INCOMING COLD SUPPLY

M

DC

DC

DC

TO
EXTERNAL
TAP

SINK

WATER SOFTENER (IF NECESSARY)

WM or DWM

WHB

W.C.

DC

DC

SH

DHW

WHB

WC

BATH

SCV

SCV

P&T

ERV/NRV

PRV

DCV

Note:  
Cold supplies to single taps must be 

taken from the mains cold water 

system.
Cold supplies to mixer taps must be 

taken from the balanced cold water 

connection on the combination 

valve.

General Restrictions

a.  The highest hot or cold water draw off point should not exceed 10 metres above 

the Pressure Reducing Valve.

b.   An ascending spray type bidet or any other appliance with a Class 1 back-syphonage 

risk requiring a type A air gap should not be used.  

c.   Ideal Pro should not be used where steam is the primary heating medium, or in a 

situation where maintenance is likely to be neglected.

d.  Unvented cylinders are not suitable  for use with solid fuel boilers.

e. 

If the supply to the mixer fittings (other than a dual outlet type) is not taken from 

the balanced supply the system will become over pressurized and cause the 

pressure relief valve to discharge.  Over time this could also cause the premature 

failure of the appliance itself which will not be covered by the warranty.

f.   In larger properties with a number of bathrooms/en-suites and long pipe runs 

we would recommend that the balance cold supply is provided with its own 

pressure reducing valve and is not taken from the balanced cold connection on 

the combination valve.  In this case it will also be necessary to fit a small expansion 

vessel on the balanced cold water system to accommodate the pressure rise caused 

by the increase in temperature of the balanced cold water.

g.   Check the performance requirements of the terminal fittings with regard to flow/

pressure are suitable.

h.  In relation to potable water systems, expansion vessels shall be installed in a vertical 

orientation and located so that the length of the connecting pipe work is kept to 

a minimum.

Shower Fittings

Aerated taps are recommended to prevent splashing. Any type of shower mixing valve 

can be used as long as both the hot and cold supplies are mains fed.  However, all mains 

pressure systems are subject to dynamic changes particularly when other hot and cold 

taps/showers are opened and closed, which will cause changes in the water temperature 

at mixed water outlets such as showers.  For this reason and because these are now no 

more expensive than a manual shower we strongly recommend the use of thermostatic 

showers with this appliance.  These must be used in 3 storey properties where the 

impact on pressure/temperature of opening another tap in the system is greater than 

normal. The shower head provided must also be suitable for mains pressure supplies.

Pipe Layout

In all mains pressure installations it is important 

to remember that the incoming cold supply 

must be shared between all terminal fittings.  It 

is important that a 22mm supply is brought to 

the appliance and a 22mm take-off is continued 

at least to the bath.  If there are two baths, 28mm 

pipework should be considered.  One metre of 

smaller diameter pipework, or flow restrictors, 

should be provided on the final connection to 

all outlets so as to balance the water available.  

In any event the distribution pipework should 

generally be in accordance with BS EN806-1 to 5.

Plastic Pipework

This appliance is suitable for use with plastic 

pipework as long as the material is recommended 

for the purpose by the manufacturer and is installed 

fully in accordance with their recommendations.

Secondary Hot Water Circulation

All models 210 litres and above are fitted with 

a secondary return tapping as standard (see 

tables 1 and 2 for details).  If fitted, an extra 

expansion vessel may be necessary.  A non-

return valve MUST be FITTED near the return 

connection.  No valve or terminal fitting should 

be installed between the non return valve and 

the cylinder. (See schematic arrangement on 

page 15.) All pipes kept hot by the secondary 

circulation should be insulated.

INSTALLATION

INSTALLATION

Содержание PRO Series

Страница 1: ...safety and performance speci cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for speci cation and m...

Страница 2: ...heir safety Children should be supervised at all times to ensure they do not play with the appliance This information is provided to assist generally in the selection of equipment Responsibility for s...

Страница 3: ...ressure Primary heat exchanger Indirect models 6 bar Immersion heater rating 3kW 240V AC All cylinders are manufactured in accordance with the requirements of BS EN 12897 The tundish must be positione...

Страница 4: ...ro Indirect Ideal Pro Indirect is an unvented hot water storage cylinder and is provided with a high efficiency internal primary coil which is designed for use with a gas or oil boiler and is suitable...

Страница 5: ...Dual control overheat stat pocket 22mm 8 Primary return 22mm 9 Primary flow 22mm Part G3 loose components supplied in a separate box A Combination inlet group incorporating pressure reducing valve st...

Страница 6: ...Pressure Regulator 3 bar inlet group c w balance cold supply expansion vessel connection and expansion valve set at 4 5 bar Expansion Vessel size Pre charged to 3 bar Watts kW 24hr Litres kg kg bar L...

Страница 7: ...Peak Immersion Heater High Level Cold Feed 22mm Connection Off Peak Immersion Heater Low Level Volume of On Peak Water Heated Dual Control Overheat Stat 22mm Primary Return Connection 22mm Primary Fl...

Страница 8: ...es 1 shower room Bedsit 0 180 1 bathroom 2 2 180 1 bathroom 4 3 180 1 bathroom separate shower room 6 4 180 1 bathroom 2 separate shower rooms or 2 bathrooms 7 5 180 2 bathrooms separate shower room 7...

