39
SERVICING
Esprit -
Installation and Servicing
44 SERVICING SCHEDULE
WARNING.
Always turn OFF the gas supply at the gas service cock, and switch OFF and disconnect the electricity
supply to the appliance before servicing.
Note.
In order to carry out either servicing or replacement of
components the boiler front panel must be removed. Refer to
Frame 45.
IMPORTANT.
8.
After completing the servicing or exchange of components
always test for gas tightness.
9.
When work is complete the boiler front panel MUST be
correctly refitted, ensuring that a good seal is made.
Do NOT OPERATE the boiler if the front panel is not fitted.
10.
If, for any reason, the condensate trap/siphon has been
removed ensure it is refilled with water before
reassembling.
11.
Check the gas consumption.
12.
Connect a suitable gas analyser to the sampling point on
the top of the boiler (refer to Frame 45) or into the flue
terminal if access is possible (optional test).
For correct boiler operation, the CO/CO
2
content of the flue
gas should not be greater than 0.004 ratio.
13.
Complete the service section in the Benchmark
Commissioning Checklist.
To ensure the continued safe and efficient operation of the
appliance it is recommended that it is checked at regular
intervals and serviced as necessary. The frequency of
servicing will depend upon the installation condition and
usage but should be carried out at least annually.
It is the law that any service work must be carried out by a
CORGI registered installer. In IE service work must be carried
out by a competent person.
1.
Light the boiler and carry out a pre-service check, noting
any operational faults.
2.
Clean the main burner.
3.
Clean the heat exchanger and the condensate trap/siphon.
4.
Check the condition of the combustion chamber
insulation. Any cracked, damaged or displaced pieces
should be replaced.
5.
Check the main injector for blockage or damage.
6.
Check that the flue terminal is unobstructed and that the
flue system is sealed correctly.
7.
Check the DHW filter for blockage. Refer to Frame 75.
The servicing procedures are covered more fully in Frames
46-51 and MUST be carried out in sequence.
45 BOILER FRONT PANEL REMOVAL
1.
Loosen the 2 screws securing the front
panel (located under the boiler).
2.
Pull the tabs on the retaining clips to
release the bottom of the front panel.
3.
Pull the panel forward at the bottom and
lift to disengage the top lugs.
Flue
sampling
point
esp8852(1)
1
2
SER
VICING
203642-4.pmd
10/01/2008, 13:51
39
Содержание Ideal Esprit HE24
Страница 2: ...2 Esprit Installation and Servicing ...
Страница 59: ...59 Esprit Installation and Servicing ...
Страница 68: ...68 NOTES Esprit Installation and Servicing ...