Control and maintenance
12
Service Unit iMAT 33
Control unit with cord
packing
(previous version)
Control unit without
cord packing
(current version)
Prior to placing a previous version of the control
unit with cord packing (24) in the lower part of the
cover, the sealing mat (11) must be removed from
the service unit.
Installation of the control unit on the iMAT:
1.
Check whether or not the service unit (9) goes
with the control unit (1) (model designation and
colour of the arresting hook).
2.
Check whether or not the sealing mat (8) and
the contact springs (28) are clean, dry, and free
from impurities.
3.
Introduce the sensor (5) into the service unit (9).
4.
Hang the hook (29) of the control unit (1) in the
service unit (9).
5.
Press the control unit (1) against the service
unit (9) and snap into place.
Start-up subsequent to maintenance measures:
Always carry out prior to the start-up:
• Leak test of the screwed connector of the
condensate receiver tank and of the connection
of this tank to the service unit
• Check of the electrical connections
• Check of the correct engagement of the control
unit
Pos : 29 /---- Seitenumbr uch ---- @ 0\mod_1157028099015_0.doc x @ 15320 @ @ 1
Содержание Service Unit iMAT 33
Страница 2: ...2 Service Unit iMAT 33...