background image

!"

,IWKHVXUIDFHOHYHOLVZLWKLQWKHGHDG]RQHWKH581LQGLFDWRU/('ÀDVKHVTXLFNO\WKHVHWWLQJPRGHLV

!"#$%&'!"()%$$"(%'!"*+)'&(),%**)-")%&'.."//%-*")0&!%*)!1")*"2"*)*"'2"/)!1")("'()34&"5
67)&4)-0!!4&)%/)8#"//"()%&)!1")/"!!%&9)$4("),%!1%&):;)/<)!1")$"'/0#"$"&!)$4(")47)!1")*"2"*)$"!"#),%**)-")

#"/!4#"(5)=1")&",*+)/"!)2'*0"/),%**)&4!)-")/'2"(5

!"##$%&'()'*$+,(%%",#"*'(-#.-#

'UDLQWKHWDQNWRWKHORZHUPHDVXUHGVXUIDFHOHYHO

2SHQWKHVHQVRURXWSXWE\SODFLQJWKHPDJQHWLFSHQWRWKH2))VHQVLWLYHDUHDIRUDWOHDVW

V7KH67$7(LQGLFDWRU/('ÀDVKHROGWKHPDJQHWLFSHQRQWKH2))ÀDWDUHDIRU

DWOHDVWDGGLWLRQDOVWRFRQ¿UPWKHVHWYDOXHDQGVWRUHLWLQWKHLQWHUQDOPHPRU\RIWKHOHYHO

PHWHU7KH67$7(LQGLFDWRU/('EULHÀ\ÀDVKHVWKUHHWLPHV

$Q\RWKHUVHWWLQJLVSRVVLEOHVDIWHUWKHPDJQHWLFSHQLVUHPRYHGIURPWKHVHQVLWLYHDUHD

!"##$%&'()',(%%",#"*'(-#.-#

)LOOWKHWDQNXSWRWKHXSSHUPHDVXUHGVXUIDFHOHYHO

&ORVHGWKHVHQVRURXWSXWE\SODFLQJWKHPDJQHWLFSHQWRWKH21VHQVLWLYHDUHDIRUDWOHDVW

V7KH67$7(LQGLFDWRU/('ÀDVKHVROGWKHPDJQHWLFSHQRQWKH21ÀDWDUHDIRU

DWOHDVWDGGLWLRQDOVWRFRQ¿UPWKHVHWYDOXHDQGVWRUHLWLQWKHLQWHUQDOPHPRU\RIWKHOHYHO

PHWHU7KH67$7(LQGLFDWRU/('EULHÀ\ÀDVKHVWKUHHWLPHV

$Q\RWKHUVHWWLQJLVSRVVLEOHVDIWHUWKHPDJQHWLFSHQLVUHPRYHGIURPWKHVHQVLWLYHDUHD

/0,#(12'*")0-3#'+"##$%&+

'LVFRQQHFWWKHVHQVRUIURPVXSSO\YROWDJHHJE\GLVFRQQHFWLQJWKHFRQQHFWRU

:KLOHWKHUHLVQRVXSSO\YROWDJHSODFHWKHPDJQHWLFSHQRQRQHRIWKHVHQVLWLYHDUHDV

&RQQHFWVXSSO\YROWDJHDQGNHHSWKHPDJQHWLFSHQLQSRVLWLRQ

:DLWDSSUR[VIRUVKRUWÀDVKHVRIWKH\HOORZ67$7(LQGLFDWRU/('$IWHUWKDWUHOHDVHERWK

EXWWRQV

1RZWKHOHYHOPHWHULVUHVWRUHGLQWRIDFWRU\GHIDXOWVHWWLQJV6HHWKHWDEOHRQSDJH

!"#"#"#

$

%&''()*$+,()*

$

-$.-*)&'(/$0&)$

YHUVLRQ³0´

!"

123&$4$!"#$%&'($)*+)*(,-&.(*-&(/012/)/(#&3&#(2%(&1"&&'&'4

,QPRGH&VHWWKHRSHQVWDWXVZKHQWKHWDQNLV¿OOHGXSWRWKHXSSHUPHDVXUHGVXUIDFHOHYHODQG

WKHFORVHGVWDWXVZKHQWKHWDQNLVGUDLQHGWRWKHORZHUPHDVXUHGVXUIDFHOHYHO

$" %&'(#)

$

$!$+&.($)*+)*(,-&.(*-&(/012/)/(#&3&#(2%(&1"&&'&'4

Содержание Level Pro UltraPro 500 Series

Страница 1: ...R Ultrasonic level meters ULTRAPRO 500 MANUAL UltraPro 500 INSTRUCTION MANUAL...

Страница 2: ...on and putting into operation 6 8 Installation instructions 7 9 Electrical connection 10 10 Set up elements 14 11 Status signalization 15 12 Setting up 16 12 1 Setting procedure for level meters UPS 5...

Страница 3: ...ent or may cause injuries to persons The UPS 500 or UPS 700 device is packed in a cardboard packaging and the whole shipment is placed in a cardboard box The cardboard box is suitably filled to preven...

Страница 4: ...e suitable for continuous or limit measurement of the level of liquids waste water sludge suspensions adhesives resins in various open and closed vessels sumps open channels and drains Applicability f...

Страница 5: ...procon com 905 469 9283 6 DIMENSIONAL DRAWINGS ground terminal UPS_ 53_ 02 _ UPS_ 53_ 06 _ UPS_ 53_ 10 _ UPS_ 53_ 20 _ Al alloy UPS_ 53_ 01 _ 7 INSTALLATION AND PUTTING INTO OPERATION This procedure i...

Страница 6: ...ed in Fig 3 c When installing in an open channel sump drain etc install the device onto a console as close as possible to the expected maximum level d The reference plane for the measurement is the lo...

Страница 7: ...he site for installing the level meter needs to be chosen so that the emitted acoustic signal is not affected by nearby objects reinforcements supports brackets ladders heating elements mixers etc The...

Страница 8: ...e or unreliable operation of the device Fig 10 p False surface reflections of the ultrasonic signal and unreliable operation of the device might result from the mixer s rotating blades that ripple the...

Страница 9: ...a suitable screwdriver 2 Remove the inner part of the connector using a flat screwdriver insert the screwdriver in the gap marked with an arrow 3 Unscrew the cable gland and pull the supply cable ins...

Страница 10: ...connector pin 4 or the black cable wire The ULM level meter or ULS level sensor with a C type cable gland are connected to processing display units by means of a cable with an outer diameter of 4 to...

Страница 11: ...tive supply pole U is connected to the brown wire of the connected cable the negative pole is connected to the blue wire of the connected cable Output voltage is connected to the black wire of the cab...

Страница 12: ...iagram of the ULS sensor type with S output switch 4 mA two state current 20 mA Fig 28 Connection diagram of the ULS sensor with P type output PNP with an open collector Wiring operations shall only b...

Страница 13: ...0 12 3 4356 7 89 2 12 3 4356 7 8 5 5 7 76 35 76 A3 7 5B3 C 57 D 2E0 F 3 3G 67 6 11 3 3G 67 6 12 3 4356 7 89 2 12 3 4356 7 8 5 5 7 76 35 76 A3 7 5B3 C 57 D 0 1 EXWWRQ IRU 614 RU IRU 814 RSHQ WKH VHWWLQ...

Страница 14: ...VW RIWHQ LQ LWV GHIDXOW PRGH IRU OHYHO PHDVXUHPHQW LJ DQG RQO UDUHO LQ WKH LQYHUVH PRGH 7KH PDQXDO GHYLFH VKDOO EH VHW XS DIWHU LQVWDOODWLRQ XVLQJ WKH 2 1 DQG 83 EXWWRQV IRU YHUVLRQ 7 RU E DSSO LQJ WK...

Страница 15: ...W WKH YDOXH WR P 9 GLUHFWO Q WKDW FDVH RX FDQ VNLS VWHS 3UHVV WKH 2 1 DQG 83 EXWWRQV WR DFFXUDWHO VHW DQ YDOXH LQ LQGLYLGXDO LQFUHPHQWV KROG WKH UHOHYDQW EXWWRQ WR LQFUHDVH WKH DGMXVWPHQW VWHS JUDGXDO...

Страница 16: ...W OHDVW V 7KH 67 7 LQGLFDWRU DVKHV VORZO ROG WKH PDJ QHWLF SHQ RQ WKH DW DUHD IRU DW OHDVW DGGLWLRQDO V WR FRQ UP WKH VHW YDOXH DQG VWRUH LW LQ WKH LQWHUQDO PHPRU RI WKH OHYHO PHWHU 7KH 67 7 LQGLFDWRU...

Страница 17: ...OHDVW V WR FRQ UP WKH VHW YDOXHV Q RWKHU VHWWLQJ LV SRVVLEOH V DIWHU WKH EXWWRQ LV UHOHDVHG EXWWRQV DUH UHOHDVHG 01 23 1 7KH 836 VHQVRU FDQ ZRUN LQ WZR PRGHV 01 2 1 3 453 3 6 5 4 WKH VHQVRU RXWSXW LV...

Страница 18: ...ODFLQJ WKH PDJQHWLF SHQ WR WKH 21 VHQVLWLYH DUHD IRU DW OHDVW V 7KH 67 7 LQGLFDWRU DVKHV TXLFNO ROG WKH PDJQHWLF SHQ RQ WKH 21 DW DUHD IRU DW OHDVW DGGLWLRQDO V WR FRQ UP WKH VHW YDOXH DQG VWRUH LW LQ...

Страница 19: ......

Отзывы: