background image

Page 33

TERMS AND CONDITIONS

TERMS AND CONDITIONS

Ideal Unvented Cylinder Warranty Terms and Conditions

Ideal Boilers Limited provides a 2 year parts and labour warranty on the cylinder solution provided, the inner cylinder skin is further covered for 

on a replacement basis beyond this period to 25 years from the date of purchase, subject to adherence with the following terms and conditions of 

warranty 

1. 

The unit has been installed and commissioned in accordance with our installation and service instructions and all relevant codes of practice 

and regulations in force at the time of installation.

2. 

All necessary inlet controls and safety valves have been fitted correctly.

3. 

The unit has only been used for the storage of potable water supplied from the public mains. The water quality shall be in accordance with

4. 

European Council Directive 98/83 EC, or revised version at the date of installation, and is not fed with water from a private supply. Particular:

 

Chloride content:  

Max. 200 mg/l

 

Sulphate content:  

Max. 200 mg/l

 

Combination chloride/sulphate:   Max. 300 mg/l (in total)

5. 

If the newly fitted water heater is not in regular use then it must be flushed through with fresh water for at least 15 minutes. Open at least 

one hot water tap once per week, during a period of at least 4 weeks.

6. 

The Cylinder is registered within 30 days of installation, this can be done by calling Ideal Boilers on 

01482 498660

7. 

The unit has been regularly maintained as detailed in the installation and service instructions

8. 

If the Cylinder suffers a mechanical breakdown, calls must be raised with Ideal Boilers Customer Services on 

01482 498660

 

Our normal working times, excluding Bank Holidays are:

 

8am – 6pm Monday to Friday, 8am – 4pm Saturday,

 

8.00am – 12 noon Sunday

9. 

The guarantee for the stainless steel vessel is for twenty five years against material defect or manufacturing faults if the original unit is 

returned to us AND PROVIDED THAT:

 

 

(i)   It has not been modified, other than by Ideal.

 

 

(ii)   It has not been subjected to wrong or improper use or left uncared for.

 

 

(iii)  It has only been used for the storage of potable water supplied from the public mains, max 200mg/litre chloride.

 

 

(iv)  It has not been subjected to frost damage.

 

 

(v)   The benchmark service record is completed after each annual service.

 

 

(vi)  The unit has been serviced annually 

10. 

If the stainless steel vessel proves to be defective either in materials or workmanship we reserve the right to either repair or supply 

replacements or the closest possible substitute in the case of any obsolete product and will collect and deliver to any address in England, 

Scotland and Wales (excluding all islands):

 

Our normal working times, excluding Bank Holidays are:

 

8am – 6pm Monday to Friday, 8am – 4pm Saturday,

 

8.00am – 12 noon Sunday

 

Please note:

a.  Engineers will only attend to boiler products where it is considered by the engineer that the installation does not pose a risk to 

health and safety.

b.  A permanently fixed access ladder must service installations in lofts or attics. Adequate lighting and permanently fixed flooring 

must also be available.

c.  Compartment installations must provide minimum working clearances as detailed in the installation instructions. Ideal will not 

accept responsibility for the removal of fixtures or fittings in order to gain access for repairs.

11.  

The guarantee does not apply:

a.   If the Cylinder is removed from its place of installation without our prior consent.

b.   To any defect, damage or breakdown caused by inadequate servicing of the cylinder or by deliberate action, accident, misuse or 

third party interference including modification or an attempted repair which does not fully comply with industry standards.

c.   To any defect, damage or breakdown caused by the design, installation and maintenance of the central heating system.

d.   To de-scaling or other work required as a result of hard water scale deposits or from damage caused by aggressive water or 

sludge resulting from corrosion. 

e.   If the claim/contact procedure set out in section 12 is not adhered to

f.   To any other costs or expenses caused by or arising as a result of the breakdown of an Ideal Cylinder.

g.   To any defect resulting from the incorrect installation of the cylinder.

h.   To any costs incurred during delays in fixing reported faults.

12.  

We reserve the right to charge a call-out fee where:

a.   A fault cannot be found.

b.   The breakdown or fault has been caused by an event, which is excluded from the guarantee – refer to section 11

c.   Failure to cancel an agreed appointment prior to our engineers visit

d.   The Cylinder is outside the period of guarantee or the conditions of the guarantee have not been met.

13.  

