13
Falcon GTE -
Installation & Servicing
INSTALLATION
15 FITTING THE SILICON BRAID
1.
Working from point A, insert the silicone braid into the
groove of the intermediate and front sections.
2.
Cut it to the correct length.
A
FAL5822
1
2
16 ASSEMBLING THE INTERMEDIATE
SECTIONS
1.
Place the first intermediate section on the wooden block.
2.
Fit the connections of the intermediate section onto the
nipples in the rear section.
3.
Hammer in with the help of a small wooden block.
4.
Proceed likewise for the other intermediate sections.
FAL5823
3
3
17 ASSEMBLING THE FRONT SECTION AND PULLING UP COMPLETE ASSEMBLY
1.
Complete the assembly with
the front section.
2.
Insert the assembly tool
through the nipples and
tighten.
3.
Remove the wooden block
4.
Slide the two threaded rods in
place without removing the
assembly tool and secure with
the four M8 flanged nuts
supplied.
5.
Clean off any surplus silicone.
6.
Remove the assembly tool.
7.
Level the boiler by adjusting its
feet.
FAL5824
4
2
4
3
7
4
4
1
2
INST
ALLA
TION
Содержание Falcon GTE 4
Страница 30: ...30 Falcon GTE Installation Servicing NOTES...
Страница 31: ...31 Falcon GTE Installation Servicing NOTES...