Roof and Floor Penetrations 

Non-Combustibles Floor Penetration   

Minimum  openings  when  passing  through  a  floor  made  of 
non-combustible  materials  such  as  steel  structure,  concrete 
block or other type of masonry must be at least 2" larger than 
the outside diameter of the chimney leaving an unobstructed 
gap of 1” all around the chimney.  (OD + 2") 
 
It  is  also  required  to  use  a  Firestop  combined  with  a  Floor 
Guide or a Base Support in order to maintain clearance and 
stability.    Expansion  joints  may  be  required  in  order  to 
minimize the effects of thermal expansion. 

Figure 23 

Combustible Floor Penetration – 1000°F Chimney (UL 103 & ULC C-959 Listings) 

*  The  instructions  in  this  section  are  valid  for  Building  Heating  Appliances  (BHA)  with  venting  flue  gases  at  temperatures  not  exceeding  538°C 
(1000°F) under continuous operating conditions from gas, liquid, oil or solid fuel fired appliances.  Also complies with operation (less than one hour) 
at temperatures not exceeding 760°C (1400°F) and brief operation (maximum 10 minutes) at temperatures not exceeding 906°C (1700°F). 

 

An Insulated Radiation Shield must be used where a chimney passes through a 
floor made of combustible materials.  The Radiation Shield assembly is primarily 
used for floor and roof penetration (see following section for roof penetration) to 
protect  combustible  materials  from  heat  radiated  from  the  chimney,  maintain 
clearance  and  provide  firestoping.    See 

Table  8

  for  minimum  square  framing 

dimensions. 

 

1. The Radiation Shield is inserted into the framing hole from under the floor and 
secured from under the Firestop Plate using 8 wood screws #10 x 2". 
2. The Radiation Shield height  can be adjusted to the floor thickness by sliding 
the adjustable sleeve.  Excess insulation must be trimmed. 
3.  For  minimum  height  adjustment  remove  the  adjustable  sleeve  and  trim 
insulation.  The shield must be at least as tall as the floor thickness and cover all 
combustible material exposed in the floor opening. 
4. Can be pared with a floor guide (above the floor) for better stability. 

 

Figure 24 

 
 

 

 

Figure 25 

 

Figure 26 

 

Содержание VIP+ 1 Fiber

Страница 1: ...he ICC Model VIP venting system until you have carefully read the appliance and vent system installation instructions Use only ICC Model VIP components Failure to do so will void the certification and...

Страница 2: ...0 Base Support 10 Wall Support 11 Wall Guide 12 Floor Guide 12 Support Methods and System Design Limits 13 Rigid Structural Brace Specifications 14 Elbows and Offsets 14 Guy Wire 15 Roof and Floor Pen...

Страница 3: ...id oil or solid fuel fired appliances Also complies with operation less than one hour at temperatures not exceeding 760 C 1400 F and brief operation maximum 10 minutes at temperatures not exceeding 92...

Страница 4: ...6 to 24 6 7 Ventilated Firestop See Roof and Floor Penetrations section for details Part Numbers The following section describes how part number are defined for most of the major VIP products Please r...

Страница 5: ...for flue and casing 26 ga min up to 16 and 24 ga min 18 and over C Galvalume Alu Zinc Available for casing only 26 ga min up to 16 and 24 ga min 18 and over Standard materials only for other options...

Страница 6: ...ing the vent before closing up any enclosed areas Planning your Installation Prior to starting your installation we suggest you take the following into consideration 1 Check the appliance manufacturer...

Страница 7: ...amix TC 2280 F 1250 C Outer Joints Any Silicone Sealant with a min rating of 400 F 400 F Outer Joints Any Silicone Sealant with a min rating of 400 F 400 F Fortafix Ceramix TC cure time Air dry for 24...

Страница 8: ...to chimney label for flue gases direction Step 3 Assemble the flue locking band and secure by tightening the bolt Do not remove the excess of sealant Step 4 Install locking band insulation strip arou...

Страница 9: ...nd Bead of Fortafix Ceramix TC just above the formed bead when chimneys are joined together before interior locking band assembly Step 4 Assemble the interior locking band around the flue and secure b...

