Concord CXA/H -
Installation and Servicing
9
INSTALLATION
CASING PACK contains:
•
Front panel ...................... 1 off
•
Side panel....................... 2 off
•
Top panel ........................ 1 off
•
Top support bracket ........ 2 off
•
Flue brush....................... 1 off
•
Casing hardware pack ... 1 off
Legend
1
. Cleanout cover
2.
Collector hood
3.
Middle section
4.
Section alignment rings & 'O' rings
5.
End section
6.
Gas cock
10.
Burner manifold assy.
11.
Base plate
12.
Combustion chamber
7.
Drain cock
8.
NOx duct
9.
Front plate
5
CONCORD CXA/H BOILER ASSEMBLY - Exploded view
6
PACKAGING
Check that all these packages are complete and have been
correctly received on site.
Factory assembled boilers are despatched from the works as
fully packaged units comprising:
1.
Assembled boiler body (with distributor tube) on a wooden
pallet base enclosed in a wooden crate.
2.
Carton containing the casing, fastenings and flue brush.
3.
Carton containing the installation pack and instruction books.
4.
Carton containing the control box.
INSTALLATION HARDWARE PACK contains:
•
M10 washer ..................................... 4 off
•
Split pin ............................................ 1 off
•
Strain relief bush ............................. 1 off
•
M10 x 25 Hex. Hd. screw ................. 2 off
•
M10 x 35 Hex. Hd. screw ................. 2 off
•
Gasket EPDM Type EP600 .............. 3 off
•
Plug 2" taper Sq.Hd. ........................ 3 off
•
Installation/Service instructions ...... 1 off
•
User's instructions .......................... 1 off
•
Flange RC 1" ................................... 1 off
•
2" BSP Flange (distributor tube) ...... 1 off
•
2" Installation pipe (handling bars) . 2 off
•
Thermostat pockets ......................... 2 off
13.
Section bolt
14.
Distribution tube
15.
Tie rods
16.
Thermostat pocket
17.
Spillage skirt
18.
Gas pipe
Con
1942
Alignment notches
Distribution tube detail
1
2
18
3
4
5
7
8
6
9
10
11
12
13
14
15
16
17
INST
ALLA
TION
Содержание Concord CXA 100/H
Страница 1: ......