6
2. Preconditions
2.1 Installation location
Make sure that the following requirements are met:
•
The installation location is level and can withstand the floor loads.
•
The shipping crates can be deposited close to the installation location and their presence
does not prevent the machine from being assembled.
•
The aisle width from the unloading location to the installation location is at least
larger than the dimensions of the packing crates.
•
The electrical and air connections meet the requirements listed in the technical data.
•
The installation location is well-lit.
•
At least 1 meter of space is available all around the cutting system for service and daily operation.
2.2 Personnel
Make sure that the following requirements are met:
•
The support personnel wear safety clothing and work gloves.
•
The support personnel are familiar with the hazards associated during machine
installation and have read and understood the mounting instructions.
2.3 Environmental conditions
2.4 Basic device compressed air
Value
Unit
Operating temperature
+ 10 to + 35
°C
Storage temperature
- 20 to + 55
°C
Relative humidity
10 - 80,
non- condensing
%
Conveyor feeding clamps
Value
Units
Operating pressure
0.6
MPA
Min. air flow
0.4
m³/min
Содержание PK-0604
Страница 1: ...1 PK User s Manual Hangzhou IECHO Science Technology Co LTD ...
Страница 4: ...4 1 1 PK Direction Information 1 front 4 right 2 back X X axis 3 left Y Y axis ...
Страница 13: ...13 3 5 3 Connect the PC or laptop to the cutter ...
Страница 14: ...14 4 Safety device on the machine and main switches 1 Main switch 3 Emergency stop switch 2 Pause switch 1 2 3 ...
Страница 21: ...21 7 Circuit board and motor driver 1 X driver 4 EPOS board 2 Y driver 5 DSP board 3 Z driver ...
Страница 24: ...24 Clean both side of X Y rail and EOT transmission Add lubricating oil to feeding system ...