Страница 10: ...7 effective length that is welded to a steel plate The chimney section has female and male ends forming just like any standard length It can be connected to any other piece of piping with proper locki...

Страница 11: ...bands and sealant see Chimney Joint Connection Section for specific instructions It is supplied with both an Interior Locking Band a special External Finishing Band top female side and an Insulation S...

Страница 12: ...with a minimum of 3 anchors on each side by others See Table 7 for Maximum Vertical Spacing between 2 Supports or Guides MVS Figure 12 Figure 13 Floor Guide The Floor Guide is mainly used as a chimney...

Страница 13: ...plication Table 6 Maximum Supported Chimney Height and Support Method MCH Support Method VIP Chimney Model MCH feet VIP AIR Insulated VIP 1 Fiber VIP 2 Fiber VIP 4 Fiber Base Support 6 to 24 51 39 30...

Страница 14: ...burning appliances Chimneys for combination fuel heating appliances that are capable of burning solid fuel or are convertible to solid fuel are limited to 30 slope even if the current choice of fuel i...

Страница 15: ...The Guy Wire Band is made to hook up 3 guy wire by others at 120 apart or to be secured with Rigid Roof Brace by others The cables are secured to the roof by mean of tensioners by others and anchors b...

Страница 16: ...ss than one hour at temperatures not exceeding 760 C 1400 F and brief operation maximum 10 minutes at temperatures not exceeding 906 C 1700 F An Insulated Radiation Shield must be used where a chimney...

Страница 17: ...of combustible material It is designed to be installed on a flat roof or roof curb 8 to 16 high The roof framing dimensions are presented in Table 8 in the previous Section 1 The Radiation Shield is i...

Страница 18: ...primarily used for Engines or High Temperature Applications where a chimney section passes through a roof made of combustible material It is designed to be installed on a flat roof or roof curb 4 to 1...

Страница 19: ...to 6 inches water column can effectively use the Expansion Length Table 9 Allowable lengths for 1 4 thermal expansion T Gas T Surroundings T F Length between fixed points 200 12 6 300 8 4 400 6 3 500...

Страница 20: ...oint Connection Section 4 Bellow Joint is used for axial movements and vibration only and must be accurately supported and guided This part has limited lateral movement Lateral offsets and parallel mi...

Страница 21: ...asket between the two flanges and secure with the supplied bolts Use a star tightening pattern of the bolts for better stability Re tighten the compression band bolt if necessary 6 Install Insulation...

Страница 22: ...all precautions for cleaning sealed surfaces and use proper sealant as described in the Sealant Application Chart section see Table 4 It can be used in horizontal or vertical runs and also between el...

Страница 23: ...Model VIP 23 Owner s Manual Figure 36...

Страница 24: ...Model VIP 24 Owner s Manual Figure 37...

Страница 25: ...ending from the penetration through any concealed spaces to or through the roof so as to maintain the integrity of the fire separations required by the applicable building code The enclosure shall be...

Страница 26: ...be used to integrate automatic cleaning or fire suppression devices by others to a Grease Duct installation The Nozzle Length comes with a 3 4 NPT nipple both ends that can be connected to an automat...

Страница 27: ...sote makes an extremely hot fire For this reason the duct should be inspected at least once every two months to determine if a creosote or soot buildup has occurred Consult local code and officials as...

Страница 28: ...m position 2 T2 Grease Tee Figure 46 has inverted female and male ends and covers mostly horizontal grease dam configurations Refer to Figure 47 for dam position When ordering you GreaseTee please spe...

Страница 29: ...Fan Adapter Roof Curb by others Exhaust Hoods by others Grease Duct Wye Tee Cap Grease Tee T2 P3 Dam Position Chimney Sections 90 Tee Standard TR Horizontal Band Base Support Base Support Supporting...

Страница 30: ...vanized or steel surfaces must be protected at all times by a minimum of one base coat of primer and one finish coat of heat resistant and corrosion resistant paint Stainless steel surfaces need not b...

Отзывы: