38 operaTing Tips (Ts8000 & Ts8001)
flushing and filling
For safety reasons, you should only fill the collectors when there is no direct irradiation from the sun (or cover thecollectors).
Especially in regions exposed to frost, for flat plate collectors you should use a mixture of (FS) antifreeze with water (40%
antifreeze). The solar thermal system should be filled and commissioned within one week of installation, because heat build-
up in the collector (array) can damage the flat gaskets in empty systems. If this is not possible, the flat gaskets should be
replaced before commissioning to prevent leakage.
Attention
: Antifreeze that is not pre-mixed must be mixed with water prior to filling!
Recommended antifreeze for flat plate collectors: TYFOCOR-L
40% proportion of antifreeze (60%/water) - freezing point: -22° C/solidification point: -26° C
50% proportion of antifreeze (50%/water) - freezing point: -32° C/solidification point: -44° C
It may not be possible to completely empty collectors once they have been filled. For this reason, collectors exposed to frost
should only be filled with a water/antifreeze mixture, also for pressure and function tests. Alternatively, the pressure test can
also be carried out using compressed air and leak detection spray.
installing the Temperature sensor
The temperature sensor should be installed in the sensor sleeve nearest to the collector array flow. To ensure optimal contact
between the sensor and the surrounding environment, the gap between the sensor sleeve and the sensor element should be
filled with a suitable conducting compound. All materials used for installing temperature sensors (sensor element, conducting
compound, cables, sealing and insulating materials) must be suitably temperature resistant (up to 250° C).
operating pressure
The maximum operating pressure is 10 bar.
bleeding
The system must be bled:
- when commissioning the system (after filling the collectors)
- 4 weeks after commissioning
- when necessary, e.g. if there are malfunctions
Warning
: Risk of scalding due to steam and hot heat transfer fluid!
Only operate the bleeding valve if the temperature of the heat transfer fluid is
< 60° c
.
When bleeding the system, the collectors must not be hot! Cover the collectors and, if possible, bleed the system in the
morning.
check Heat Transfer fluid
The heat transfer fluid must be checked every two years with regard to its antifreeze and pH value.
- Check antifreeze using antifreeze tester and replace or refill if necessary!
Target value is ca. - 25° C and - 30° C depending on climatic conditions.
- Check pH value with a pH indicator rod (target value approx. pH 7.5):
If the limit pH value is less than ≤ pH 7, replace the heat transfer fluid.
maintenance of the collector
The collector or the collector array must be inspected visually, once a year, for any damage, leaks and contamination.
Additional recommendations on operation and maintenance can be found in the supplier’s general documentation and
instructions on commissioning and maintenance.
207786-2.indd 43
16/02/2012 11:26:21
Содержание Solar Thermal
Страница 59: ...59 Solar Thermal Installation and Servicing ...
Страница 62: ...62 Notes Solar Thermal Installation and Servicing ...
Страница 63: ...63 Notes Solar Thermal Installation and Servicing ...