Print More Materials, All For Application
15
4.2 How to Calibrate
Step 1
1.
After completing the basic
leveling in step 4.1
2.
You need to click Leveling
Step 2
1.
Click on the arrow
Step 3
1.
The system automatically moves
to the last point.
2.
After stopping the movement
3.
Use the stopper to adjust the
distance between the platform
and the nozzle to 0.1mm by
rotating the butterfly nut at the
bottom of the platform.
Step 4
1.
Click on the arrow
Step 5
1.
The system automatically
moves to the next point
2.
Refer to "Step 3" for operation
Step 6
1.
Click the arrow to complete the
leveling of the remaining 3 points
in turn.
(When the first leveling
distance is too large, it is
recommended to perform
second leveling operations)