background image

Exposure to these substances: 
a. 

Permanent wave chemicals for hair; 

b. 

Chlorinated waxes and cleaners; 

c. 

Chlorine based swimming pool chemicals; 

d. 

Water softening chemicals; 

e. 

De-icing salts or chemicals; 

f. Carbon 

tetrachloride; 

g. 

Halogen type refrigerants; 

 

7

h. 

Cleaning solvents (such as perchloroethylene); 

i. 

Printing inks, paint removers, varnishes, etc.; 

j. Hydrochloric 

acid; 

k. Solvent 

based 

glue; 

l. 

Antistatic fabric softeners for clothes dryers; 

m.  Acid based masonry cleaning materials. 

 

1.5.3)  Ducted outdoor combustion air 

 

Outdoor combustion air kit – chimney venting 

 

The following kits have been certified for use with the appliance. The 
component kits contain an important safety feature, namely a Vacuum 
Relief Valve or VRV. During normal operation the burner aspirates 
outdoor air. If the intake terminal ever becomes partially or fully 
blocked from ice or snow etc., the VRV will open to allow a proportion 
of air from the dwelling to enter the burner, thus maintaining proper 
combustion. Once the blockage is removed, the VRV will close and 
the burner will draw all the air from the outside again: 

 

CAS-2B

 

Components for the Beckett AFG burner (except air duct): The kit 
includes the intake terminal, vacuum relief valve (VRV) and

 

special air 

boot connection with integral air adjustment means for the

 

AFG 

burner. The CAS-2B can be used with a 10 cm (4") galvanized air duct 
or a 10 cm (4") flexible aluminium air duct. It is recommended that the 
metallic air ducting material be insulated from the air intake  up  to     
1.5 m (5') from the burner to avoid condensation from forming on the 
outside of the intake pipe.  

 

CAD-1  

Air duct kit consists of 7.6 m (25') of insulated UL/ULC Listed Class 1 
air duct, and two 10 cm (4") steel band clamps. The duct incorporates 
a corrugated flexible aluminium core, surrounded by fibreglass 
insulation covered with a vinyl vapour barrier. 
 

CAUTION 

The CAS-2B does not turn the furnace installation into a 
direct vent system. Therefore the building structure 
must provide for adequate combustion air to be 
delivered 

to the Vacuum Relief Valve. 

The burner will 

need to draw combustion air from the VRV’s 
surroundings if the intake ever becomes blocked. 
Therefore, non-direct vent installation codes must be 
followed. 

 
Comprehensive installation instructions are provided with the kits. 
 

1.6) 

OIL TANKS AND LINES 

 

Check your local codes for the installation of the tank and accessories. 

 

A manual shut-off valve and an oil filter shall be installed in sequence 
from tank to burner. Be sure that the oil line is clean before connecting 
to the burner. The oil line should be protected to eliminate any 
possible damage. Installations where the fuel oil tank is below the 
burner level must employ a two pipe fuel supply system with an 
appropriate fuel pump. A rise of more than 2.4 m (8') requires a 2 
stage pump and more than 4.9 m (16') an auxiliary pump. 

Follow the pump instructions to determine the size of tubing you need 
in relation to the rise, or to the horizontal distance.  

 

Inspect the entire oil distribution system for leaks at the beginning of 
each annual heating season. 
 

1.7) BURNER 

INSTALLATION 

 

FIGURE 2 

Ceramic sleeve installation (Riello burner only) 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

DNS-0830 REV. B

Installing the burner 
 

a.  Verify tube insertion dimensions in the Technical Specification 

Tables 3.1 to 3.4, p. 15 to 18. 

b.  The warm air furnace burner mounting plate has a 4-bolt 

configuration; 

c.  Position the mounting gasket between the mounting flange and 

the appliance burner mounting plate. Line up the holes in the 
mounting flange with the studs on the appliance mounting plate 
and securely bolt in place. 

 

After the burner is mounted 
 

a. Remove 

drawer 

assembly; 

b. 

Install nozzle (see specifications); 

c. Check 

electrode 

settings; 

d. 

Make the electrical connections; 

e. 

Complete oil line connections. 

 

CAUTION 

Do not turn on the burner until you have checked the 
polarity. 

 

445 01 4054 06

Содержание FLO115DABR-C

Страница 1: ...5DABR D OLF140C12C OLR182A16C D N S 0 5 9 4 R v A D N S 0 6 6 5 R v A D N S 0 5 7 5 R v A Manufactured by UTC Canada Corporation ICP Division 3400 Industrial Boulevard Sherbrooke Quebec Canada J1L 1V8...

Страница 2: ...ician familiar with safety procedures and equipped with the proper tools and test instruments Failure to carefully read and follow all instructions in this manual can result in death and or personal i...

Страница 3: ...mber Normal servicing of this unit does not require cleaning of the combustion chamber Use extreme care if for any reason you have to work in the area of the combustion chamber 1 2 2 Freezing temperat...

Страница 4: ...r size and adequate chimney base temperature as specified in the Installation Code The relevant excerpt from the code is found in this section Use it as a guide when local or national codes do not exi...

Страница 5: ...o provide adequate combustion and ventilation air can result in death and or personal injury 1 5 1 General Oil furnaces must have an adequate supply of combustion air It is common practice to assume t...

Страница 6: ...vinyl vapour barrier CAUTION The CAS 2B does not turn the furnace installation into a direct vent system Therefore the building structure must provide for adequate combustion air to be delivered to t...

