40
SERVICING
ESPRIT 2 -
Installation and Servicing
48
SERVICING SCHEDULE
For the very latest copy of literature for specification and maintenance practices visit our website www.idealheating.com,
where you can download relevant information. N.B. Technical Bulletins are also available on our website.
WARNING. Always turn OFF the gas supply at the gas service cock, and switch OFF and disconnect the electricity
supply to the appliance before servicing.
The servicing procedures are covered more fully in Frames 49-
56 and MUST be carried out in sequence.
Note.
In order to carry out either servicing or replacement of
components the boiler front panel and sealing panel must be
removed. Refer to Frames 49 and 50.
IMPORTANT.
9.
After completing the servicing or exchange of components
always test for gas tightness.
10.
When work is complete the sealing panel MUST be
correctly refitted, ensuring that a good seal is made.
Do NOT OPERATE the boiler if the sealing panel is not fitted.
11.
If, for any reason, the condensate ‘S’ trap has been
removed ensure the trap is refilled with water before
reassembling.
12.
Check the gas consumption.
13.
Connect a suitable gas analyser to the sampling point on
the top of the boiler (refer to Frame 49) or into the flue
terminal if access is possible (optional test).
For correct boiler operation, the CO/CO
2
content of the flue
gas should not be greater than 0.004 ratio.
14.
Complete the service section in the Benchmark
Commissioning Checklist.
To ensure the continued safe and efficient operation of the
appliance it is recommended that it is checked at regular
intervals and serviced as necessary. The frequency of
servicing will depend upon the installation condition and usage
but should be carried out at least annually.
It is the law that any service work must be carried out by a Gas
Safe Registered Engineer. In IE service work must be carried
out by a Registered Gas Installer (RGII).
1.
Light the boiler and carry out a pre-service check, noting any
operational faults.
2.
Clean the main burner.
3.
Clean the heat exchanger & ‘S’ trap.
4.
Check the condition of the combustion chamber insulation.
Any cracked, damaged or displaced pieces should be
replaced. Ionisation probes are a servicable component
and require inspecting annually. Replace if distorted.
5.
Check the main injector for blockage or damage.
6.
Wherever possible remove and clean the condensate ‘S’
trap (refer to Frame 54) and check the drain for blockage.
7.
Check that the flue terminal is unobstructed and that the
flue system is sealed correctly.
8.
Check the DHW filter for blockage. Refer to Frame 33.
SER
VICING
206091-1.pmd
26/05/2010, 16:08
40
Содержание Esprit 2
Страница 2: ...2 ESPRIT 2 Installation and Servicing ...
Страница 65: ...65 SHORT LIST OF PARTS ESPRIT 2 Installation and Servicing 95 SHORT LIST 103 98 ispfu9879 ...
Страница 67: ...67 ESPRIT 2 Installation and Servicing ...
Страница 68: ......
Страница 70: ...Gas Safe Register ID Number ...