1.
Refer to Frame 52.
2.
Swing the control box down into the servicing position. Refer
to Frame 46.
3.
Drain the boiler. Refer to Frame 72.
4.
Remove the diverter valve actuator head. Refer to Frame 62.
5.
Remove the water pressure switch. Refer to Frame 77.
6.
Remove flow pipe union nut.
7.
Unscrew the pressure gauge connection.
8.
Remove the allen screw retaining the divertor brass
housing.
4
9.
Remove the two union connections to the CH flow and
the DHW flow at the underside of the boiler.
10.
Lift the divertor brass housing and remove.
11.
Unscrew the top and bottom connections to access the
internal parts.
12.
Fit the new valve mechanisms ensuring the correct fit of
the pin.
13.
Reassemble in reverse order.
14.
Refill the boiler. Refer to Frame 32.
15.
Check operation of the boiler. Refer to
Frame 52.
6
5
11
12
12
11
10
7
1.
Refer to frame 52
2.
Close all the water isolating (CH and DHW) valves on the
boiler inlet.
3. To drain the central heating circuit
:
a. Attach a length of hose to the drain point and open the
drain valve.
b. Remove diverter valve actuator (Refer to Frame 62).
c.
To ensure the boiler and heat exchanger are fully drained,
the diverter valve must be held in mid-position. Using a
suitable tool depress the plunger in the diverter valve
housing by approximately 3mm (1/8") and hold until
draining is complete.
d. Replace diverter valve actuator.
4. To drain the domestic hot water circuit
. As there is no direct
drain for the domestic hot water circuit, depending on the
location of the boiler, opening the lowest hot water tap may
drain this circuit. However it must be noted that some residual
water will be experienced during replacement of components.
5. After replacing any component on the boiler, close the drain
valve, remove the hose and open all system isolating valves
(re-pressurise as appropriate with filling loop provided)
before proceeding to check operation of the boiler.
6.
Check operation of the boiler. Refer to Frame 52.
CH Flow
Isolation
valve
Drain
Point
Drain
Valve
DHW Inlet
Isolation
valve
CH Return
Isolation
valve
esp8840
b
c
8
SER
VICING
203642-4.pmd
10/01/2008, 13:51
52
Содержание Ideal Esprit HE24
Страница 2: ...2 Esprit Installation and Servicing ...
Страница 59: ...59 Esprit Installation and Servicing ...
Страница 68: ...68 NOTES Esprit Installation and Servicing ...