31
GB
Fig.12
Fig.13
1
I- ON
Fig.14
2
I- ON
0- OFF
2.7 ELECTRIC CONNECTION
Operation performed by Electrician (in compliance
with Standards in the country where the products
are installed) (Fig. 12).
Make the electric connection following the plant
layout.
2.8 COUNTER MASTER SWITCH (Fig. 14, pos. 2)
At “I” “ON” the current is connected (voltage reaches
the counter).
At “0” “OFF” the product is off BUT IS ALWAYS LIVE.
ATTENTION!
The master switch must be installed by
the Electrician in compliance with the
Standards in force.
Содержание START UP Series
Страница 20: ...20 6 MESSA FUORI SERVIZIO nell ambiente ma rivolgersi alle agenzie di recupero materiali metallici e vetri...
Страница 92: ...92 6 PUESTA EN FUERA DE SERVICIO sino dir jase a las agencias de recuperaci n de materiales met licos y vidrios...
Страница 94: ......
Страница 95: ...IFI S p A Strada Selva Grossa 28 30 61010 TAVULLIA Pesaro Italy Tel 39 0721 20021 Fax 39 0721 201773...