background image

Precautions and preparations listed are for general knowledge and to define basic guidelines. Local codes and existing practices should be observed and preformed by a professional. 

Due to ICE AIRs ongoing product development programs, the information in this document is subject to change without notice.

Model Selection

8

FCHC 08

-

E M X X 6 2 A S X

- 22 A G A X 1 P P M F S

Item Number

1

2

3

4 5 6 7 8 9 10 11 12

13 14 15 16 17 18 19 20 21 22 23

Primary Part

Secondary Parts

Valve Package Parts

FCHC Valve Package Nomenclature

Item 13

22

Motorized Valve 
Package

22

-  Line Voltage 2 Way MV* Heat NO, Cool NO

23

-  Line Voltage 2 Way MV* Heat NC, Cool NO

24

-  Line Voltage 2 Way MV* Heat NO, Cool NC

25

-  Line Voltage 2 Way MV* Heat NC, Cool NC

26

-  Line Voltage 3 Way MV* #1 NO Diverting,  

#2 NO Diverting

27

-  Line Voltage 3 Way MV* #1 NC Diverting,  

#2 NO Diverting

28

-  Line Voltage 3 Way MV* #1 NC Diverting,  

#2 NC Diverting

29

-  24V 2 Way MV* Heat NO, Cool NO

30

-24V 2 Way MV* Heat NC, Cool NO

31

-  24V 2 Way MV* Heat NO, Cool NC

32

-  24V 2 Way MV* Heat NC, Cool NC

33

-  24V 3 Way MV* #1 NO Diverting,  

#2 NO Diverting

34

-  24V 3 Way MV* #1 NC Diverting,  

#2 NO Diverting

35

-  24V 3 Way MV* #1 NC Diverting,  

#2 NC Diverting

X

-   None

Item 14

A

Electric Heat

A

- 1   

B

- 1.5   

C

- 2   

D

- 3   

E

- 3.5   

F

- 4.3   

G

- 5   

H

- 6   

I

- 7.5   

J

- 10   

X

- No Electric Heat

Item 15

G

Secondary Drain 
Pan

G

- Galvanized Powder Coated (Custom Color)   

S

- Stainless Steel   

X

- None

Item 16

A

Flow Regulation 
Cooling Coil

A

- Balancing Valve 

B

- Circuit Setter 

C

- Autoflow Valve 0.5 GPM

D

- Autoflow Valve 1.0 GPM 

E

- Autoflow Valve 1.3 GPM 

F

- Autoflow Valve 1.5 GPM

G

- Autoflow Valve 2.0 GPM 

H

- Autoflow Valve 2.5 GPM 

I

- Autoflow Valve 2.8 GPM

J

- Autoflow Valve 3.0 GPM 

K

- Autoflow Valve 3.3 GPM 

L

- Autoflow Valve 3.5 GPM

M

- Autoflow Valve 4.0 GPM 

N

- Autoflow Valve 4.5 GPM 

O

- Autoflow Valve 5.0 GPM

P

- Autoflow Valve 5.5 GPM 

Q

- Autoflow Valve 6.0 GPM 

R

- Autoflow Valve 6.5 GPM

S

- Autoflow Valve 7.0 GPM 

T

- Autoflow Valve 7.5 GPM 

U

- Autoflow Valve 8.0 GPM

V

- Autoflow Valve 8.5 GPM 

W

- Autoflow Valve 9.0 GPM 

X

- None

Item 17

X

Flow Regulation 
Heating Coil

A

- Balancing Valve 

B

- Circuit Setter 

C

- Autoflow Valve 0.5 GPM

D

- Autoflow Valve 1.0 GPM 

E

- Autoflow Valve 1.3 GPM 

F

- Autoflow Valve 1.5 GPM

G

- Autoflow Valve 2.0 GPM 

H

- Autoflow Valve 2.5 GPM 

I

- Autoflow Valve 2.8 GPM

J

- Autoflow Valve 3.0 GPM 

K

- Autoflow Valve 3.3 GPM 

L

- Autoflow Valve 3.5 GPM

M

- Autoflow Valve 4.0 GPM 

N

- Autoflow Valve 4.5 GPM 

O

- Autoflow Valve 5.0 GPM

P

- Autoflow Valve 5.5 GPM 

Q

- Autoflow Valve 6.0 GPM 

R

- Autoflow Valve 6.5 GPM

S

- Autoflow Valve 7.0 GPM 

T

- Autoflow Valve 7.5 GPM 

U

- Autoflow Valve 8.0 GPM

V

- Autoflow Valve 8.5 GPM 

W

- Autoflow Valve 9.0 GPM 

X

- None

Item 18

1

Y-Strainer

1

- Y-Strainer   

2

- Y-Strainer Blow Down   

X

- None

Item 19

P

Purge Valve

P

- Yes   

X

-No

Item 20

P

PT Ports

P

- Yes   

X

-No

Item 21

M

Air Vents

M

- Manual   

A

- Automatic   

X

- None

Item 22

F

Condensate 
Overflow Switch

F

- Float   

E

- Electronic   

X

- None

Item 23

S

Pipe Connections

S

- Sweat   

M

- Male NPT   

F

- Female NPT   

U

- Unions

* MV = Motorized Valve

5

Содержание FCHC

Страница 1: ...codes and existing practices should be observed and preformed by a professional Due to ICE AIRs ongoing product development programs the information in this document is subject to change without notic...

Страница 2: ...ervice or service procedures If you install or perform service on this unit you assume responsibility for any personal injury or property damage which may result Many jurisdictions require a license t...

Страница 3: ...ctions Units should be installed no closer than 18 apart when two units are side by side A vertical clearance of 60 should be maintained between units 2 Adequate ceiling panel access must exist for ha...

Страница 4: ...l Elec Heat MCO K LH 2 Pipe Cool w Total Elec Heat ACO L LH 2 Pipe Heat Only M RH 4 Pipe Heat and Cool MCO N RH 4 Pipe Heat and Cool ACO O LH 4 Pipe Heat and Cool MCO P LH 4 Pipe Heat and Cool ACO Ite...

Страница 5: ...e Item 16 A Flow Regulation Cooling Coil A Balancing Valve B Circuit Setter C Autoflow Valve 0 5 GPM D Autoflow Valve 1 0 GPM E Autoflow Valve 1 3 GPM F Autoflow Valve 1 5 GPM G Autoflow Valve 2 0 GPM...

Страница 6: ...LH 2 Pipe Cool w Total Elec Heat ACO L LH 2 Pipe Heat Only M RH 4 Pipe Heat and Cool MCO N RH 4 Pipe Heat and Cool ACO O LH 4 Pipe Heat and Cool MCO P LH 4 Pipe Heat and Cool ACO Item 6 X Enclosure X...

Страница 7: ...Way MV Normally Open Diverting 17 24V 3 Way MV Normally Closed Routing w Bypass Pipe 18 24V 3 Way MV Normally Closed Diverting w Bypass Pipe 19 24V 3 Way MV Normally Open Routing w Bypass Pipe 20 24V...

Страница 8: ...ithout interference 7 A minimum obstructed distance of 36 should be kept around theunit IMPORTANT To avoid permanent damage to the unit DO NOT operate during construction in an open space or as a supp...

Страница 9: ...n the unit Piping Installation ICE AIRs Horizontal Concealed Fan Coil is available in either 2 pipe or 4 pipe configurations see below that are connected to the system through the use of a flexible ho...

Страница 10: ...2 Pipe System General Electric Line Voltage Wiring including the electrical ground must comply with the National Electrical Code as well as all applicable local codes Refer to the Electrical Data tab...

Страница 11: ...n motor when present Component Outline Field Wiring Factory Wiring Wire Color Wire Connector Field Connector CLG HTG C SI V Legend BLK CAP Front 3 2 1 6 5 4 9 8 7 12 11 10 1 2 3 4 5 6 7 8 9 10 11 12 M...

Страница 12: ...system with water leaving the air vents open Bleed all air from the system but do not allow the system to over flow Check the system for leaks and make any required repairs 4 Adjust the water and air...

Страница 13: ...leshooting Table Troubleshooting IMPORTANT It is not the intent of this maintenance manual to resolve any problems with the operation of your ICE AIR unit Please contact a trained servicer or building...

Страница 14: ...ation in Building Date Sales Order No In order to minimize troubleshooting and costly system failures complete the following checks and data entries before the system is put into full operation Temper...

Страница 15: ...son including any agent salesman dealer or distributor has authority to expand ICE AIRs obligation beyond the terms of these express warranties or to state that the performance of the product is other...

Отзывы: