background image

7

SECTION 1 - GENERAL

CH FLOW

DHW OUTLET

COND. DRAIN

GAS INLET

DHW INLET

CH RETURN

PRV

W

 A L

 L

Underside View - Dimensions to Wall

395

2.5

2.5

from case

700

Side

flue

dim. A

285

86.5

17

155

43.5

65 28.5 28.5 60.5

75

39.5

54.5

WALL

103

34

99

103

99

103

1.7  BOILER DIMENSIONS, SERVICES & CLEARANCES 

The following minimum clearances must be maintained for 

operation and servicing.
Additional space will be required for installation, depending upon 

site conditions.

Side and Rear Flue

a.   Provided that the flue hole is cut accurately, e.g. with a core 

boring tool or hole cutter  the flue can be installed from inside 

the dwelling where wall thicknesses do not exceed 600mm. 

Where the space into which the boiler is going to be installed 

is less than the length of flue required the flue must be fitted 

from the outside.

Installation from inside ONLY

b.  If a core boring tool or hole cutter  is to be used inside the 

dwelling  the space in which the boiler is to be installed 

must be at least wide enough to accommodate the tool.

In either of the above cases safe external access is 

required to allow the addition of sealant to seal the flue to 

the aluminium flue collar (RSF 060).

Front clearance

The minimum front clearance when 

built in to a cupboard is 5mm from 

the cupboard door but 450mm overall 

clearance is still required, with the 

cupboard door open, to allow for 

servicing.

 

Bottom clearance

  Bottom clearance after installation 

can be reduced to 5mm. 

  This must be obtained with an 

easily removable panel, to provide 

the 100mm clearance required for 

servicing.

Max 30kW

Max 24kW

2. For flue lengths requiring “D” pack extensions (RSF 341), the flue must incline by 26mm per 1 Metre of flue length.

Содержание III Series

Страница 1: ...co uk To Domestic Hot Water GB24 Propane Minimum 4 9 kW 16 600 Btu h GB30 Propane Minimum 6 1 kW 20 700 Btu h GB24 Propane Maximum 24 2 kW 82 570 Btu h GB30 Propane Maximum 30 3 kW 103 384 Btu h To C...

Страница 2: ...2 Combination Boiler Destination Country GB UK IE Ireland Ideal GB24 GB30 Series III...

Страница 3: ...rk Generator Replacement 23 3 14 Gas Control Valve Replacement 24 3 15 Divterter Valve Actuator Replacement 24 3 16 Condensate Trap Siphon Replacement 25 3 17 Main PCB Replacement 26 3 18 Replacing Th...

Страница 4: ...rformance Data Domestic Hot Water Required for maximum flow rate Boiler operates down to 2 l min DHW delivery Ideal GB Series III 24 30 Gas Supply I3P G31 37mbar Gas Supply Connection 15mm copper comp...

Страница 5: ...draw off of 24 9 9 l min at 35 o C temperature rise 30 12 4 l min at 35 o C temperature rise The DHW draw off rate specified above is the nominal that the boiler flow regulator will give Due to system...

Страница 6: ...Gas Installer In the approved country the boiler is installed this must be in accordance with their current rules in force Detailed recommendations are contained in the following British Standard Code...

Страница 7: ...e length of flue required the flue must be fitted from the outside Installation from inside ONLY b If a core boring tool or hole cutter is to be used inside the dwelling the space in which the boiler...

Страница 8: ...CTOR ASSEMBLY 214 VENTURI 215 FAN 217 BURNER 218 GASKET BURNER 219 SUMP CLEAN OUT COVER 223 FLUE MANIFOLD 224 FLUE MANIFOLD TOP 227 CLAMP RETAINING FLUE TURRET 228 HOSE CONDENSATE INTERNAL 229 SIPHON...

Страница 9: ...e air duct MUST be sealed with sealant to create an adequate seal WALL Aluminium Flue Collar RSF 060 Fill with sealant 17mm min Internal Sealing Flubber Fill with sealant It is IMPORTANT that all atta...

Страница 10: ...outer edge to aid assembly Centre of turret to edge of turret 100mm Turret has a flue insertion of 30mm The white outer flue tube must protrude the wall by 17mm From centreline of turret to wall Rear...

Страница 11: ...turret on until it has travelled 30mm on to the flue pipe and is fully engaged Make sure the flue has not rotated or moved forward during fitting and the flue seam is upper most 3 Push the turret into...

Страница 12: ...e boiler and its flue system Note The resistance of the deflector is equivalent to 1 metre of flue length Ensure this is used when calculating the maximum allowable flue length 2 Choose the direction...

Страница 13: ...alcony 500 mm Below velux windows 2000mm Above or side of velux windows 600mm 2 9 ASSEMBLING THE ROOF FLUE KIT 1 Position the roof plate supplied separately over the hole cut in the roof and insert fl...

Страница 14: ...nating into a suitable internal foul water discharge point such as an internal soil and vent stack or internal kitchen or bathroom waste pipe etc fig 3 External Drain Connections The use of an externa...

Страница 15: ...ater Weather proof insulation Max 3m external pipework Limestone chippings 500 300 25 2 rows of three 12mm holes 25mm centres 50mm from the bottom of the tube facing away from the house Minimum connec...

Страница 16: ...E DHW LIVE X3 PUMP GND X9 X8 OWC OWC OPENTHERM OPENTHERM CHIP COM BUS TX CHIP COM BUS 24V CHIP COM BUS GND CHIP COM BUS 5V CHIP COM BUS RX MAINS LIVE MAINS NEUTRAL AUXILIARY LIVE IONISATION FLOW DHW D...

Страница 17: ...leaning procedures are covered more fully in Sections 3 3 3 7 and MUST be carried out in sequence IMPORTANT 6 After completing the servicing or exchange of components always ensure all gas valve conne...

Страница 18: ...onto the top retaining clips 5 Retain the upper panel with the two fixing screws previously removed ensuring a good seal is made 6 Swing the lower front panel up and retain with the two screws 7 Close...

Страница 19: ...er head is a ceramic plaque construction Care must be taken to ensure that the burner is not placed down upon its face as this may cause damage to the ceramic 6 Brush off any deposits that may be on t...

Страница 20: ...nition gap is correct Refer to Sections 3 12 3 13 1 Ignition Electrode Earth Wire Reassemble the boiler in the following order 1 Ensure that the condensate trap siphon is full of water 2 Refit the bur...

Страница 21: ...to Section 3 19 THE BOILER MUST NOT BE OPERATED WITHOUT THE FRONT PANEL FITTED 3 9 FAN REPLACEMENT 1 Refer to Section 3 8 2 Disconnect the electrical leads from the fan 3 Remove the clip from the gas...

Страница 22: ...any damaged or deteriorating sealing gasket 8 Reassemble in reverse order 9 Check the operation of the boiler 1 Refer to Section 3 8 2 Disconnect the electrical leads from the fan 3 Remove the clip fr...

Страница 23: ...the electrode 7 Fit the new ignition electrode using the new gasket supplied Check dimensions as shown 8 Reassemble in reverse order 9 Check the operation of the boiler Ignition Electrode 3mm Straigh...

Страница 24: ...ATOR REPLACEMENT Refer to Section 3 8 To remove the motor 1 Remove the condensate trap siphon Refer to Section 3 16 2 Place a flat bladed screwdriver in the actuator slot provided and ease out the act...

Страница 25: ...off the rubber pipe at the siphon 3 Turn the siphon clockwise to disengage and lift to remove 4 Reassemble in reverse order 5 When reassembling ensure the trap is full of water 6 Check operation of t...

Страница 26: ...uide and secure this to the new PCB 9 Insert the new PCB and secure all electrical connections Ensure control knobs are correctly aligned with PCB 10 Reassemble in reverse order If programming of the...

