Installation
Installation of ceramic
Connect the Angle-valve at the Shut-off valve.
Insert the flange-packing into the flange.
flange-packing
flange
Turn the ceramic over. Place the flange at the bottom of ceramic and insert
the bolts assemble the flange and ceramic with packing nuts.
Lift up the ceramic and fix the flange at a drain.
Set the ceramic at level not to lean when
fixing the flange.
• Ceramic is heavy.
Recommend 2 workers when lifting up the ceramic.
flange
Drain
Bolts
Wax seal
Flange
or
11
10
IMPORTANT NOTE:
Please read through this entire list of instructions and take an inventory of included
parts before beginning installation. If you have any questions at all, please call Customer
Service at 855-444-2372 before you begin your installation.
INSTALLATION STEPS
•
The centerline of the floor drain is to be 12” from finished back wall. Do not
include the thickness of any base board molding when taking this measurement.
•
The centerline of the angle stop (wall valve) is to be 8” above the finished floor
and 6” to the left of the centerline of the floor drain. The angle stop will need
to have a 1/2” MIP thread to connect to the included supply line.
Before unpacking product, ensure that rough-in dimensions are as follows:
VERY IMPORTANT: Follow instructions in order! Connect hoses
and attach seat top to bowl BEFORE putting the down the bowl.
1a.
Screw the 1/2” supply line (included) to the angle stop. Hand tighten only.
1b.
Open the angle stop and allow water to flow into the floor drain for 60 seconds. DO NOT
SKIP THIS STEP! Construction debris in the pipes will clog the unit’s filter. This applies to new
construction as well. Turn off valve and remove supply line when complete.
1a
1b