Additionally
you
can
use
the
following
command
to
reconfigure
smaller
amounts
of
central
storage
online
or
offline:
CF
STOR(nnM),<OFFLINE/ONLINE>
To
reconfigure
an
expanded
storage
element
offline
or
online,
use
the
following
z/OS
operator
command:
CF
ESTOR(E=x),<OFFLINE/ONLINE>
Reconfigurable
Storage
Unit
(RSU)
Considerations:
The
RSU
parameter
should
be
set
to
the
same
value
that
you
specified
in
the
central
storage
Reserved
field.
See
z/OS
MVS
Initalization
and
Tuning
Reference
for
appropriate
RSU
parameter
syntax.
v
Reconfiguration,
either
offline
or
online,
of
channel
paths
by
z/OS
operator
commands
is
supported
on
a
System
z9.
This
capability
also
allows
channel
paths
to
be
moved
among
LPs
using
z/OS
operator
commands.
v
Preferred
paths
to
a
device
are
supported
on
a
System
z9.
If
the
preferred
path
parameter
is
specified
in
an
LPAR
IOCDS,
it
is
accepted.
v
Specifying
SHAREDUP
for
devices
is
not
recommended.
If
used,
z/OS
treats
the
device
as
a
SHARED
device.
v
Each
z/OS
LP
can
run
the
Resource
Measurement
Facility
(RMF).
RMF
enhancements
for
PR/SM
allow
a
single
LP
to
record
system
activities
and
report
them
in
the
Partition
Data
Report.
To
enable
this,
use
the
Change
LPAR
Security
task
available
from
the
CPC
Operational
Customization
task
list
and
select
Performance
Data
Control
for
the
LP.
For
z/OS,
RMF
reporting
includes
LPAR
Management
Time.
v
RMF
provides
enhanced
reporting
for
coupling
facility
configurations.
v
RMF
with
APAR
support
identifies
which
logical
and
physical
CPs
are
of
each
type
when
any
combination
of
general
purpose,
IFA,
IFL,
zIIP
and
ICF
processors
are
present
in
the
configuration
on
its
partition
data
report.You
can
have
up
to
32
virtual
machines
running
z/OS
within
a
simulated
sysplex,
with
each
z/OS
virtual
machine
coupled
to
up
to
8
virtual
machines
running
as
coupling
facilities
EREP
Each
control
program
operating
in
an
LP
has
its
own
environmental
recording,
editing,
and
printing
(EREP)
processing.
EREP
records
for
ICP
channel
paths
go
to
the
z/OS
logs
of
the
z/OS
systems
attached
to
a
coupling
facility
LP.
Chapter
1.
Introduction
to
Logical
Partitions
1-21
Содержание Z9
Страница 1: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Страница 2: ......
Страница 3: ...System z9 Processor Resource Systems Manager Planning Guide SB10 7041 03...
Страница 12: ...x PR SM Planning Guide...
Страница 18: ...xvi PR SM Planning Guide...
Страница 26: ...xxiv PR SM Planning Guide...
Страница 43: ...ZVSE ZVM Figure 1 1 Characteristics of Logical Partitions Chapter 1 Introduction to Logical Partitions 1 17...
Страница 54: ...1 28 PR SM Planning Guide...
Страница 126: ...2 72 PR SM Planning Guide...
Страница 195: ...Figure 3 23 Security Page Image Profile Chapter 3 Determining the Characteristics of Logical Partitions 3 69...
Страница 220: ...4 8 PR SM Planning Guide...
Страница 232: ...5 12 PR SM Planning Guide...
Страница 250: ...B 16 PR SM Planning Guide...
Страница 266: ...D 10 PR SM Planning Guide...
Страница 272: ...X 6 PR SM Planning Guide...
Страница 273: ......
Страница 274: ...Printed in USA SB10 7041 03...