Step 3: Install the appliance
1.
Tower configuration only:
Place the tower configuration in its final location
and then go to “Step 4: Attach cables (Tower configuration)” on page 6.
Rack configuration only:
Mark the rack-configuration location on the rack
by placing the provided stickers over the holes on the front and rear of the
rack indicated by the arrows on the template.
2.
Insert the cage nuts using a screwdriver or the cage-nut insertion tool (or
slide on the clip nuts) into each marked hole.
IBM TotalStorage
™
NAS 200Model 25T Quick Start Instructions
3
Содержание TotalStorage NAS 200 25T
Страница 1: ...IBM TotalStorage NAS 200 Model 25T Quick Start Instructions...
Страница 14: ...12 NAS 200 Model 25T Quick Start Instructions...
Страница 15: ......
Страница 16: ...Printed in U S A...