IBM TotalStorage
™
NAS 200Model 25T Quick Start
Instructions
Step 1: Read this first
Caution:
—
Safety Information
Use safe practices when lifting this product.
Do not place any object weighing more than 82 kg (180 lb.) on top of
rack-mounted devices.
Notes:
1.
Make sure the rack is stabilized before installing hardware, and always
load it starting at the bottom and moving upward to the top.
2.
Visually inspect the unit to ensure that it was not damaged during
shipping. If any items are missing or damaged, contact your IBM
representative.
Step 2: Unpack the box
Items you find in the box (tower and rack configurations):
OR
v
Model 25T
v
Two
power cables
© Copyright IBM Corp. 2002
1
Содержание TotalStorage NAS 200 25T
Страница 1: ...IBM TotalStorage NAS 200 Model 25T Quick Start Instructions...
Страница 14: ...12 NAS 200 Model 25T Quick Start Instructions...
Страница 15: ......
Страница 16: ...Printed in U S A...