2
When spraying the dispensing unit for the first time or when starting a new kit, it is recommended to trigger the gun only 1/2 to 3/4 open, until the desired output is
achieved. This controllable metering ability is a major advantage of this dispensing unit. It allows the user complete control of the flow rate that best fits the application.
Instructions for Use
1.
Shake each cylinder for 1–2 minutes be fore
use to ensure proper mixing. Chemical should
be be tween 70˚- 85˚F (21˚-29˚C). See TDS
for formula specific shaking and temperature
recommendations.
2.
Chemical should be be tween 70˚- 85˚F (21˚-
29˚C).
See TDS for specific temperature
recommendations. Open kit. Remove nozzle packet
and read operating instructions. Thread red coded
hose to A component cylinder and tighten with
supplied 9/16” wrench. Thread black coded hose
to B component cylinder and tighten.
3.
With cylinder upright, open cylinder valves
completely. Cylinder valves must be upright
during use. DO NOT remove the cylinder from
the box after connecting the hoses.
Keep the lid closed and avoid direct sunlight.
SET-UP PROCEDURE
There are two cylinders per system. The system is comprised of an “A” cylinder and a “B” cylinder. These two cylinders must have matching fill dates to be used
together. The cylinders can only be used in the upright position (Never open the valves unless the cylinders are upright). The lids on the boxes are designed to
shield the cylinders from direct sunlight and keep the product from getting too hot. For this reason, the box lid should remain closed during use.
For best results, all surfaces to be bonded must be clean, dry and free from dirt, dust, oil, loose paint, wax or grease, etc. The temperature of the adhesive
should be between 70˚- 85˚F (21˚-29˚C). The surfaces being bonded should be at 40˚F (4˚C) or above for CR-20. The surfaces being bonded should be at 30˚F
(6˚C) or above for Board-Max. Temperatures outside this range may affect bonding range, dispensability and performance of the product. For specific product
information, see TDS (available at www.icpadhesives.com).
Application Temperature
4. Open the valves completely by
turning the valves COUNTER CLOCKWISE.
Top flap may be re moved or left in place
during use or storage.
2. Push in top of front panel to open.
Pull down flap for dispensing unit
hose assembly. Remove nozzle
packet and read instructions.
3. Open top flap of box to ex pose
cylinder valves. Extend attached
dispensing unit hose assembly.
1. Shake kit for 1–2 minutes be fore use
to ensure proper mixing.
Single Package Two-Component Model
Initial Prep
70
21
85
29
Wear protective glasses with sideshields or goggles, nitrile gloves, and
clothing that protects against dermal exposure. Recommend using in a well venti-
lated area with certified respiratory protection or a powered air purifying respirator
(PAPR). See SDS (available at www.icpadhesives.com).
Typically chemical should be be tween
70–85°F (21–29°C). See TDS for for-
mula specific shaking and temperature
recommendations.
Dual Package Two-Component Model