Version 1.1 2021 IC-IC2B1-01 Copyright by Cy-Tech GmbH 2021 | www.indoorcycling.com
INITIAL
INSTALLATION CHECKS
6.
Apply lithium grease on the metal threads of all the adjustment knobs.
7.
Verify four (4) allen nuts on RS pulley for tightness. If loose, apply LocTite Threadlocker
Blue-243 and retighten.
8.
Verify R and L crank arm allen bolts for tightness. If loose, apply LocTite Threadlocker
Blue-243 and retighten.
9.
Verify belt tension. Check if belt drive is firmly tightened and does not slip while riding under
resistance load. In case that the belt slips, proceed using the adjustment technique as described
on page (18). Please note that a belt drive gear never shows slack. In case of adjustment do not
apply too much tension.
10.
Wipe down bike frame with rag moistened with solvent free spray lubricant
11.
Some parts of the ICG IC2 may become loose during shipment. Check crank arms, check all
exposed screws, bolts, and nuts, and make sure that they are properly tightened.
Allow a minimum safety distance away from the nearest equipment, objects or walls as
illustrated below.
CUSTOMER SERVICE
1.
Provide basic maintenance instructions to client and direct them to detailed maintenance
instructions (page 14-19 )
2.
Sign-off sheet provided to client to confirm explanation of maintenance procedures/manual
and verification of condition of bikes?
23.6“
(60cm)
23.6“
(60cm)
23.6“
(60cm)
23.6“
(60cm)