-5-
www.igmtools.com
Operating instructions EN
5. TRANSPORT, UNPACKING AND ASSEMBLY
5.1 Transport and unpacking
The machine is not assembled due to transport.
Remove the feeder from the packaging and place
on a flat surface. Check for any apparent transport
damages, these could damage the machine or your
health.
5.2 Assembly
We recommend to greasing the metal parts before
assembly.
5.3 Tool Required
- Power drill, 10.2mm Drill, M12 Tapping (Tapper) Tool
kits.
- Open-end wrench 13“, 14“, 17“, 19MM
- Allen Key 4MM
- M12 x 50MM Long Screw and 4 sets of M12 Spring
washers attached with packages.
5.4 Installation Steps
NOTE: Ensure there is sufficient weight support to
prevent power feeder tilted while Swing aside.
1. Confirmation of Power Feeder stand base
mounting position:
For small machine table, an extension bracket (no
provided) is recommended.
2. Locate boring position
For your boring convenience and accuracy, a SCALE
1:1 SELF-ADHESIVE DRILLING TEMPLATE is provided
and enclosed in the package.
Clean location free from oil. Tape SELF-ADHESIVE
DRILLING TEMPLATE to desire position. Mark it
with centre punch; Avoid table rib and support
underneath the table.
Prepare 4 sets of M12 bolts & spring washers (not
provided).
5.5 Assembling
NOTE:
Get help! Feeder is heavy. Do not try to do it
on your own.
Fasten base to table attached with 4 sets of M12
screws, spring washer.
Insert “STAND” to BASE. Assemble Handle.