![IDEAL INDUSTRIES NaviTEK II Скачать руководство пользователя страница 23](http://html.mh-extra.com/html/ideal-industries/navitek-ii/navitek-ii_user-manual_617103023.webp)
NaviTEK II
151810 Iss 1
User Guide
Page 23
Ping4 and Ping6
Ping will test the availability and measure the response times of devices and URLs.
The results of a successful test, both in progress and passed are shown in Fig 33. The range of possible
results are listed next to the figure.
Info: READY,
IN PROGRESS, PASSED,
NO RESPONSE,
UNKNOWN HOST.
Tx: Count of transmitted
ping frames: 1 to 999999.
Rx: Count of successfully
received Ping responses:
1 to 999999.
Delay: Round trip delay in
ms between transmitting
Ping
and
receiving
response. Displayed as
Minimum, Average and
Maximum.
Fig 33
TRoute4 and TRoute6
Trace Route will display the route and measure transit delays of frames across an IP network.
Press the soft key SETUP (F3) to enter the target or select one from the v4 or v6 TARGET look-up table,
and to view or amend the test settings.
Select an individual hop to view its
statistics.
The soft keys PREV (F1) and
NEXT (F3) and are used to
navigate between individual hops.
Each hop is traced three times.
The time recorded during each
trace is displayed in ms as T1, T2
and T3.
Fig 34
www.vemco.pl
Содержание NaviTEK II
Страница 1: ...NaviTEK II User Guide 151810 issue 1 w w w v e m c o p l ...
Страница 45: ...w w w v e m c o p l ...
Страница 46: ...A subsidiary of IDEAL INDUSTRIES INC w w w v e m c o p l ...