Classic
Slimline FF
-
Installation & Servicing
13
INSTALLATION
Flue length
for rear
Flue length for side
Jacking screw for
boiler alignment
1. Unpack the boiler.
2. Remove the casing as follows and place to one side
to avoid damage.
a. Undo the 2 casing retaining screws (a) retaining
the casing to the back panel.
b. Swing the bottom of the boiler casing up until the
controls pod casing has cleared the controls then
unhook the top from the back panel.
3. Remove the boiler from its packaging base. The
boiler may now be stood upright on its controls
support protection frame to ease handling and
installation.
4. Unpack the boiler terminal box and, if applicable, the
extension flue box(es).
9
PACKAGING AND CASING REMOVAL
SIDE FLUE
INSTALLATION
REAR FLUE
INSTALLATION
FLUE KITS
Pack B: supplied as standard.
Pack D: optional extension kit for side flue or rear
flue outlet. Refer to 'Flue Extension Ducts'
A maximum of 1 extension duct (plus the
standard flue duct) may be used together.
Note:
The total length must not exceed 1 metre.
It is MOST IMPORTANT that the boiler is installed
in a vertical position.
(a) Casing retaining
screws, 2 off
Packing base
Controls pod casing
10 DETERMINING THE FLUE LENGTH
Flue length mm
Accessories
Product No.
Up to 600
B Pack 1 off
150308
600 to 1000
B Pack 1 off + D Pack 1 off
153883
INST
ALLA
TION
Содержание Classic FF 360
Страница 1: ......
Страница 39: ...Classic Slimline FF Installation Servicing 39 NOTES...