3. Installation
3.1 Opening and inspecting packing crates
Note:
Prevent the crate cover from warping when placed
at an angle. Place the packing crate level.
Note:
•
Only complete the installation when all parts are present and undamaged.
•
Inform IECHO customer service if any parts are missing or damaged.
•
Replenish or replace missing or damaged parts.
A
Remove all screws on the upper side of the packing crate.
B
Remove all the fixed support (1).
C
Lifting all the machine feet (2), and then push machine down slowly from packing crate.
Содержание PK-0604
Страница 1: ...1 PK User s Manual Hangzhou IECHO Science Technology Co LTD ...
Страница 4: ...4 1 1 PK Direction Information 1 front 4 right 2 back X X axis 3 left Y Y axis ...
Страница 13: ...13 3 5 3 Connect the PC or laptop to the cutter ...
Страница 14: ...14 4 Safety device on the machine and main switches 1 Main switch 3 Emergency stop switch 2 Pause switch 1 2 3 ...
Страница 21: ...21 7 Circuit board and motor driver 1 X driver 4 EPOS board 2 Y driver 5 DSP board 3 Z driver ...
Страница 24: ...24 Clean both side of X Y rail and EOT transmission Add lubricating oil to feeding system ...