Model Selection

8

FCHU 08

-

E M X X 6 2 B S X

- 01 A G A X 1 P P M F S

Item Number

1

2

3

4 5 6 7 8 9 10 11 12

13 14 15 16 17 18 19 20 21 22 23

Primary Part

Secondary Parts

Valve Package Parts

FCHU Valve Package Nomenclature

Item 13

01

Motorized Valve 
Package

01

-  Line Voltage 2 Way MV* Normally Closed

02

-  Line Voltage 2 Way MV* Normally Open

03

-  Line Voltage 3 Way MV* Normally Closed 

Routing

04

-  Line Voltage 3 Way MV* Normally Closed 

Diverting

05

-  Line Voltage 3 Way MV* Normally Open 

Routing

06

-  Line Voltage 3 Way MV* Normally Open 

Diverting

07

-  Line Voltage 3 Way MV* Normally Closed 

Routing w/ Bypass Pipe

08

-  Line Voltage 3 Way MV* Normally Closed 

Diverting w/ Bypass Pipe

09

-  Line Voltage 3 Way MV* Normally Open 

Routing w/ Bypass Pipe

10

-  Line Voltage 3 Way MV* Normally Open 

Diverting w/ Bypass Pipe

11

-  24V 2 Way MV* Normally Closed

12

-  24V 2 Way MV* Normally Open

13

-  24V 3 Way MV* Normally Closed Routing

14

-  24V 3 Way MV* Normally Closed Diverting

15

-  24V 3 Way MV* Normally Open Routing

16

-  24V 3 Way MV* Normally Open Diverting

17

-  24V 3 Way MV* Normally Closed Routing  

w/ Bypass Pipe

18

-  24V 3 Way MV* Normally Closed Diverting  

w/ Bypass Pipe

19

-  24V 3 Way MV* Normally Open Routing  

w/ Bypass Pipe

20

-  24V 3 Way MV* Normally Open Diverting  

w/ Bypass Pipe

21

-  Wired for 24V MV* control - MV* by others

X

-   None

Item 14

A

Electric Heat

A

- 1   

B

- 1.5   

C

- 2   

D

- 3   

E

- 3.5   

F

- 4.3   

G

- 5   

H

- 6   

I

- 7.5   

J

- 10   

X

- No Electric Heat

Item 15

G

Secondary Drain 
Pan

G

- Galvanized Powder Coated (Custom Color)   

S

- Stainless Steel   

X

- None

Item 16

A

Flow Regulation 
Cooling Coil

A

- Balancing Valve 

B

- Circuit Setter 

C

- Autoflow Valve 0.5 GPM 

D

- Autoflow Valve 1.0 GPM 

E

- Autoflow Valve 1.3 GPM 

F

- Autoflow Valve 1.5 GPM

G

- Autoflow Valve 2.0 GPM 

H

- Autoflow Valve 2.5 GPM 

I

- Autoflow Valve 2.8 GPM

J

- Autoflow Valve 3.0 GPM 

K

- Autoflow Valve 3.3 GPM 

L

- Autoflow Valve 3.5 GPM

M

- Autoflow Valve 4.0 GPM 

N

- Autoflow Valve 4.5 GPM 

O

- Autoflow Valve 5.0 GPM 

P

- Autoflow Valve 5.5 GPM 

Q

- Autoflow Valve 6.0 GPM 

R

- Autoflow Valve 6.5 GPM

S

- Autoflow Valve 7.0 GPM 

T

- Autoflow Valve 7.5 GPM 

U

- Autoflow Valve 8.0 GPM

V

- Autoflow Valve 8.5 GPM 

W

- Autoflow Valve 9.0 GPM 

X

- None

Item 17

X

Flow Regulation 
Heating Coil

X

- Not Applicable

Item 18

1

Y-Strainer

1

- Y-Strainer   

2

- Y-Strainer Blow Down   

X

- None

Item 19

P

Purge Valve

P

- Yes   

X

-No

Item 20

P

PT Ports

P

- Yes   

X

-No

Item 21

M

Air Vents

M

- Manual   

A

- Automatic   

X

- None

Item 22

F

Condensate 
Overflow Switch

F

- Float   

E

- Electronic   

X

- None

Item 23

S

Pipe Connections

S

- Sweat   

M

- Male NPT   

F

- Female NPT   

U

- Unions

* MV = Motorized Valve

7

Содержание FCHC

Страница 1: ...codes and existing practices should be observed and preformed by a professional Due to ICE AIRs ongoing product development programs the information in this document is subject to change without notic...

Страница 2: ...ervice or service procedures If you install or perform service on this unit you assume responsibility for any personal injury or property damage which may result Many jurisdictions require a license t...

Страница 3: ...ctions Units should be installed no closer than 18 apart when two units are side by side A vertical clearance of 60 should be maintained between units 2 Adequate ceiling panel access must exist for ha...

Страница 4: ...l Elec Heat MCO K LH 2 Pipe Cool w Total Elec Heat ACO L LH 2 Pipe Heat Only M RH 4 Pipe Heat and Cool MCO N RH 4 Pipe Heat and Cool ACO O LH 4 Pipe Heat and Cool MCO P LH 4 Pipe Heat and Cool ACO Ite...

Страница 5: ...e Item 16 A Flow Regulation Cooling Coil A Balancing Valve B Circuit Setter C Autoflow Valve 0 5 GPM D Autoflow Valve 1 0 GPM E Autoflow Valve 1 3 GPM F Autoflow Valve 1 5 GPM G Autoflow Valve 2 0 GPM...

Страница 6: ...LH 2 Pipe Cool w Total Elec Heat ACO L LH 2 Pipe Heat Only M RH 4 Pipe Heat and Cool MCO N RH 4 Pipe Heat and Cool ACO O LH 4 Pipe Heat and Cool MCO P LH 4 Pipe Heat and Cool ACO Item 6 X Enclosure X...

Страница 7: ...Way MV Normally Open Diverting 17 24V 3 Way MV Normally Closed Routing w Bypass Pipe 18 24V 3 Way MV Normally Closed Diverting w Bypass Pipe 19 24V 3 Way MV Normally Open Routing w Bypass Pipe 20 24V...

Страница 8: ...ithout interference 7 A minimum obstructed distance of 36 should be kept around theunit IMPORTANT To avoid permanent damage to the unit DO NOT operate during construction in an open space or as a supp...

Страница 9: ...n the unit Piping Installation ICE AIRs Horizontal Concealed Fan Coil is available in either 2 pipe or 4 pipe configurations see below that are connected to the system through the use of a flexible ho...

Страница 10: ...2 Pipe System General Electric Line Voltage Wiring including the electrical ground must comply with the National Electrical Code as well as all applicable local codes Refer to the Electrical Data tab...

Страница 11: ...n motor when present Component Outline Field Wiring Factory Wiring Wire Color Wire Connector Field Connector CLG HTG C SI V Legend BLK CAP Front 3 2 1 6 5 4 9 8 7 12 11 10 1 2 3 4 5 6 7 8 9 10 11 12 M...

Страница 12: ...system with water leaving the air vents open Bleed all air from the system but do not allow the system to over flow Check the system for leaks and make any required repairs 4 Adjust the water and air...

Страница 13: ...leshooting Table Troubleshooting IMPORTANT It is not the intent of this maintenance manual to resolve any problems with the operation of your ICE AIR unit Please contact a trained servicer or building...