Fan Coils
INSTALLATION, OPERATION, & MAINTENANCE MANUAL
3
SECTION ONE — Receipt & Initial Installation
4
Preface
4
Unpacking and Inspection
5
Handling and Installation
5
Installation Instruction for Ceiling
Hung Units
6
Cooling/Heating Medium
Connections
7
Horizontal Unit Drain Pan Removal
7
Valve Package Installation
and Maintenance
8
Ductwork Connections
8
Electrical Connections
9
Exposed Unit Touch Up and
Repainting
SECTION TWO — Start Up
9
General
10
Cooling/Heating System
10
Air System Balancing
10
Eco-telligent
®
Motor
11
Water Treatment
12
Water System Balancing
12
Controls Operation
SECTION THREE — Normal Operation &
Periodic Maintenance
12
General
13
Motor/Blower Assembly
13
Coil
13
Electric Resistance Heater Assembly
Table of Contents
13
Electrical Wiring and Controls
14
Valves and Piping
14
Filters, Throwaway
14
Filters, Permanent
14
Drain
14-15
Replacement Parts
SECTION FOUR — Equipment Start-up
16
Check List - IMPORTANT
17
Appendix A
–
Adjustment of
ICM AW4105
18
Appendix B
–
Adjustment of
EVO/ECM-4SPD
19
Terms and Conditions