWING OPERATION O pen the pedal cover to the unlock position before starting operation Step on the right or left position of the boom swing pedal to operate the boom Right boom swi...

Страница 79: ...ever to the right Swing left Turn the lever to the left Return the lever to the neutral position to stop swinging Left operation lever Right swing Left swing4 gall r WB C210350 WARNING Do not let any...

Страница 80: ...USED FOR BREAKER AND OTHERS 1 Install the hydraulic hoses supply hose to A port and return hose to B port 2 Open the pedal into unlocked position Hose connection for the single action 3 Push down the...

Страница 81: ...INGLE ACTION OPERATION USED FOR POWER PORT WORKS B port t o d y A port 8 4 HU Hose connection for double action Pedal A port actuated port actuated Locked f Unlocked Pedal Pedal stopper 1 Install the...

Страница 82: ...lever to unlock it 3 Raise the bucket and blade to certain height that allow smooth traveling without hitting them 4 Operate the right and left travel levers as shown below Forward Push both travel le...

Страница 83: ...ever 1 to turn the machine forward Pull it back to turn the machine backward Forward turning to left turning to right Pivot turn to left WB C210410 2 Pivot turn to the right Use the left travel lever...

Страница 84: ...ill Work up and down slopes rather then sideways whenever possible Do not travel across a grade by all means Avoid changing the direction of travel on a slope which could result in tipping or side sli...

Страница 85: ...backward Extend NOTICE Be sure to extend or retract the crawlers on a flat place with no obstacles The crawlers may be extended or retracted without jacking up the machine body However if there are ob...

Страница 86: ...nt could overload the tow line or bar and cause it to break Gradual and smooth machine movement will work better Keep the tow line angle to a minimum Do not exceed a 30 angle from the straight ahead p...

Страница 87: ...Lifting Procedures 1 Start the engine and swing the machine to position the blade to front 2 Position the machine on the level ground with the boom arm and bucket cylinders fully extended 3 Position...

Страница 88: ...ine so that it can be run 1 Align the upper structure with the truck straight on the loading ramps Never operate 2 Move the control shut off lever to the LOCKED 4 MACHINE LOADING ONTO A TRUCK SECURING...

Страница 89: ...t the sprocket and iron core extremely Excessive tension increases travel resistance which prevents proper travel force and speed It also causes damages and extreme wear at undercarriage as well as ov...

Страница 90: ...freezing temperature are expected each crawler frame should be cleaned of mud and dirt and the machine parked on wood planks Engine Stopping 1 Operate the engine at LOW IDLE for five minutes This give...

Страница 91: ...n Required Maintenance and Checks 4 4 1 Daily Maintenance and Checks 4 5 1 50 hours Maintenance and Checks 4 6 1 250 hours Maintenance and Checks 4 7 1 500 hours Maintenance and Checks 4 8 1 1000 hour...

Страница 92: ...il and Filter 4 7 1 Hydraulic System Change Return Filter 4 8 2 Every 250 Service Hours First perform previous service hour items Engine Oil Change Oil and Filter 4 7 1 Air Cleaner Clean or Change Fil...

Страница 93: ...cate G 2 Fuel Tank Water sediment drain Hydraulic oil H 3 Hydraulic oil Tank Water sediment drain Suction strainer cleaning 4 Return filter Cartridge Engine oil E REngine Fuel filter v J Oil filter Ra...

Страница 94: ...draulic Fluid ISO VG46 Ambient Temperature Below 5 C Wear Proof Hydraulic Fluid ISO VG32 Track Rollers 0 05 liter Each Upon occasion API GL 4 ISO VG320 SAE90 Gear Oil Front Idlers 0 02 liter Each Upon...

Страница 95: ...proximately 1 0 to 2 0 mm slack with rubber shoes Suported the machine Track Tightening 1 Add grease through check valve fitting until the correct track tension is reached 2 Move the tracks forward an...

Страница 96: ...rubber or damage replace it with brand new one Repair is necessary when a crack is over 30 mm length or over 8 mm depth Replacement is Lug recommended when lug is 5 mm or less high Covering rubber Br...

Страница 97: ...off the fuse cover 3 Replace the blown fuse with a new fuse of the same capacity Fuse capacity Circuit name 1 5 A Warning lamps three hour meter 2 5 A Fuel pump 3 10 A Boom light horn 4 20 A Engine s...

