16
INSTALLATION
ESPRIT 2 -
Installation and Servicing
FLUE OUTLET
Wall Thickness X
160 mm
160 + S = 193mm
nm8943
FLUE KITS
Pack B
- supplied as standard
Pack D
- optional extension kit for side flue or rear flue outlet
SCREW KIT
- Optional kit for mechanical fixing of flue joints
Finishing Kit
- Supplied as an optional extra
Refer to 'Flue Extension Ducts'
IMPORTANT.
The boiler MUST be installed in a vertical position
Dimension X
-
Wall thickness.
Dimension L
-
Wall thickness plus boiler spacing.
Dimension S
-
Stand-off frame depth = 33mm
12
DETERMINING THE FLUE LENGTH AND FLUE PACKS REQUIRED
Note.
MAXIMUM FLUE LENGTHS:
24 & 30
- 6M (HORIZONTAL FLUE)
35
- 3M (HORIZONTAL FLUE)
24, 30 & 35
- 7.5M (ROOF FLUE)
24, 30 & 35
- 5M PRIMARY AND 17M SECONDARY IS A TYPICAL MAX. FLUE LENGTH.
(For alternative details refer to Powered Vertical Instructions)
90
O
ELBOW KIT 60/100 (EQUIVALENT FLUE LENGTH RESISTANCE = 1M)
45
O
ELBOW KIT 60/100 (EQUIVALENT FLUE LENGTH RESISTANCE = 0.6M)
MINIMUM HORIZONTAL FLUE LENGTHS
- TELESCOPIC TERMINAL = 370MM
(Centre Line of turret to outside of wall terminal)
- ONE PIECE TERMINAL = 285MM
195mm 195mm
Wall Thickness X
Side flue length L
SIDE FLUE
REAR FLUE
continued . . . . .
206091-1.pmd
26/05/2010, 16:08
16
Содержание Esprit 2
Страница 2: ...2 ESPRIT 2 Installation and Servicing ...
Страница 65: ...65 SHORT LIST OF PARTS ESPRIT 2 Installation and Servicing 95 SHORT LIST 103 98 ispfu9879 ...
Страница 67: ...67 ESPRIT 2 Installation and Servicing ...
Страница 68: ......
Страница 70: ...Gas Safe Register ID Number ...