6 - USE AND OPERATION
BOSS 332/545/551 E-volution
GB
6 - Pag. 11 / 19
6.5
FEEDER SET-UP AND AUTOMATIC CYCLE START
The following list is a sequence of feeder set-up and automatic cycle start operations required if
the feeder has to be started up for the first time.
• Perform the software parametering (refer to the "Push-button panel instruction manual")
• Carry out feeder set-up according to the bar to be machined (paragraph 5.3.)
• Prepare the bars to be machined (paragraph 6.4.).
• Feed bars to the magazine (paragraph 6.5.1).
• Adjust lube oil flow (paragraph 6.5.2).
• Start the automatic cycle (paragraph 6.5.3).
Содержание BOSS 332-545-551 E
Страница 4: ......
Страница 138: ...10 LIST OF AFTER SALES CENTERS GB 10 Pag 1 3 INDEX 10 1 LIST OF AFTER SALES CENTERS 2 ...