8
STEP 4
I. Fit the L/R Swing tube (24 L/R) to the Long axle (52) on the Handlebar post (46) with Allen bolt (10), Spring
washer (11), Flat washer (56), D-shape washer (9), and Waved washers (35);
II. Attach the L/R Pedal tube Joint (39 L/R) to the L/R Crank (41L/R) with Allen bolt (10), Spring washer (11) , Flat
washer (56), D-shape washer (9), and Waved washers (35);
Note: Don’t tighten the above Bolts till complete this assembly.
III. Joint L/R swing tube (24 L/R) & Pedal support (15L/R) with the Hex bolt (18), Flat washer (5) ,Flat washer (51)
and Nylon nut (6) .Secured the above Bolts (10), Hex bolt (18) and Nylon nut (6);
IV. Fit the L/R Handlebar (28L/R) to the L/R Swing tube (24L/R) with the Carriage bolt (36), Arc washer (20) and
Nylon nut (13) as show.
Содержание NordicTrack E 300
Страница 20: ...20 EXPLODED DRAWING...
Страница 21: ...21 EXPLODED DRAWING...