Страница 7: ...heat exchanger warranty intact WARNING Fire and explosion hazard Use only approved heating type oil in this furnace DO NOT USE waste oil used motor oil gasoline or kerosene Use of these will result in...

Страница 8: ...here the furnace is located Install the air conditioning cooling coil evaporator downstream from the supply air plenum of the furnace If a separate evaporator and blower unit is used install appropria...

Страница 9: ...off the disconnect switch and CALL A QUALIFIED SERVICE TECHNICIAN CAUTION Do not attempt to start the burner when excess oil has accumulated when the furnace is full of vapour or when the combustion c...

Страница 10: ...nd blower regulator Modification of the FAN ON and HI Limit settings on the Fan Limit and blower regulator can cause a malfunction of the furnace and carry to premature wear of the heat exchanger CAUT...

Страница 11: ...inder with a stiff brush and vacuum cleaner 7 The heat exchanger and combustion chamber should be inspected to determine if replacement is required before re assembling the unit 8 After cleaning repla...

Страница 12: ...ntion head 3 1 5 Nozzle Replace the nozzle with the one specified in Tables 3 1 to 3 4 p 15 to 18 3 1 6 Oil filter Tank filter The tank filter should be replaced as required Secondary filter The 10 mi...

Страница 13: ...e Day Night Dealer name and address START UP TEST RESULTS Nozzle Pressure Lb psi Burner adjustments Primary air Fine air Draw Assembly CO2 Smoke scale Bacharach Gross stack temperature F Ambient tempe...

Страница 14: ...5 1 2 75 2 3 75 AERO BURNER 1725 RPM Nozzle 100 PSIG pump pressure Delavan 0 65 70W 0 75 70W 0 85 70W Volts Hertz Phase Operating voltage range Rated voltage Amps Minimum ampacity for wiring sizing Ma...

Страница 15: ...Nozzle Delavan 060 60W 075 60W 0 85 60W 0 85 60W Pump pressure PSIG 155 130 140 170 Combustion air adjustment turbulator damper 2 3 25 2 5 4 2 2 5 3 2 5 AERO BURNER 1725 RPM Nozzle 100 PSIG pump press...

Страница 16: ...6 6 RIELLO BURNER MODEL 40 Nozzle Delavan 0 85 60W 0 85 60W 1 00 60W 1 10 60W Pump pressure PSIG 140 170 145 140 Combustion air adjustment turbulator damper 2 5 2 5 3 2 75 3 3 3 5 3 25 AERO BURNER 172...

Страница 17: ...er 1 5 2 75 2 5 3 25 3 4 25 AERO BURNER 1725 RPM Nozzle 100 PSIG pump pressure Delavan 0 75 70W 0 85 70W 1 00 70W ELECTRICAL SYSTEM Volts Hertz Phase Operating voltage range Rated voltage Amps Minimum...

Страница 18: ...19 DNS 0596 Rev D FIGURE 4 2 Model MBOV115DABR D FIGURE 4 1 Model MBO115DABR D DNS 0590 Rev D 445 01 4054 06...

Страница 19: ...20 FIGURE 4 3 Models LBO125DABR13 D LBO145DABR34 D OLR182A16C FIGURE 4 4 Model FLO115DABR C OLF140C12C DNS 0666 Rev C DNS 0576 Rev F 445 01 4054 06...

Страница 20: ...21 FIGURE 5 Wiring diagram MBO115DABR D MBOV115DABR D LBO125DABR13 D LBO145DABR34 D OLR182A16C FLO115DABR C OLF140C12C DNS 1014 Rev A 445 01 4054 06...

Страница 21: ...22 PARTS LIST Model MBO115DABR D B50040B 445 01 4054 06...

Страница 22: ...B40492 Top rear panel 30 B40032 Gasket smoke outlet 31 B40046 Smoke outlet assembly 32 B40054 01 Baffle assembly 5 required 33 B40043 Plenum divider 34 B40076 Top division panel 35 B40410 Filter rack...

Страница 23: ...PARTS LIST Model MBOV115DABR D B50041B 445 01 4054 06...

Страница 24: ...ntral support rear baffle and item 32 included 32 B01291 02 Seal strip 3 required 33 B40131 02 Left side panel assembly Item 34 included 34 B40125 02 Left side panel insulation 35 L04G005 Bushing 1 3...

Страница 25: ...26 PARTS LIST Model LBO125DABR13 D B50038C 445 01 4054 06...

Страница 26: ...32 B40032 Gasket smoke outlet 33 B40046 Smoke outlet assembly 34 B40071 Inlet baffle 2 required 35 B40043 Plenum divider 36 B40054 01 Baffle assembly 5 required 37 B40108 Division panel assembly Centr...

Страница 27: ...PARTS LIST Models LBO145DABR34 D OLR182A16C B50039F 445 01 4054 06...

Страница 28: ...B40107 01 Blower door assembly Item 29 included 29 Z99F050 Door handle 30 B40497 Top rear panel 31 B40031 Gasket smoke outlet 32 B40047 Smoke outlet 33 B40054 02 Baffle assembly 7 required 34 B40043...

Страница 29: ...PARTS LIST Model FLO115DABR C OLF140C12C B50042A 445 01 4054 06...

Страница 30: ...rack 29 Z04F004 Paper filter 20 x 20 x 1 1 required 30 B40381 Blower door assembly Item 31 included 31 Z99F050 Acces door 32 B40356 Top back panel assembly 33 Z04F001 Paper filter 10 x 20 x 1 1 requir...

Отзывы: