8
Installation
WIRING DIAGRAM
1
GND
) From PSU
2.
12v
)Ground to earth
3.
+5V
)
4.
Blue LED
)
5.
Heater (12V) )
6.
Granted LED ) Cable from
7.
Denied LED ) ievo
8.
Buzzer
) reader
9.
Trigger Input )
10.
GND
)
11.
Data / D0
) Cable to
12.
Clock / D1
) Controller
13.
GND
) See weigand
14.
GND
)
15.
D1
) Cable from
16.
D0
) ievo
17.
+5V
) reader
18.
Network
) Cable to PC
Cat 5
ievo BOARD
USB
Buzzer / LED /
Button / Heat
system
Wiegand
Output
Power
1
2
3
4
5
6
7
8
9 10
11 12 13
14 15 16 17
18
1
2
3
4
5
6
7
8
9 10
11 12 13
14 15 16 17
18
Network
connection
If you are experiencing connection problems please ensure cables are sitting in the
connectors correctly. When doing this ensure you use the correct size flat head
screwdriver.
Warning:
When installing the iEvo control box, follow ESD Safety Procedures.
Ground yourself to prevent damage to the any electronic component.
Содержание ultimate
Страница 1: ......
Страница 5: ...Installation 4...