36
6 - ASSEMBLY AND INSTALLATION
GB
5
6
7
6.
INSERT THE CENTERING PINS IN THE
TWO SEMI-TABLES.
7.
JOIN THE TWO SEMI-TABLES POSITIONED
ABOVE THE BRACKETS ATTACHED TO THE
RATTAN TOWER.
8.
FIX SEMI-TABLES TIGHTENING THE HEX
SOCKET BUTTON HEAD CAP SCREWS M6X15
9.
SCREW IN NOZZLES
THE INSTALLER MUST SECURELY TO THE FLOOR GROUND THE MACHINE WITH AT LEAST 3 SCREWS OF THE INSTALLER TO
CHOOSE THE METHOD SO AS NOT TO COMPROMIZE THE STABILITY OF STRUCTURE AND COMPONENTS IN IT.
Cop
yright ©2017 Idr
obase Gr
oup
. All rights r
eserv
ed.
Содержание AURORA
Страница 21: ...43 11 ELECTRICAL DIAGRAM GB Copyright 2017 Idrobase Group All rights reserved...
Страница 23: ...45 NOTE GB Copyright 2017 Idrobase Group All rights reserved...
Страница 24: ...46 NOTE GB Copyright 2017 Idrobase Group All rights reserved...
Страница 25: ...47 NOTE GB Copyright 2017 Idrobase Group All rights reserved...