TABLE OF CONTENTS
1
1
GENERAL .................................................................................................................................................. 2
2
GENERAL WARNINGS............................................................................................................................. 3
3
TECHNICAL SPECIFICATIONS ............................................................................................................... 4
3.1
MONOLITE 45 GT – 350 GT............................................................................................................................... 4
3.2
MONOLITE 30 JB - 670 JB ................................................................................................................................. 6
4
INSTALLATION ......................................................................................................................................... 9
4.1
HEATING SYSTEM............................................................................................................................................. 9
4.1.1
Boiler room .................................................................................................................................................. 9
4.2
FLUE ................................................................................................................................................................... 9
4.2.1
Condensate drain ........................................................................................................................................ 9
4.3
WATER CONNECTIONS.................................................................................................................................... 9
4.3.1
Sealed hot water heating system with expansion vessel ........................................................................... 10
4.4
ELECTRICAL CONNECTION ........................................................................................................................... 12
4.5
OPTIONAL CONTROL PANEL ......................................................................................................................... 12
4.6
STARTING ........................................................................................................................................................ 12
4.7
INVERTING THE DOOR APERTURE (MOD. 45 GT/125 GT).......................................................................... 13
4.8
INVERTING THE DOOR APERTURE (mod. 160 GT/JB - 350 GT/670 JB)...................................................... 13
4.9
PRESSURISED BOILER CONNECTION ......................................................................................................... 14
4.10
WIRING DIAGRAM ........................................................................................................................................... 14
5
FITTING THE BOILER CASING.............................................................................................................. 15
5.1
BOILER BODY INSULATION (Fig. 4-5-6)......................................................................................................... 15
5.2
BOILER CASING MOD. 45 GT/125 GT – 30 JB/125 JB (Fig. 4)....................................................................... 15
5.3
BOILER CASING mod. 160 GT/JB-270 GT/JB (Fig. 5)..................................................................................... 16
5.4
BOILER COVERING mod. 350 GT/JB-670 JB (Fig. 6) ..................................................................................... 17
6
STARTING ............................................................................................................................................... 18
6.1
PRELIMINARY CHECKS .................................................................................................................................. 18
6.2
WATER TREATMENT ...................................................................................................................................... 18
6.3
FILLING THE SYSTEM..................................................................................................................................... 18
7
OPERATION ............................................................................................................................................ 19
7.1
OPERATION CHECKS ..................................................................................................................................... 19
7.2
TEMPORARY BOILER STOP........................................................................................................................... 19
7.3
PROLONGED BOILER STOP .......................................................................................................................... 19
7.4
PERIODICAL USER CHECKS.......................................................................................................................... 19
7.5
MAINTENANCE AND CLEANING .................................................................................................................... 19
Содержание MONOLITE JB Series
Страница 2: ......
Страница 12: ...MONOLITE 10 4 3 1 SEALED HOT WATER HEATING SYSTEM WITH EXPANSION VESSEL Mod 45 125 Mod 160 270...
Страница 23: ......