![IDT EB-LOGAN-23 Скачать руководство пользователя страница 13](http://html1.mh-extra.com/html/idt/eb-logan-23/eb-logan-23_manual_3810139013.webp)
Notes
89EB-LOGAN-23 Evaluation Board
2 - 1
February 16, 2011
®
Chapter 2
Installation of the EB-LOGAN-23
Evaluation Board
EB-LOGAN-23 Installation
This chapter discusses the steps required to configure and install the EB-LOGAN-23 evaluation board.
All available DIP switches and jumper configurations are explained in detail.
The primary installation steps are:
1. Configure jumper/switch options suitable for the evaluation or application requirements.
2. Connect PCI Express endpoint cards to the downstream port PCIe slots on the daughter cards
plugged into the evaluation board. Daughter cards are provided by IDT. In some cases the 12-PACK
board will be required as well (specifically when more ports than those supported by the main board
are required).
3. Make sure that the host system (e.g. server with root complex chipset) is powered off.
4. Connect the evaluation board to the host system via the adapter card and cable provided by IDT.
5. Apply power to the host system and to the IDT board.
The EB-LOGAN-23 board is typically shipped with all jumpers and switches configured to their default
settings which will satisfy the initial needs of the majority of the users. In most cases, the board does not
require further modification or setup. However, please visit the IDT website and fill out the Technical
Support Request form at
http://www.idt.com/?app=TechSupport
PCI Express Mezzanine and Edge Adapters
The PCI Express lanes are broken out to four Mezzanine connectors on the EB-LOGAN-23 Evaluation
Board. The adapter cards are used to convert Mezzanine connectors into PCI Express slot connector(s) or
Internal mini SAS (iSAS) connectors or both. A Bifurcated Mezzanine Card has two mechanical x8 PCIe
Slots (x4 electrically) while a Merged Mezzanine Card has single x8 PCIe Slot. Pictured in Figure 2.1.
Figure 2.1 Bifurcated and Merged Mezzanine Cards
Содержание EB-LOGAN-23
Страница 4: ...IDT Table of Contents EB LOGAN 23 Evaluation Board ii February 16 2011 Notes ...
Страница 6: ...IDT List of Figures EB LOGAN 23 Evaluation Board iv February 16 2011 Notes ...
Страница 8: ...IDT List of Tables VB64H16AG2 Validation Board Manual vi February 16 2011 Notes ...
Страница 12: ...IDT Description of the EB LOGAN 23 Evaluation Board 89EB LOGAN 23 Evaluation Board 1 4 February 16 2011 Notes ...
Страница 40: ...IDT Software For EB LOGAN 23 89EB LOGAN 23 Evaluation Board 3 2 February 16 2011 Notes ...
Страница 41: ...Notes EB LOGAN 23 Evaluation Board 4 1 February 16 2011 Chapter 4 Schematics Schematics ...