Страница 9: ...k is kept to a minimum Shower Fittings Aerated taps are recommended to prevent splashing Any type of shower mixing valve canbeusedaslongasboththehotandcoldsuppliesaremainsfed However allmains pressure...

Страница 10: ...he discharge be of metal and a Be at least one pipe size larger than the nominaloutletsizeofthesafetydeviceunless its total equivalent hydraulic resistance exceeds that of a straight pipe 9m long i e...

Страница 11: ...genuine replacement parts supplied or approved by Ideal Boilers are used All parts are available to approved installers from Ideal Boilers Tundish Hot Outlet To Drain PRV NRV Stop Tap Kitchen Cold Ta...

Страница 12: ...Danger of electrocution before making any adjustments to the thermostat isolate the immersion heater from the mains electricity supply at the fuse spur unit The immersion heater thermostats incorpora...

Страница 13: ...shed by means of a temporary connection between the circuit and a supply pipe provided a Listed double check valve or some other no less effective backflow prevention device is permanently connected a...

Страница 14: ...opposite shows how the blending valve can be piped onsite Figure 1 shows the cold water port of the blending valve connected to the mains cold water supply before the inlet control group This arrangem...

Страница 15: ...with stat Br B 4 core cable Outside Sensor Gr Ideal Logic Heat H with outside sensor For Logic System S ignore pump wiring IN L IN L N E SL2 SL1 Mains In Outside Sensor Ideal Logic Heat H with outside...

Страница 16: ...R Supplied with stat Br B 4 core cable Ideal Logic Heat H without outside sensor For Logic System S ignore pump wiring IN L IN L N E SL2 SL1 Mains In 1 9 8 7 6 5 4 3 2 10 11 12 N L 1 2 3 4 OFF ON OFF...

Страница 17: ...heat Stat Spade connectors required for earth connections Control Stat G Y Br R Supplied with stat Br B 4 core cable 1 9 8 7 6 5 4 3 2 10 11 12 N L 1 2 3 4 OFF ON OFF ON HW CH 1 2 3 4 Room Thermostat...

Страница 18: ...ed and refilled with the mains water immediately on completion of the disinfection procedure Damage caused through a failure to do this adequately will not be covered by the warranty Forthereasonsment...

Страница 19: ...ruction and blockage and are not passing any water 5 Check the condition and if necessary descale the heat exchangers in hard water areas 6 Check that water pressure downstream of pressure reducing va...

Страница 20: ...s electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units supplied fro...

Страница 21: ...tripped Check wiring links continuity and Re set END YES YES YES NO NO NO Switch on Set programmer Re set check wiring plumbing is correct Re set Is all wiring to the controls ok Replace thermostat Re...

Страница 22: ...Clear obstructions Is system free from restrictions blockages YES NO Is pressure reducing valve in combination valve working Clean or replace as required Is expansion vessel charge pressure correct R...

Страница 23: ...6748 3 Inlet group set at 3 bar c w expansion relief valve set at 4 5 bar 1 176750 4 12 litre expansion vessel 1 176751 5 18 litre expansion vessel 1 176752 6 24 litre expansion vessel 1 176753 7 35 l...

Страница 24: ...Page 24...

Страница 25: ...plumbed and pre wired for domestic hot water and one heating zone incorporating a sealed primary filling loop and mains cold feed inlet control components fitted The following pages only provide deta...

Страница 26: ...Drawing No Sheet No For Review Andrew T 14 09 2017 StainlessLite Pro PP Floor Template MIP 926 1 1 awing No MIP 926 P1 Rev No P1 Sh1 1 A3 Tolerance 3 0mm 1 4 1 2 3 4 5a 6 7 8 9 10 Cylinder Hot Outlet...

Страница 27: ...triction or valves fitted in the pipework between the boiler and the primary system safety valve 3 If the primary pipework from the boiler to the safety valve is more than 6 metres we recommend that t...

Страница 28: ...Heating 2 port valve 1 XG083 2 Hot water 2 port valve 1 XG083 3 Automatic primary heating byepass valve 1 XG019 4 Automatic air vent 1 FT434 5 28mm circulator gate valves 1 XB122 6 Filling loop compr...

Страница 29: ...rn Blue Or Gr Motor N OUT IN L Aux Sw HP22 2 PORT HTG VALVE Zone 1 8 N 6 7 Brn Blue Or Gr Motor N OUT IN L Aux Sw HP22 2 PORT DHW VALVE L N 13 N PUMP 15 14 N 11 10 9 PROGRAMMER N L ON ON LINKS WATER H...

Страница 30: ...Page 30...

Страница 31: ...tourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated...

Страница 32: ...As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of the item...

Страница 33: ...of any obsolete product and will collect and deliver to any address in England Scotland and Wales excluding all islands Our normal working times excluding Bank Holidays are 8am 6pm Monday to Friday 8...

Страница 34: ...te will then be issued to the customer Heating and Hotwater Industry Council HHIC www centralheating co uk demonstrating compliance with the appropriate Building Regulations and then handed to the cus...

Страница 35: ...me Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date...

Страница 36: ...ning servicing of central heating systems Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical Helpl...

Страница 37: ......

Страница 38: ......

Страница 39: ...surge in flow may be experienced which disappears as the pressure in the system stabilises This is quite normal with these types of systems and does not indicate a fault In some areas the water will i...

Страница 40: ...and performance speci cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for speci cation and maintenan...

Отзывы: