21
UK
7.3 Examples of switch point settings
S2
rpm
1
50
100
10
PP
Hz
5
9
6
10
500
0,5 1
S3
9
6
3
3
P/0
P/0
S1
S2
rpm
1
50
100
10
PP
Hz
5
9
6
10
500
0,5 1
S3
9
6
3
3
P/0
P/0
S1
S2
9
6
S3
9
6
3
3
P/0
9
6
3
P/0
P/0
S1
S2
9
6
S3
9
6
3
3
P/0
9
6
3
P/0
P/0
S1
DD110S: 520 Hz | 6700 rpm
DD111S: 52�0 Hz | 67�8 Hz
DD110S:
The unit rpm is only applicable when 1 cam/revolution is present�
For several cams: Multiply the required switch point by the number of
cams�
Example Required switch point:
Number of cams:
Setting value:
1000 rpm
4
4 x 1000 rpm = 4000 rpm
7.4 Checklist after installation and set-up
Directly after power on, the device carries out an initialisation comprising a
complete self-test�
To ensure reliable operation of the device the following checks have to be
performed on start-up and then at least once a year:
1� Verify that all cables are correctly connected and the terminal blocks well
screwed�
2� Verify that all LEDs (indicators) light correctly�
3� Verify the positioning of all connected sensors�
4� Verify the correct fixing of the device to the DIN rail�
5� Verify that all external indicators work correctly�
6� Verify that the switches work correctly