4
BACK PANEL
Figure
2.
1. INPUT STUDS: For DC power source connection up to 180A peak and 150A
continuous.
2. OUTPUT TERMINAL BLOCK 10 – 12: For DC load connections up to 40A each pair.
3. LAN PORT: For remote monitoring via TCP/IP network.
4. ALARM CONNECTOR: For external alarm circuit to monitor unit fault.
5. CHASSIS GROUND STUD: For Earth ground connection.
6. OUTPUT TERMINAL BLOCK 1 – 9: For DC load connections up to 25A each pair.
INSTALLATION
1. Inspect panel and accessories to make sure everything is complete and in good condition.
2. For rack set up, install panel on the rack using appropriate size screws and star washers on all four
mounting holes. If equipment rack is not electrically connected to Earth ground, connect a ground
cable from the ground stud on the back of the panel to a known Earth ground point. Otherwise, the
four mounting screws and washers may be sufficient for earth ground connection.
OR
For non-rack set up, connect a ground cable from the ground stud on the back of the panel to a
known Earth ground point.
3. Remove the plastic shield(s) covering the output terminal block(s) located on the back of the panel.
Connect the positive of the load to the positive terminal point (labeled “+”) and the negative of the load
to the negative terminal point (labeled “-”).