If we fit replacement parts or replace a cylinder it will not extend the period of the warranty. All replaced parts or cylinders will become the 

property of Ideal Boilers Ltd.

14.  

The warranty applies only where an Ideal cylinder has been installed in a domestic dwelling in mainland United Kingdom, Northern Ireland 

and I.O.W. to provide hot water.

Our Ideal Warranty is offered in addition to the rights provided to a consumer by law. Details of these rights can be obtained from a Trading Standards 

Authority or a Citizen Advice Bureaux. Guarantor – Ideal Boilers Ltd, P.O. Box 103, National Avenue, Hull, HU5 4JN.

Содержание PRO Series

Страница 1: ...safety and performance speci cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for speci cation and m...

Страница 2: ...heir safety Children should be supervised at all times to ensure they do not play with the appliance This information is provided to assist generally in the selection of equipment Responsibility for s...

Страница 3: ...ressure Primary heat exchanger Indirect models 6 bar Immersion heater rating 3kW 240V AC All cylinders are manufactured in accordance with the requirements of BS EN 12897 The tundish must be positione...

Страница 4: ...ro Indirect Ideal Pro Indirect is an unvented hot water storage cylinder and is provided with a high efficiency internal primary coil which is designed for use with a gas or oil boiler and is suitable...

Страница 5: ...Dual control overheat stat pocket 22mm 8 Primary return 22mm 9 Primary flow 22mm Part G3 loose components supplied in a separate box A Combination inlet group incorporating pressure reducing valve st...

Страница 6: ...Pressure Regulator 3 bar inlet group c w balance cold supply expansion vessel connection and expansion valve set at 4 5 bar Expansion Vessel size Pre charged to 3 bar Watts kW 24hr Litres kg kg bar L...

Страница 7: ...Peak Immersion Heater High Level Cold Feed 22mm Connection Off Peak Immersion Heater Low Level Volume of On Peak Water Heated Dual Control Overheat Stat 22mm Primary Return Connection 22mm Primary Fl...

Страница 8: ...es 1 shower room Bedsit 0 180 1 bathroom 2 2 180 1 bathroom 4 3 180 1 bathroom separate shower room 6 4 180 1 bathroom 2 separate shower rooms or 2 bathrooms 7 5 180 2 bathrooms separate shower room 7...

Страница 9: ...k is kept to a minimum Shower Fittings Aerated taps are recommended to prevent splashing Any type of shower mixing valve canbeusedaslongasboththehotandcoldsuppliesaremainsfed However allmains pressure...

Страница 10: ...he discharge be of metal and a Be at least one pipe size larger than the nominaloutletsizeofthesafetydeviceunless its total equivalent hydraulic resistance exceeds that of a straight pipe 9m long i e...

Страница 11: ...genuine replacement parts supplied or approved by Ideal Boilers are used All parts are available to approved installers from Ideal Boilers Tundish Hot Outlet To Drain PRV NRV Stop Tap Kitchen Cold Ta...

Страница 12: ...Danger of electrocution before making any adjustments to the thermostat isolate the immersion heater from the mains electricity supply at the fuse spur unit The immersion heater thermostats incorpora...

Страница 13: ...shed by means of a temporary connection between the circuit and a supply pipe provided a Listed double check valve or some other no less effective backflow prevention device is permanently connected a...

Страница 14: ...opposite shows how the blending valve can be piped onsite Figure 1 shows the cold water port of the blending valve connected to the mains cold water supply before the inlet control group This arrangem...

Страница 15: ...with stat Br B 4 core cable Outside Sensor Gr Ideal Logic Heat H with outside sensor For Logic System S ignore pump wiring IN L IN L N E SL2 SL1 Mains In Outside Sensor Ideal Logic Heat H with outside...

Страница 16: ...R Supplied with stat Br B 4 core cable Ideal Logic Heat H without outside sensor For Logic System S ignore pump wiring IN L IN L N E SL2 SL1 Mains In 1 9 8 7 6 5 4 3 2 10 11 12 N L 1 2 3 4 OFF ON OFF...

Страница 17: ...heat Stat Spade connectors required for earth connections Control Stat G Y Br R Supplied with stat Br B 4 core cable 1 9 8 7 6 5 4 3 2 10 11 12 N L 1 2 3 4 OFF ON OFF ON HW CH 1 2 3 4 Room Thermostat...

Страница 18: ...ed and refilled with the mains water immediately on completion of the disinfection procedure Damage caused through a failure to do this adequately will not be covered by the warranty Forthereasonsment...

Страница 19: ...ruction and blockage and are not passing any water 5 Check the condition and if necessary descale the heat exchangers in hard water areas 6 Check that water pressure downstream of pressure reducing va...

Страница 20: ...s electrical ensure that the immersion heaters are isolated from the mains before re setting the energy cut out If the immersion heater s need replacing this should be done with the units supplied fro...

Страница 21: ...tripped Check wiring links continuity and Re set END YES YES YES NO NO NO Switch on Set programmer Re set check wiring plumbing is correct Re set Is all wiring to the controls ok Replace thermostat Re...

Страница 22: ...Clear obstructions Is system free from restrictions blockages YES NO Is pressure reducing valve in combination valve working Clean or replace as required Is expansion vessel charge pressure correct R...

Страница 23: ...6748 3 Inlet group set at 3 bar c w expansion relief valve set at 4 5 bar 1 176750 4 12 litre expansion vessel 1 176751 5 18 litre expansion vessel 1 176752 6 24 litre expansion vessel 1 176753 7 35 l...

Страница 24: ...Page 24...

Страница 25: ...plumbed and pre wired for domestic hot water and one heating zone incorporating a sealed primary filling loop and mains cold feed inlet control components fitted The following pages only provide deta...

Страница 26: ...Drawing No Sheet No For Review Andrew T 14 09 2017 StainlessLite Pro PP Floor Template MIP 926 1 1 awing No MIP 926 P1 Rev No P1 Sh1 1 A3 Tolerance 3 0mm 1 4 1 2 3 4 5a 6 7 8 9 10 Cylinder Hot Outlet...

Страница 27: ...triction or valves fitted in the pipework between the boiler and the primary system safety valve 3 If the primary pipework from the boiler to the safety valve is more than 6 metres we recommend that t...

Страница 28: ...Heating 2 port valve 1 XG083 2 Hot water 2 port valve 1 XG083 3 Automatic primary heating byepass valve 1 XG019 4 Automatic air vent 1 FT434 5 28mm circulator gate valves 1 XB122 6 Filling loop compr...

Страница 29: ...rn Blue Or Gr Motor N OUT IN L Aux Sw HP22 2 PORT HTG VALVE Zone 1 8 N 6 7 Brn Blue Or Gr Motor N OUT IN L Aux Sw HP22 2 PORT DHW VALVE L N 13 N PUMP 15 14 N 11 10 9 PROGRAMMER N L ON ON LINKS WATER H...

Страница 30: ...Page 30...

Страница 31: ...tourbridge West Midlands DY8 1PA TELEPHONE 01384 442611 FAX 01384 442612 Water Savings Water Related Costs Can Be Reduced By Good Plumbing Practice TAPS MIXERS SHOWERS Unregulated 25 30 l m Regulated...

Страница 32: ...As more than one person is required for these products ensure that one person is taking the lead This may be you so ensure that each person that is helping is made aware of the weight and of the item...

Страница 33: ...of any obsolete product and will collect and deliver to any address in England Scotland and Wales excluding all islands Our normal working times excluding Bank Holidays are 8am 6pm Monday to Friday 8...

Страница 34: ...te will then be issued to the customer Heating and Hotwater Industry Council HHIC www centralheating co uk demonstrating compliance with the appropriate Building Regulations and then handed to the cus...

Страница 35: ...me Telephone No Comments Signature SERVICE 05 Date Engineer name Company name Telephone No Comments Signature SERVICE 07 Date Engineer name Company name Telephone No Comments Signature SERVICE 09 Date...

Страница 36: ...ning servicing of central heating systems Ideal Boilers Ltd PO Box 103 National Avenue Kingston Upon Hull HU5 4JN Tel 01482 492251 Fax 01482 448858 Registration No London 322 137 Ideal Technical Helpl...

Страница 37: ......

Страница 38: ......

Страница 39: ...surge in flow may be experienced which disappears as the pressure in the system stabilises This is quite normal with these types of systems and does not indicate a fault In some areas the water will i...

Страница 40: ...and performance speci cation that we require Do not use reconditioned or copy parts that have not been clearly authorised by Ideal For the very latest copy of literature for speci cation and maintenan...

Отзывы: