![IBM TotalStorage NAS 200 25T Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/ibm/totalstorage-nas-200-25t/totalstorage-nas-200-25t_quick-start-instructions_3463861009.webp)
Step 5: Attach cables (Rack configuration)
1.
Connect the engine to your network by pressing in on the safety latches,
sliding the engine halfway into the rack, and plugging the network cables
to the Ethernet ports and then into your network. Connect each power
cable to the receptacles on the back of the engine and then to different
power source outlets.
2.
Route the cables through the cable-management assembly on the rack.
A
2
3
1
1
3
1
B
A
B
IBM TotalStorage
™
NAS 200Model 25T Quick Start Instructions
7
Содержание TotalStorage NAS 200 25T
Страница 1: ...IBM TotalStorage NAS 200 Model 25T Quick Start Instructions...
Страница 14: ...12 NAS 200 Model 25T Quick Start Instructions...
Страница 15: ......
Страница 16: ...Printed in U S A...