Страница 27: ...ill be experienced during replacement of components 3 After replacing any component on the boiler DHW circuit re fill as appropriate 4 Check operation of the boiler CENTRAL HEATING CIRCUIT 1 Refer to...

Страница 28: ...reeze Check operation of the boiler 5 7 4 1 Refer to Section 3 8 2 Drain the heating system Refer to Section 3 19 3 Remove the boiler front See Section 3 8 lower the control panel and remove the contr...

Страница 29: ...7 Remove the pump electrical connection Refer to Section 3 26 no 3 8 Remove DHW Turbine electrical connection Refer to Section 3 20 no 3 9 Remove the DHW plate heat exchanger note orientation Refer to...

Страница 30: ...g a suitable tool pull out the metal retaining clip 5 Carefully withdraw the pressure switch 6 Fit the new pressure switch and re assemble in reverse order 7 Refill the boiler and add the correct volu...

Страница 31: ...anner should be used 5 Fit the new thermistor using the sealing washer provided 6 Reassemble in the reverse order 7 Refill the boiler and add the correct volume of anti freeze 8 Check the operation of...

Страница 32: ...llows clearance of the pipe from heat exchanger plugs Lift pipe and remove 13 Remove the two heat exchanger fixing screws 14 To remove the Heat exchanger slide out of location bracket 15 Remove the co...

Страница 33: ...pressure to 0 75 bar 5 Re assemble in reverse order re fill the boiler and add the correct volume of anti freeze 6 Check operation of the boiler REPLACEMENT 7 Refer to Section 3 8 8 Drain the boiler C...

Страница 34: ...r hot water but the appliance has reached the desired temperature set on the boiler The boiler is operating in central heating mode The boiler is operating in domestic hot water mode The boiler is ope...

Страница 35: ...er letter refer to page 34 L Boiler is in lockout for a specific error Display will show L with a number or letter to show which error is detected F Boiler has a fault for a specific error Display wil...

Страница 36: ...e house are working to confirm a supply is present in the property 3 If other appliances do not work or there are no other appliances check the gas supply is on at the meter and or pre payment meter h...

Страница 37: ...FAULT GO TO SECTION 4 13 RETURN THERMISTOR FAULT GO TO SECTION 4 14 OUTSIDE SENSOR FAULT LOW MAINS VOLTAGE CONTACT ELECTRICITY PROVIDER NEGATIVE DIFFERENTIAL FLOW OR RETURN THERMISTOR FAULT PCB UNCONF...

Страница 38: ...Check wiring connection from gas valve to PCB for continuity If the wiring is OK then replace the PCB NO Replace Spark Generator and harness as necessary NO Replace ignition detection electrode and a...

Страница 39: ...Are the Boiler and CH System filled with water and radiator valves open check pressure gauge is between 1 to 1 5 bar NO NO YES Fill and vent the system and open all isolation valves YES Are connection...

Страница 40: ...lectrode and associated harness for continuity visual condition and position Refer to Section 3 12 Are these functioning correctly YES Check siphon and condensate drain pipe work for blockage and rect...

Страница 41: ...NO Securely connect the wiring to the PCB Is the wiring securely connected to the Flow Thermistor located in the top of the Heat Exchanger YES NO Securely connect the wiring to the Flow Thermistor NO...

Страница 42: ...Disconnect the wires to the outside sensor Check the resistance using a suitable multimeter connected across the Outside Sensor s terminal pins At 0 o C expect 31 000 35 000 Ohms At 15 o C expect 15...

Страница 43: ...rise and check filter fitted in turbine is not blocked with debris NO Reconnect wiring or replace wiring harness if no continuity NO Re engage diverter head NO Replace PCB Is hot and cold pipework cr...

Страница 44: ...spare parts product training please phone us on 01482 325456 or contact us at the address below MORCO PRODUCTS LTD Morco House Riverview Road Beverley East Yorkshire HU17 0LD TEL 01482 325456 FAX 014...

Отзывы: