Concord CXSD/H  -  

Installation & Servicing

FAULT FINDING

  FAUL

T FINDING FAUL

T FINDING FAUL

T FINDING FAUL

T FINDING FAUL

T FINDING FAUL

T FINDING

WARNING

.

The ON/STANDBY [1/0] button  does 

NOT

 electrically

isolate the boiler.

Before attempting any electrical fault finding ALWAYS carry
out the preliminary electrical system checks as detailed in the
Instructions for the British Gas Multimeter or other similar
commercially available meter.

The preliminary electrical system checks are the FIRST
electrical checks to be carried out during a fault finding
procedure.

On completion of any service/fault finding task which has
required the breaking and remaking of electrical connections
the following checks MUST be repeated:

a.

Earth continuity

b.

Polarity

c.

Resistance to earth

Detailed instructions on the replacement of faulty components
are contained in the 'Servicing' section of these Installation &
Servicing Instructions.

GENERAL INFORMATION

If a flow switch is not connected to the boiler a link should be
fitted between the 2 terminals for the flow switch. If the
terminals are left disconnected the display will indicate "No
flow" and the boiler will not operate.

Anti-cycle will be in operation each time the boiler thermostat
is satisfied and a rapid demand for heat is required. The same
situation will occur if the external controls operate rapidly. This
feature reduces component wear and ensures continuous
troublefree operation. The Anti-cycle duration is 1-3 minutes.

If the system pump, with a maximum current of 3A, is
connected to the boiler pump terminals, pump overrun will be
in operation if the flow temperature is greater than 75 

o

C, when

the heat demand is satisfied, and will continue to run until the
boiler flow is less than 75 

o

C. If the flow temperature is less

than 75 

o

C, when the demand for heat is satisfied, then the

pump will cease to operate.

Frost protection is inbuilt with the boiler. If the flow temperature
falls to approximately 3 

o

C then the boiler will operate until the

flow temperature exceeds 4 

o

C. If an external frost thermostat

is required the internal programmer should be set to 24 hours
under the programme status menu and an external
programmer and frost thermostat wired and connected to the
volt free external control terminals on the boiler.

There is an option kit available with 2 sets of volt free contacts.
One set of volt free contacts is for "Lockout" and "Overheat"
combined and one set of volt free contacts is for "Boiler run".

There is an option kit available to enable temperature
compensation to be used. The outside temperature adjusts the
boiler flow temperature to satisfy the heating load and ensure
efficient boiler operation.

The gas valves operate on 

High/Low

 and 

Off

 principle. At

start up, with the flow temperature less than 55 

0

C the boiler

will start at low rate and after 1-3 minutes the high rate gas
valve will open. On reaching the set point, determined by the
user, the boiler will go to low rate and when the temperature

51 BOILER CONTROL

reaches the set point plus 3 

o

C the low rate gas valve will

close. When  the temperature falls 2 

o

C the boiler will start at

low rate and remain there until the temperature falls to the set
point less 2 

o

C then the high rate gas valve will operate.

On start up the high rate gas valve will operate immediately
after detection if the boiler flow rate is greater than 55 

o

C.

In order to determine the continued correct operation of the
control every 4 hours the boiler will shut down for a maximum
of 30 seconds to do a self check operation and restart
automatically.

The control will display the number of operational hours of the
boiler to the nearest hour and cannot be reset.

The boiler thermostat has a range of 60 

o

C-80 

o

C, in 1 

o

C

steps, with an accuracy of ± 2 

o

C and hysteresis of 3 

o

C.

The full sequence control enables 5 attempts at ignition, with
one minute intervals between attempts, followed by
nonvolatile lockout if detection does not take place.

If the [0/1] switch on the front panel is at "Standby.....0" then
the pump will continue to run indefinitely. In this state the frost
protection can not operate.

In "Lockout" the pump will continue to run only if the
temperature is greater than 75 

o

C.  If it is less then the pump

will be off.

FAULT FINDING

The boiler control has a unique fault diagnostic feature which
can, in the unlikely event of a failure, display a message
indicating the nature of the fault to assist a speedy and
effective repair.

The faults that are diagnosed are overheat thermostat, pump,
boiler sensor, gas valve(s), air pressure switch (if fitted), fan
(if fitted), float switch (if fitted), outside sensor (if fitted) with
indication of combustion lockout.

In the unlikely event of a fault the display will indicate
precisely the fault and give a step by step indication of the
method of correcting the fault.

If the HT generator should cease to function it is impossible to
automatically display this condition. Should this fault occur
then:-

 would be displayed and the subsequent display screens
would direct attention to the spark generator.

Should a gas valve fail the diagnostics will indicate that it is
valve 1 or 2 that is at fault. If the boiler has a gas line of 2
double solenoids the diagnostics will indicate which solenoid
of the double solenoid is at fault.

The last fault instruction will be retained.

FAULT CODES

Fault codes numbered 1 to 24 are displayed where
applicable.  In this event contact 

Caradon Ideal Limited.

Содержание Concord CXSD 40/H

Страница 1: ......

Страница 2: ...is greater than 75 o C Boiler thermostat The boiler thermostat hysteresis is a maximum of 3 o C Table 1 Performance Data Boiler CXSD40 H CXSD50 H CXSD60 H CXSD70 H CXSD80 H CXSD90 H CXSD100 H CXSD110...

Страница 3: ...rectly could lead to prosecution It is in your own interest and that of safety to ensure that the law is complied with The Concord CXSD 40 H 120 H range of boilers has been tested and certified by Bri...

Страница 4: ...ication of lockout and overheat conditions Outside Sensor This kit provides a sensor for temperature compensation when the outside temperature changes DUTY The range of boilers is suitable for Combine...

Страница 5: ...e that its temperature does not exceed 65 0 C 150 0 F MULTIPLE BOILER INSTALLATIONS The minimum installation clearances must conform to the dimensions given below CXSD 40 H 50 H 60 H 70 H 80 H Clearan...

Страница 6: ...s the system being served The vertical distance between the pump s and any cold feed and expansion cistern MUST comply with the pump manufacturers requirements in order to avoid cavitation These requi...

Страница 7: ...Water Supply Model Water Bye laws Manufacturers notes must not be taken in any way as overriding statutory obligations The appliance must be installed in a room separated from living rooms and provid...

Страница 8: ...steel rigid or flexible flue liner grade 304 316 may be used in conjunction with a 50 mm minimum thick layer of vemiculite or perlite granules between the liner and the inner skin of the chimney body...

Страница 9: ...ction alignment rings O rings 5 End section 6 Gas cock 7 Drain cock 8 NOx duct 9 Front plate 10 Burner manifold assy 11 Base plate 12 Combustion chamber 13 Section bolt 14 Distribution tube 15 Tie rod...

Страница 10: ...od screws securing the front cross member on the packaging base 7 Remove the gas cock by unscrewing the union and screw in the handling bars into the 2 front tappings Protect the exposed inlet gas uni...

Страница 11: ...5 2 Fit the 1 tapped flange to the other lower rear connection using the gasket and M10 x 25mm screws and washers provided 3 Temporarily screw the 2 handling bars 2 pipe into the top tappings and mano...

Страница 12: ...e of the boiler 2 Table 2 gives details of the inlet connection size and the minimum working pressures 12 CASING ASSEMBLY 1 Unpack the control box from its carton and release the temperature sensing p...

Страница 13: ...stat capillary through the cable clips as shown Ensure the phial is correctly seated in the correct pocket opposite side to the flow connection Refer to Frame 9 Secure with the split pin provided 8 Ro...

Страница 14: ...be fitted in place of the flow switch but the control will not be able to analyse the faulty flow switch if such a failure should occur Either of the above must be fitted or the boiler will not opera...

Страница 15: ...un all zones MUST individually be able to satisfy the conditions in the foregoing paragraph If not all zones can do this then consider other means of control detailed on other sheets Normal operation...

Страница 16: ...en Zone 1 valve via the normally open contacts of the relay 17 ZONES WITH INDIVIDUALLY PUMPED ZONES 3 zones shown IMPORTANT Terminal L2 may control the appropriate pump s directly provided that the to...

Страница 17: ...nds to indicate the boiler status The boiler will commence its ignition sequence 5 The boiler should light initially at low rate for a period of approximately 30 seconds before proceeding to maximum r...

Страница 18: ...SD H 3 It is essential to adjust the maximum setting first 4 Adjust the system controls to ensure that the boiler will operate at high rate for a reasonable period then remove the dust cover and adjus...

Страница 19: ...lve and using a suitable spanner set the burner pressure adjuster 7 to the value given in Table 8 Refit the electrical plug and secure with the screw Remove the dust cover from the adjuster 11 on the...

Страница 20: ...n the microprocessors will identify the fault area and display a suitable message on the display Further to these accessible features there are other features present in the system which the installer...

Страница 21: ...Installation Servicing INSTALLATION 28 DESCRIPTION AND OPERATION OF BOILER CONTROLS continued The diagram below shows the sequence of steps to be taken when reading the instructions on the following p...

Страница 22: ...or 24 hour If the Programme Hours option is selected the boiler will go on and off subject to the times programmed If ALL DAY usage is selected the boiler will come on at the first ON period selected...

Страница 23: ...ails procedure should be followed but the NO button pressed PROGRAMME HOURS Enables a user timed programme to be entered The following display will be available with the hours 06 flashing Using the UP...

Страница 24: ...ready reference IMPORTANT Point out to the owner that the boiler must have regular maintenance and cleaning at least annually in order to ensure reliable and efficient operation Regular attention wil...

Страница 25: ...se order Refit the cleanout cover NOx duct and casing panels CXSD 120 H boiler only Refit collector hood baffles within collector hood using M5 securing screws TESTING AFTER SERVICING After re assembl...

Страница 26: ...es as described in Frames 22 and 23 or 24 1 Remove the NOx duct and burner front plate as previously described in Frame 35 and 36 2 On the CXSD 40 H 50 H 60 H remove the screws holding the HT heat shi...

Страница 27: ...heat thermostat 14 Detection electrode assembly PTP Pressure test point 42 OVERHEAT THERMOSTAT 1 Remove the split pin from the overheat thermostat pocket and remove the phial 2 Unclip the capillary fr...

Страница 28: ...trol box Release the connector box plug Frame 43 4 Replace the sensor and reassemble in reverse order Ensure that the lead is rerouted along the casing in the clips provided and check that the sensor...

Страница 29: ...ommend that for your own comfort and to comply with good working practise the procedure described below is followed IMPORTANT Turn OFF the gas and DISCONNECT the electricity supply To replace the insu...

Страница 30: ...gas supplier and local authority TOOLS REQUIRED z Spanners z Torque wrench z Pozi screwdriver z Mallet ASSEMBLY The combustion chamber should be positioned as near as possible to the installation sit...

Страница 31: ...nted systems a hydraulic test should be carried out at 1 1 2 times the design pressure given in Table 2 for a period of 30 minutes 12 On a pressurised system the test should be at twice the design pre...

Страница 32: ...e heating load and ensure efficient boiler operation The gas valves operate on High Low and Off principle At start up with the flow temperature less than 55 0 C the boiler will start at low rate and a...

Страница 33: ...FAULT FINDING FAULT FINDING FAULT FINDING 52 SIMPLE FLOW CHART OF OPERATION SHUTDOWN DELAY IGNITION LOW RATE HIGH RATE Prepurge completed Flame ON PUMP OVERRUN IF 75 C OFF 75 C Temp set point Flame O...

Страница 34: ...R T O I D E A L B O I L E R S Is there a spark NO DOWNDRAUGHT FAULT Check flue system Wait 15 mins Does boiler fire Replace TTB Refer to screens Check gas pressure Press Copy Check wiring Press Copy R...

Страница 35: ...ze 5 5mm CXSD110 H 3 157 904 Size 5 6mm CXSD120 H 3 154 840 29 Gas control valves HONEYWELL VR4605PB 2003 CXSD 40 120 H 1 111 867 HONEYWELL VR4605AB 1019 CXSD 100 120 H 1 111 869 29 7 Gas control valv...

Страница 36: ...157 480 CXSD 60 H 1 157 481 CXSD 70 H 1 157 482 CXSD 80 H 1 157 483 CXSD 90 100 H 1 157 484 CXSD 110 120 H 1 157 485 Key No Description Qty Product No SHORT LIST OF PARTS Ideal Boilers P O Box 103 Na...

Отзывы: