42
Installation and Servicing
SECTION 2 - INSTALLATION
2.30 HANDING OVER
6.
Explain and demonstrate the function of time and
temperature controls, radiator valves etc., for the economic
use of the system.
7.
If a timer is fitted draw attention to the timer Users
Instructions and hand them to the householder.
8.
Explain Boiler restart procedure.
9.
After installation and commissioning please complete the
Benchmark Commissioning Checklist before handover to the
customer. For IE, its is necessary to complete a “Declaration of
Conformity” to indicate compliance to I.S. 813:2002.
IMPORTANT
10.
A comprehensive service should be carried out ANNUALLY.
Stress the importance of regular servicing by a Gas Safe
Registered Engineer. In IE servicing work must be carried out
by a Registered Gas Installer (RGII).
11.
Inform the householder of the guarantee/registration found
within the envelope pack and the requirement to register it to
receive the full benefit of the warranty.
1.
Hand the User Instructions to the householder and
explain his/her responsibilities under the relevant national
regulations.
2.
Explain and demonstrate the lighting and shutting down
procedures.
3.
The operation of the boiler and the use and adjustment of all
system controls should be fully explained to the householder,
to ensure the greatest possible fuel economy consistent with
the household requirements of both heating and hot water
consumption.
Advise the User of the precautions necessary to prevent
damage to the system and to the building, in the event of the
system remaining inoperative during frosty conditions.
4.
Explain the function and the use of the boiler heating
controls.
5.
Explain the function of the boiler fault mode.
Emphasise that if a fault is indicated refer to “Fault Codes” in
the User Guide.
After completing the installation and commissioning of the system the installer should hand over to householder by the
following actions:
2.29 ACCESSING THE INSTALLER MODE
To access Installer Mode press the function button and “RESTART”
Buttons together for more than 5s.
1. The last 3 faults will be shown
See Section 4.1 for Fault Code descriptions
2. “SL” will be shown
To run the burner at minimum rate press “RESTART”, otherwise
press the function button.
3. “SH” will be shown
To run the burner at maximum rate press “RESTART”, otherwise
press the function button.
4. “VF” will be shown
press the function button.
5. “dU” will be shown
press the function button.
6. “P1” will be shown
Press the function button.
7. “P7” will be shown
Press the function button.
8. “FL” will be shown
This feature is not required on this appliance. Press the function
button.
9. “SE” will be shown
This feature is not required on this appliance. Press the function
button to exit.
INST
ALLA
TION
Содержание LOGIC MAX HEAT H 12
Страница 4: ...4 Installation and Servicing ...
Страница 6: ...6 Installation and Servicing ...
Страница 61: ...61 NOTES Installation and Servicing ...
Страница 62: ...62 Installation and Servicing SECTION 5 SPARE PARTS ...
Страница 68: ...68 NOTES Installation and Servicing ...
Страница 69: ...69 NOTES Installation and Servicing ...