ELEVATION SERIES CIM CUBERS
GENERAL MAINTENANCE
63
Electrical shock and/or injury from moving parts inside this machine can cause serious injury.
Disconnect electrical supply to machine prior to performing any adjustments or repairs.
Failure to perform the required maintenance at the frequency specified will void warranty coverage
in the event of a related failure.
General Maintenance Procedure
To insure economical, trouble free operation of your machine; it is recommended that the following maintenance be
performed every 6 months.
1. Clean the ice-making section per the instructions below. Cleaning should be performed
a minimum of every 6 months. Local water conditions may require that cleaning be
performed more often.
2. Check ice bridge thickness. See page 10 for proper thickness and adjustment
procedure.
3. Check water level in Sump. See page 10 for proper water level and adjustment
procedure.
4. Clean the condenser (air-cooled machines) to ensure unobstructed air flow.
5. Check for leaks of any kind: water, refrigerant, oil, etc.
6. Check the bin control switch (if applicable) for proper adjustment.
7. Check the Water Regulating Valve (water cooled machine) for proper adjustment by
measuring the discharge pressure which should be adjusted to maintain 250 psi (17.01 bar/
1.723 MPa). Adjust the water regulating valve as required. Water exiting the condenser
should be between
100
°
F (38
°
C) and 110
°
F (43
°
C).
8. Check all electrical connections.
9. Oil the fan motor if the motor has an oil fitting. (Self contained air-cooled models only)
10. Check the water filter (if applicable) and replace if dirty or restricted
11. Inspect the evaporator water distribution tube to insure even distribution of water
across the face of the evaporator.
12. Clean Remote Condenser if applicable.
General Maintenance
Содержание CIM Series
Страница 31: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 29 INITIAL HARVEST CYCLE AT START UP ...
Страница 32: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 30 TRANSITION FROM HARVEST TO FREEZE ...
Страница 33: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 31 BIN FULL CURTAIN OR STAT ...
Страница 35: ...ELEVATION SERIES CIM CUBERS BOARD COMPONENT LED SEQUENCE 33 DIAGNOSTICS IN HARVEST CYCLE ...
Страница 36: ...ELEVATION SERIES CIM CUBERS BUTTON FUNCTIONS 34 Button Functions ...
Страница 77: ...ELEVATION SERIES WIRING DIAGRAM 75 CIM220V 240V 50Hz SINGLE PHASE SINGLE EVAPORATOR REMOTE COOLED UINTS ...
Страница 78: ...ELEVATION SERIES WIRING DIAGRAM 76 CIM 230V 60Hz THREE PHASE SINGLE EVPAORATOR PLATE REMOTE COOLED UNITS ...
Страница 80: ...ELEVATION SERIES WIRING DIAGRAM 78 CIM 220V 240V 50Hz SINGLE PHASE DUAL EVAPORATOR AIR AND WATER COOLED UNITS ...
Страница 81: ...ELEVATION SERIES WIRING DIAGRAM 79 CIM 230V 60Hz THREE PHASE DUAL EVAPORATOR AIR AND WATER COOLED UNITS ...
Страница 82: ...ELEVATION SERIES WIRING DIAGRAM 80 CIM 115V and 230V 60Hz SINGLE PHASE DUAL EVAPORATOR REMOTE COOLED UNITS ...
Страница 83: ...ELEVATION SERIES WIRING DIAGRAM 81 CIM 220V 240V 50Hz SINGLE PHASE DUAL EVAPORATOR REMOTE COOLED UNITS ...
Страница 84: ...ELEVATION SERIES WIRING DIAGRAM 82 CIM 230V 60Hz THREE PHASE DUAL EVAPORATOR REMOTE COOLED UNITS ...