Страница 98: ...e recharged as soon as possible If battery is out of use for a long time it must not be allowed to run down completely The battery should be given a small recharge sufficient to bring it back to fully...

Страница 99: ...to the bucket boss 3 Remove the pins of section A and B then remove the arm and the bucket Install the Bucket 1 Clean the removed pins and pin holes and apply coat the grease to them surface 2 Place a...

Страница 100: ...level gauge Add oil if necessary 4 Remove the oil fill plug and add oil Clean and install the oil fill plug 5 Close the access door Check the Coolant Level AWARNING Steam generated by hot fluid under...

Страница 101: ...owly loosen the fill plug to relieve pressure and remove it to add oil if necessary 4 Clean and install the fill plug To pressurize the hydraulic tank refer to Change Hydraulic Oil section Bucket posi...

Страница 102: ...of drained fluids as established by local regulations 5 Clean the inside surfaces of the body and bowl 6 Clean the filter 7 Inspect the ring on bowl replace them if they are worn or damaged 8 Install...

Страница 103: ...amage or excessive wear Repair if damaged Inspect and remove any trash build up in the engine compartment Inspect the cooling system for leaks faulty hose and trashbuiltup Correct any leaks and remove...

Страница 104: ...egulations 4 Close the drain valve Lubrication Perform the 50 hours lubrication as required by the Lubrication Chart Be sure to lubricate all cylinder mounting bushings and pins The following maintena...

Страница 105: ...y the filter wrench Use a filter wrench with the type shown at right Clean the filter housing base 5 Apply a light coat of engine oil to the gasket of the new filter 6 Install the new filter by hand W...

Страница 106: ...ve grasses Housing 1 Stop the engine 2 Release the two latches and remove the service cover 3 Remove the element from the air cleaner housing NOTE Remove the seal unit of element gently The element is...

Страница 107: ...ause leak If the striped dust is seen on the seal surface it is a symptom of dust leak If such dust seen inspect if there are foreign substances on the inside and outside of the housing seal tube 7 In...

Страница 108: ...e container NOTE Always dispose of drained fluids as established by local regulations 6 Clean the inside surface of the cup and theelement 7 Install the clean element 8 Install cup Tighten ring nut 9...

Страница 109: ...n cause personal injury Stop the engine and remove the start switch key Inspect Stop the engine Inspect the belt for wear and cracking To check the belt tension push the belt inward by hand apply 98N...

Страница 110: ...ch Size metrie Thread Size Tightening Torque N m Travel drive Bar 8 M10 54 Sprocket Bar 8 M10 54 Lower roller 19 M12 97 Swing bearing 17 M10 59 Swing motor Bar 10 M12 97 Swing gear case 17 M10 P1 25 5...

Страница 111: ...e filter base Fill plug Return filter Fillter base JSGasket J Cartridge NOTE This is a cartridge type element It cannot be reused 5 Coat the gasket of new finer with clean hydraulic oil 6 Install the...

Страница 112: ...ring nut 4 Remove the cup and the element 5 Drain water and sediment into a suitable container NOTE Always dispose of drained fluids as established by local regulations 6 Clean the inside surface of...

Страница 113: ...lder 6 Install a new filter element Install and secure the dust pan with arrow point upward 7 Reset the dust indicator by pushing in the reset button f l CAUTION Service the air cleaner only with the...

Страница 114: ...4 Install drain plug 5 Fill the travel drive to bottom of level plug opening Recommended oil Refill capacities Engine oil API CD SAE30 0 33 Liter 6 Install oil level fill plug 7 Perform procedure on...

Страница 115: ...d as shown Stop j the engine I Fill plug 2 Relieve the internal pressure from the hydraulic tank by loosening the fill plug 3 Clean area thoroughly to keep dirt out of strainer cover unit and fill plu...

Страница 116: ...between FULL and ADD marks on the level gauge 15 Pressurize the hydraulic tank Raise the boom with the arm boom and bucket cylinder fully extended 16 Remove the fill plug and then install fill plug a...

Страница 117: ...ssure and remove the cap 3 Open the radiator drain plug and allow the coolant to drain into a container 4 Remove the radiator drain plug allow the coolant to drain into a container Drain plug is locat...

Страница 118: ...maintain the machine free from coolant exchange for 2 years through summer and winter seasons The Long Life Coolant is therefore recommended for use with this machine when exchanging its coolant Mixi...

Страница 119: ...the fuel supply drain the tank and refill it with uncontaminated fuel 3 Lubricate the machine with the lubricants recommended for cold weather operation in the Lubrication Section If necessary change...

Страница 120: ...olant will most often be corrected by SLOWLY adding coolant while the engine is running at FAST IDLE Should this fail to correct the problem drain and flush the system and refill with fresh coolant 50...

Страница 121: ...eteriorating effects of salt moisture or both To protect exposed metallic surfaces wiring paint and other items keep them dry and well lubricated where salt or high humidity are encountered Follow the...

Страница 122: ...he battery after move the negative terminal and covering it or dismounting the battery from the machine Lock the control levers and pedals with the lock lever and pedal lock Bucket position at the tim...

Страница 123: ...ng Service P1 MR1 C O C l 1 CM CO Rated Engine RPM Arm Swing Travel LH Service P2 MR2 0 3 16 2 0 2 Rated Engine RPM Overload Boom Hoist Install Gauge Adapter in Att Line OR1 00 CD Refer to Pressure Me...

Страница 124: ...ove the cover and install the pressure gauge to measure port on the control valve Install the fill plug 2 Measure the MR1 Main relief valve Operation for Boom Bucket Travel R H and Service 1 Start the...

Страница 125: ...ng screw with a hexagon bar spanner while measuring the pressure Adjusting screw turn to clockwise to raise the pressure Adjusting screw 1 turn approx 9 8 MPa change pressure 4 Install and tighten the...

Страница 126: ...IN line 1 Start the engine move the bucket contact to the hard wall Fig 4 2 Move the engine throttle lever to low idle Pull the travel levers fully stroke to hold it and measure the pressure while tra...

Страница 127: ...nge pressure 4 Install and tighten the lock nut 5 After locking measure the pressure again 6 Lower the bucket to the ground Stop the engine Remove the fill plug on the hydraulic tank 7 Remove the pres...

Страница 128: ...move the fill plug on the hydraulic tank 5 Remove the pressure gauge Apply pipe sealant to the plug Install the fill plug on the hydraulic tank This swing relief valve not equipped pressure adjusting...

Страница 129: ...ssure 6 2 1 Lever Operating Force 6 2 1 Spool Stroke Control Valve 6 2 1 Swing Operating Speed Natural Drift 6 2 2 Travel Travel Speed Travel Alignment Drift Time for Crawler Belt 6 2 3 Boom Cylinder...

Страница 130: ...m straight 4 Safety measures such as Keep Off should be in place for the measurement using ropes to mark Keep O ff The meeting regarding work procedures and signs should be held in advance with other...

Страница 131: ...pressure oil temperature ground for measurement bucket load 2 Performance has been greatly degraded In that case the performance will have been degraded because of the maintenance conditions work type...

Страница 132: ...At hydraulic temperature 50 5 C Arm t t Bucket t t Swing 6 9 Travel I C M CD Boom Swing t t Blade t t LEVER FORCE Boom kg 1 3 0 5 At engine stopped Arm 1 3 0 5 Bucket 1 3 0 5 Swing 1 3 0 5 Travel 2 0...

Страница 133: ...oad Measure floating angle after stop the machine Swing Operating Speed Engine Rated r p m Oil temp 50 5 C Fully retracted bucket cylinder and arm cylinder Arm point pin positioned to be horizontal wi...

Страница 134: ...Low Speed below 23 2 sec Travel Alignment Engine Rated r p m Oil temp 50 5 C Measure turning distance x after 10 m travel Below 700 mm Below 1000 mm Natural Drift Engine Low idling Oil temp 50 5 C Me...

Страница 135: ...py Hoist 2 7 sec 0 5 sec Lower 2 3 sec 0 5 sec Below 3 5 sec Below 3 1 sec ARM CYLINDER SPEED Engine Rated r p i Oil temp 50 5 C Divided Measure time for fi retraction of cylinde cusion stroke 71 r 1E...

Страница 136: ...tention or retraction of cylinder Without measure cusion stroke Left 4 6 sec 0 5 sec Right 4 7 sec 0 5 sec Below 6 0 sec Below 6 0 sec CYLINDER DRIFT Engine Stopped Oil temp 50 5 C Bucket load Non loa...

Отзывы: